Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nakada, Akira; Kanai, Katsuta; Kokubun, Yuji; Nagaoka, Mika; Koike, Yuko; Yamada, Ryohei*; Kubota, Tomohiro; Hirao, Moe; Yoshii, Hideki*; Otani, Kazunori*; et al.
JAEA-Review 2022-079, 116 Pages, 2023/03
Based on the regulations (the safety regulation of Tokai Reprocessing Plant, the safety regulation of nuclear fuel material usage facilities, the radiation safety rule, the regulation about prevention from radiation hazards due to radioisotopes, which are related with the nuclear regulatory acts, the local agreement concerning with safety and environment conservation around nuclear facilities, the water pollution control law, and by law of Ibaraki Prefecture), the effluent control of liquid waste discharged from the Nuclear Fuel Cycle Engineering Laboratories of Japan Atomic Energy Agency has been performed. This report describes the effluent control results of the liquid waste in the fiscal year 2021. In this period, the concentrations and the quantities of the radioactivity in liquid waste discharged from the reprocessing plant, the plutonium fuel fabrication facilities, and the other nuclear fuel material usage facilities were much lower than the limits authorized by the above regulations.
Nakano, Masanao; Nakada, Akira; Kanai, Katsuta; Nagaoka, Mika; Koike, Yuko; Yamada, Ryohei; Kubota, Tomohiro; Yoshii, Hideki*; Otani, Kazunori*; Hiyama, Yoshinori*; et al.
JAEA-Review 2021-040, 118 Pages, 2021/12
Based on the regulations (the safety regulation of Tokai Reprocessing Plant, the safety regulation of nuclear fuel material usage facilities, the radiation safety rule, the regulation about prevention from radiation hazards due to radioisotopes, which are related with the nuclear regulatory acts, the local agreement concerning with safety and environment conservation around nuclear facilities, the water pollution control law, and by law of Ibaraki Prefecture), the effluent control of liquid waste discharged from the Nuclear Fuel Cycle Engineering Laboratories of Japan Atomic Energy Agency has been performed. This report describes the effluent control results of the liquid waste in the fiscal year 2020. In this period, the concentrations and the quantities of the radioactivity in liquid waste discharged from the reprocessing plant, the plutonium fuel fabrication facilities, and the other nuclear fuel material usage facilities were much lower than the limits authorized by the above regulations.
Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Takagi, Yasuhiko*; Nakamura, Tomoki*; Hiroi, Takahiro*; Matsuoka, Moe*; et al.
Nature Astronomy (Internet), 5(3), p.246 - 250, 2021/03
Times Cited Count:30 Percentile:96.42(Astronomy & Astrophysics)Here we report observations of Ryugu's subsurface material by the Near-Infrared Spectrometer (NIRS3) on the Hayabusa2 spacecraft. Reflectance spectra of excavated material exhibit a hydroxyl (OH) absorption feature that is slightly stronger and peak-shifted compared with that observed for the surface, indicating that space weathering and/or radiative heating have caused subtle spectral changes in the uppermost surface. However, the strength and shape of the OH feature still suggests that the subsurface material experienced heating above 300 C, similar to the surface. In contrast, thermophysical modeling indicates that radiative heating does not increase the temperature above 200
C at the estimated excavation depth of 1 m, even if the semimajor axis is reduced to 0.344 au. This supports the hypothesis that primary thermal alteration occurred due to radiogenic and/or impact heating on Ryugu's parent body.
Tanaka, Minori*; Watabane, Masashi*; Machida, Masahiko; Yamada, Susumu; Enomoto, Yota*; Gunji, Kota*; Arikawa, Taro*
Doboku Gakkai Rombunshu, B2 (Kaigan Kogaku) (Internet), 76(2), p.I_103 - I_108, 2020/11
no abstracts in English
Kamiya, Junichiro; Okabe, Kota; Kinsho, Michikazu; Moriya, Katsuhiro; Yamada, Ippei; Ogiwara, Norio*; Hikichi, Yusuke*; Wada, K.*
Journal of Physics; Conference Series, 1350, p.012149_1 - 012149_6, 2019/12
Times Cited Count:2 Percentile:75.02To obtain a getter effect to titanium vacuum duct surface, the method to remove the oxide on the surface by sputtering with ionized molecules has been developed. In the method, a sheet-shaped gas distribution with a uniform and high density is generated through a narrow slit by a small amount of gas. In this report, the gas density distribution was calculated by the Monte Carlo simulation code. As a result, it was found that a gas injection from both directions was effective to generate uniform density distribution. Furthermore, the gas injection method was applied to a non-destructive beam profile monitor, that detects ions generated by the interaction between gas molecules and beam. In this monitor, dependence of the beam profile on the injected gas amount was measured. A small amount of injected gas was found to be ideal for the beam profile measurements in the unsaturated and a high S/N ratio region.
Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Arai, Takehiko*; Nakauchi, Yusuke*; Nakamura, Tomoki*; Matsuoka, Moe*; et al.
Science, 364(6437), p.272 - 275, 2019/04
Times Cited Count:233 Percentile:99.75(Multidisciplinary Sciences)The near-Earth asteroid 162173 Ryugu, the target of Hayabusa2 sample return mission, is believed to be a primitive carbonaceous object. The Near Infrared Spectrometer (NIRS3) on Hayabusa2 acquired reflectance spectra of Ryugu's surface to provide direct measurements of the surface composition and geological context for the returned samples. A weak, narrow absorption feature centered at 2.72 micron was detected across the entire observed surface, indicating that hydroxyl (OH)-bearing minerals are ubiquitous there. The intensity of the OH feature and low albedo are similar to thermally- and/or shock-metamorphosed carbonaceous chondrite meteorites. There are few variations in the OH-band position, consistent with Ryugu being a compositionally homogeneous rubble-pile object generated from impact fragments of an undifferentiated aqueously altered parent body.
Ochi, Kotaro; Urabe, Yoshimi*; Yamada, Tsutomu*; Sanada, Yukihisa
Analytical Chemistry, 90(18), p.10795 - 10802, 2018/09
Times Cited Count:2 Percentile:7.47(Chemistry, Analytical)After the Fukushima Daiichi Nuclear Power Station accident, the distributions of sediment-associated radiocesium have been investigated to evaluate the dispersion and accumulation of radiocesium in the reservoir field. To develop an analytical method for measuring the horizontal and vertical distributions of radiocesium on a wide scale, we obtained 253 -ray spectra using a NaI(Tl) scintillation detector at the bottom of 64 ponds in Fukushima during 2014-2016. The depth profile of sediment-associated radiocesium was found to be correlated with intensities of scattered and photo peaks. In parallel, core sediments were collected in same ponds to validate the estimates. Good agreement was observed between the results of in situ spectrometry and core sampling. These results indicated that our developed method would be a good approach for understanding the behavior of radiocesium and determining whether decontamination of reservoirs is required.
Yamada, Keisuke; Saito, Yuichi; Yokota, Wataru
Review of Scientific Instruments, 85(2), p.02A920_1 - 02A920_3, 2014/02
Times Cited Count:1 Percentile:5.94(Instruments & Instrumentation)Ito, Kenichi*; Miyahara, Hidetaka*; Ujiie, Toru*; Takeshima, Toshikatsu*; Yokoyama, Shingo*; Nakata, Kotaro*; Nagano, Tetsushi; Sato, Tsutomu*; Hatta, Tamao*; Yamada, Hirohisa*
Nihon Genshiryoku Gakkai Wabun Rombunshi, 11(4), p.255 - 271, 2012/04
no abstracts in English
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.
JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 173, 2012/01
Three electrostatic accelerators of TIARA were operated smoothly in FY 2010, and all the planned experiments were carried out except those canceled by users or the impact of Great East Japan Earthquake on March 11, 2011. On the other hand, Saturday operation for experiments was carried out after October on the Global Nuclear-Human Resource Development Initiative. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2116, 2367 and 1800 hours, respectively, which were similar to those of usual years. Regarding the single-ended accelerator, the generator in the high-voltage terminal failed and was replaced with new one. A switching magnet was installed for a new branch beam line of the ion implanter. As to the tandem accelerator, In ion was generated and accelerated at intensity of 500 nA.
Yamada, Keisuke; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; et al.
Proceedings of 8th Annual Meeting of Particle Accelerator Society of Japan (Internet), 3 Pages, 2011/08
no abstracts in English
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.
JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 181, 2011/01
Three electrostatic accelerators of TIARA were operated smoothly in FY 2009, and all the planned experiments were carried out except those canceled by users. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2100, 2416 and 1866 hours, respectively. Regarding the single-ended accelerator, the radio frequency oscillator of the ion source mounted in high-voltage terminal and the sequencer for control of the SB beam line failed, and they were replaced. The oven controller of Freeman ion source of the ion implanter was renewed. As to the tandem accelerator, Mn ion was successfully generated and accelerated with intensity of 150 nA.
Chiba, Atsuya; Uno, Sadanori; Yamada, Keisuke; Yokoyama, Akihito; Agematsu, Takashi; Yokota, Wataru; Kitano, Toshihiko*; Takayama, Terumitsu*; Kanai, Shinji*; Orimo, Takao*; et al.
Dai-23-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.119 - 122, 2010/11
Operation times of each accelerator are keeping the same level as in recent 10 years, Tandem accelerator, Single-ended and Ion implanter amounted to about 2,000, 2,500 and 1,900 hours, respectively. In the last fiscal year, we succeeded in maintaining the terminal voltage of the tandem accelerator to high stability for long periods by exchanging the material of a corona-probe needle to the tungsten (NPS Co.). In the ion-implanter, the oven control system equipped with the Freeman ion source was renewed. There was no trouble to affect on the machine-time in the last fiscal year, so the all planned experiments were carried out.
Tokiwa, Tetsuya; Asamori, Koichi; Hiraga, Naoto*; Yamada, Osamu; Moriya, Hirokazu*; Hotta, Hikaru*; Kitamura, Itaru*; Yokota, Hideharu
Proceedings of 13th International Conference on Environmental Remediation and Radioactive Waste Management (ICEM 2010) (CD-ROM), p.117 - 122, 2010/10
In this paper, we discuss the relationship between the accurate hypocentral distribution and 3-D geological structure in and around the Horonobe area, Japan. We carried out multiplet-clustering analysis by using data of the 421 micro-earthquakes which occurred from 1st September, 2003 to 30th September, 2007. The 3-D geological structure model was mainly constructed from previous seismic reflection profiles and drilling data. As a result of this analysis, although there are some differences in depth between them, the hypocenters are distributed in NNW-SSE direction and become deeper from the west toward the east. The distributed pattern of the hypocenters is similar to the one of the geological structure. These results indicate that the hypocentral distribution may represent existence of active zone related to the geological structure, and provide effective information which can contribute to establishing methods for estimating the future evolution of the geological environment.
Yoshida, Kenichi; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yuyama, Takahiro; Ishizaka, Tomohisa; Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; et al.
Proceedings of 7th Annual Meeting of Particle Accelerator Society of Japan (DVD-ROM), p.23 - 26, 2010/08
no abstracts in English
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Yokota, Wataru; et al.
JAEA-Review 2009-041, JAEA Takasaki Annual Report 2008, P. 175, 2009/12
Three electrostatic accelerators of TIARA were operated smoothly in FY 2008, and all the planned experiments were carried out except those canceled by users. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 2009, 2426 and 1882 hours, respectively. Regarding the tandem accelerator, the control system was renewed, and the unstable acceleration voltage caused by mechanical vibration reduced by adjusting the driving mechanism of the pellet chains. The SF gas for the single-ended accelerator was purified, and its storage tank was repainted. As to the ion implanter, Bi
ion, which was requested by users, was successfully generated and accelerated with intensity of 0.5
A.
Saito, Yuichi; Yokota, Wataru; Nara, Takayuki; Agematsu, Takashi; Okumura, Susumu; Uno, Sadanori; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; et al.
Proceedings of the 8th International Workshop on Radiation Effects on Semiconductor Devices for Space Applications (RASEDA-8), p.95 - 98, 2008/12
Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; Yamada, Keisuke; Yokoyama, Akihito; Saito, Yuichi; Ishii, Yasuyuki; Sato, Takahiro; Okubo, Takeru; Mizuhashi, Kiyoshi; et al.
JAEA-Review 2008-055, JAEA Takasaki Annual Report 2007, P. 191, 2008/11
Three electrostatic accelerators were operated smoothly in FY 2007, and all the planned experiments were carried out except those canceled by users. The yearly operation time of the tandem accelerator, the single-ended accelerator and the ion implanter amounted to 1949, 2437 and 1900 hours. The high-pressure residual gas of SF is leaking from the SF
gas handling system of the tandem accelerator. The most amount of the leak comes out when the accelerator tank pressure is high. Therefore, in order to reduce the leak by lowering the residual gas pressure, a pipe was installed to carry the gas in the high-pressure part of the system for the accelerator to the low-pressure storage tank. As to the ion implanter, Pb ion, which was requested by users, was successfully generated using oven method and accelerated with intensity of 1.5
A.
Yokota, Wataru; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Agematsu, Takashi; Uno, Sadanori; Chiba, Atsuya; et al.
Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.22 - 24, 2008/08
no abstracts in English
Yamada, Keisuke; Okoshi, Kiyonori; Saito, Yuichi; Mizuhashi, Kiyoshi; Yokota, Wataru
JAEA-Review 2006-042, JAEA Takasaki Annual Report 2005, P. 189, 2007/02
no abstracts in English