Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
C and 500
CTakagi, Honoka*; Yabutsuka, Takeshi*; Hayashida, Hirotoshi*; Song, F.; Kai, Tetsuya; Shinohara, Takenao; Kurita, Keisuke; Iikura, Hiroshi; Yamamoto, Norio*; Nakajima, Minoru*; et al.
Solid State Ionics, 417, p.116716_1 - 116716_7, 2024/12
Times Cited Count:3 Percentile:25.08(Chemistry, Physical)Yamamoto, Kazami; Ogiwara, Norio*; Kuramochi, Masaya*
e-Journal of Surface Science and Nanotechnology (Internet), 21(4), p.359 - 364, 2023/07
In recent years, durable target is required according to increase of the beam power. To solve this problem, a liquid film was formed in vacuum and tested it as a target. An ethanol and a mercury were selected as liquid target materials, and we investigated whether the liquid sheet could be formed stably in a vacuum and how about the vacuum pressure. As a result, it was confirmed that the liquid films were stably formed in both case and the pressures with the films were about the vapor pressure of the materials.
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:10 Percentile:73.53(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
JAEA-Technology 2021-019, 105 Pages, 2021/11
Since a user operation startup, the 3 GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS, such as the magnet, vacuum chambers, beam monitors, etc., increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have organized a task force for the installation of the shield. The task force has aimed to optimize the structure of the radiation shield, construct the installation procedure with due consideration of the worker's dose suppression. As the examination result of the shield design, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The renewal work required to install the shielding has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area. It was a large-scale work to occupy the beam injection area during almost of the summer maintenance period. However, it is considered very meaningful for dose suppression in future maintenance works.
Nakanoya, Takamitsu; Kamiya, Junichiro; Yoshimoto, Masahiro; Takayanagi, Tomohiro; Tani, Norio; Kotoku, Hirofumi*; Horino, Koki*; Yanagibashi, Toru*; Takeda, Osamu*; Yamamoto, Kazami
Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.238 - 242, 2021/10
Since a user operation startup, the 3GeV synchrotron accelerator (Rapid-Cycling Synchrotron: RCS) gradually reinforced the beam power. As a result, the surface dose rate of the apparatus located at the beam injection area of the RCS increases year by year. The beam injection area has many apparatuses which required manual maintenance, so reducing worker's dose is a serious issue. To solve this problem, we have decided to adopt removal shielding that could be installed quickly and easily when needed. We carried out shield installation work during the 2020 summer maintenance period. The installation work of the shield has been carried out in a under high-dose environment. For this reason, reducing the dose of workers was an important issue. So, we carefully prepared the work plan and work procedure in advance. During the work period, we implemented various dose reduction measures and managed individual dose carefully. As a result, the dose of all workers could be kept below the predetermined management value. We had installed removal shielding at the beam injection area in the 2020 summer maintenance period. We confirmed that this shield can contribute to the reduction of the dose during work near the beam injection area.
Morishita, Yuki; Yamamoto, Seiichi*; Momose, Takumaro; Kaneko, Junichi*; Nemoto, Norio
Radiation Protection Dosimetry, 178(4), p.414 - 421, 2018/03
Times Cited Count:0 Percentile:0.00(Environmental Sciences)Plutonium dioxide (PuO
) is used to fabricate a mixed oxide fuel for fast breeder reactors. When a glove box containing PuO
fails, such as by rupture of a glove or a vinyl bag, airborne contamination of plutonium (Pu) can occur. If the worker inhale PuO
particles, they deposit in the lung and cause lung cancer. The nasal smear and nose blow methods are useful for checking workers for PuO
intake in the field. However, neither method can evaluate the quantitative activity of Pu. No alpha-particle detector that can be used for direct measurements in the nasal cavity has been developed. Therefore, we developed a nasal monitor capable of directly measuring the activity of Pu in the nasal cavity to precisely evaluate the internal exposure dose of a worker. Prismatic-shaped 2
2 acrylic light guides were used to compose a detector block, and a ZnS(Ag) scintillator was adhered to the surface of these light guides. Silicon photomultiplier (SiPM) arrays with 8
8 channels were used as a photodetector. Actual PuO
particles were measured using the nasal monitor. The nasal monitor could be directly inserted in the nasal cavities. The activity distribution of Pu was obtained by the nasal monitor. The average efficiencies in 4
were 11.43% and 11.58% for the left and right nasal cavities, respectively. The effect of
and
rays on the detection of the alpha particles of Pu was negligible. The difference in the measured Pu activity between the ZnS(Ag) scintillation counter and the nasal monitor was within 4.0%. The developed nasal monitor can solve the uncertainty problem encountered with the nasal smear and the nose blow methods. We expect this monitor to be useful for accurately estimating the internal exposure dose of workers.
Saha, P. K.; Shobuda, Yoshihiro; Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Tamura, Fumihiko; Tani, Norio; Yamamoto, Masanobu; Watanabe, Yasuhiro; et al.
Physical Review Accelerators and Beams (Internet), 21(2), p.024203_1 - 024203_20, 2018/02
Times Cited Count:16 Percentile:71.49(Physics, Nuclear)Ogiwara, Norio; Hikichi, Yusuke*; Kamiya, Junichiro; Yamamoto, Kazami; Kinsho, Michikazu
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.563 - 567, 2017/12
Morishita, Yuki; Yamamoto, Seiichi*; Izaki, Kenji; Kaneko, Junichi*; Nemoto, Norio
Radiation Measurements, 103, p.33 - 38, 2017/08
Times Cited Count:15 Percentile:74.00(Nuclear Science & Technology)Nuclear fuel materials, such as uranium and plutonium (Pu), are handled at nuclear fuel facilities. There are a contamination source of Pu in tight spaces that cannot be directly measured by a ZnS(Ag) scintillation detector, such as interspace between a glovebox window and a platform, pipe flange, port cover of vinyl bag, and filter interspaces. Therefore, we developed a new imaging detector called a flexible alpha camera that enables to identify the Pu contamination for tight spaces at work sites. The thickness of the flexible alpha camera was only
1/5 of the ZnS(Ag) scintillation detector, and its efficiency for 4-pi direction was 42.7% for 5.5-MeV alpha particles. Minimal detectable activity (MDA) was 0.014 Bq. Four types of PuO
sample, removed from a duct, Bag-In/Bag-Out port, glovebox glove, and vinyl sheet, were measured by the flexible alpha camera and the PuO
particle was automatically identified. Using the flexible alpha camera, the Pu contamination source can be quickly detected, preventing the spread of contamination.
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; et al.
Physical Review Accelerators and Beams (Internet), 20(6), p.060402_1 - 060402_25, 2017/06
Times Cited Count:37 Percentile:90.11(Physics, Nuclear)The 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) is the world's highest class of high-power pulsed proton driver, aiming for an output beam power of 1 MW. The most important issues in realizing such a high-power beam operation are to control and minimize beam loss for maintaining machine activations within permissible levels. In RCS, numerical simulation was successfully utilized along with experimental approaches to isolate the mechanism of beam loss and find its solution. By iteratively performing actual beam experiments and numerical simulations, and also by several hardware improvements, we have recently established a 1-MW beam operation with very low fractional beam loss of a couple of 10
. In this paper, our recent efforts toward realizing such a low-loss high-intensity beam acceleration are presented.
Shobuda, Yoshihiro; Saha, P. K.; Hotchi, Hideaki; Harada, Hiroyuki; Takayanagi, Tomohiro; Tamura, Fumihiko; Tani, Norio; Togashi, Tomohito; Toyama, Takeshi*; Watanabe, Yasuhiro; et al.
Proceedings of 8th International Particle Accelerator Conference (IPAC '17) (Internet), p.2946 - 2949, 2017/05
no abstracts in English
Shobuda, Yoshihiro; Chin, Y. H.*; Saha, P. K.; Hotchi, Hideaki; Harada, Hiroyuki; Irie, Yoshiro*; Tamura, Fumihiko; Tani, Norio; Toyama, Takeshi*; Watanabe, Yasuhiro; et al.
Progress of Theoretical and Experimental Physics (Internet), 2017(1), p.013G01_1 - 013G01_39, 2017/01
Times Cited Count:20 Percentile:71.14(Physics, Multidisciplinary)The Rapid Cycling Synchrotron (RCS), whose beam energy ranges from 400 MeV to 3 GeV and which is located in the Japan Proton Accelerator Research Complex, is a kicker-impedance dominant machine, which violates the impedance budget from a classical viewpoint. Contrary to conventional understanding, we have succeeded to accelerate a 1-MW equivalent beam. The machine has some interesting features: for instance, the beam tends to be unstable for the smaller transverse beam size, the beam is stabilized by increasing the peak current
. Space charge effects play an important role in the beam instability at the RCS. In this study, a new theory has been developed to calculate the beam growth rate with the head-tail and coupled-bunch modes (
) while taking space charge effects into account. The theory sufficiently explains the distinctive features of the beam instabilities at the RCS.
Hotchi, Hideaki; Harada, Hiroyuki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.61 - 65, 2016/11
After the RF power supply upgrade, the J-PARC 3-GeV RCS restarted a 1-MW beam test in October 2015. In the beam test in October, we successfully removed longitudinal beam loss by beam loading compensation as well as minimized space-charge induced beam loss by injection painting. In addition, in this beam test, beam instability was also well suppressed by controlling the tune and the chromaticity. Furthermore, in the following beam test, the transverse painting area was successfully expanded by introducing both quadrupole correctors and anti-correlated painting scheme, by which a foil scattering part of beam loss during charge-exchange injection was further reduced. By these recent efforts, the 1-MW beam operation is now estimated to be established within a permissible beam loss level. This paper presents recent progresses of 1-MW beam tuning with particular emphasis on our approaches to beam loss issues.
Tani, Norio; Watanabe, Yasuhiro; Hotchi, Hideaki; Harada, Hiroyuki; Yamamoto, Masanobu; Kinsho, Michikazu; Igarashi, Susumu*; Sato, Yoichi*; Shirakata, Masashi*; Koseki, Tadashi*
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.708 - 711, 2016/11
At the J-PARC Main Ring (MR), there have been various investigation carried out at the moment aiming at the beam operation of MW order. As one of the investigations, a study of the Rapid-Cycling Synchrotron (RCS) magnets was implemented. Increase of the extraction energy of RCS was needed to reduce beam loss, as beam loss in the MR injection region was large under influence of Space Charge effect at the injection beam of 3GeV. Therefore conceptual design of the extraction energy upgrade using dipole and quadrupole magnets of RCS was performed. In this paper, we will report the contents of the study in extraction energy upgrade of RCS magnets and problems which became clear as a result.
Hotchi, Hideaki; Harada, Hiroyuki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; et al.
Proceedings of 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB 2016) (Internet), p.480 - 485, 2016/08
The J-PARC 3-GeV RCS has achieved a 1-MW beam acceleration in January 2015. Since then, a large fraction of our effort has been focused on reducing and managing beam losses. In the beam test in October 2015, we successfully minimized space-charge induced beam loss by optimizing the injection painting technique, as well as suppressed beam instability by controlling the tune and the chromaticity. In addition, in the recent beam test, the transverse painting area was successfully expanded by introducing both quadrupole correctors and anti-correlated painting scheme, by which a foil scattering part of beam loss during charge-exchange injection was further reduced. By such recent efforts, the 1-MW beam operation is now estimated to be established within a permissible beam loss level. In this talk, recent progresses of RCS beam commissioning are reported with particular emphasis on our approaches to beam loss issues.
Hotchi, Hideaki; Harada, Hiroyuki; Kato, Shinichi; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; et al.
Proceedings of 7th International Particle Accelerator Conference (IPAC '16) (Internet), p.592 - 594, 2016/06
The J-PARC 3-GeV RCS achieved a 1-MW beam acceleration in January 2015. Since then, a large fraction of our effort has been focused on reducing and managing beam losses. Major part of beam loss, such as space-charge induced beam loss, was well minimized by introducing injection painting. Uncontrolled beam loss arising from large-angle foil scattering during charge-exchange injection was also reduced drastically by the expansion of the transverse painting area, which was achieved by introducing quadrupole correctors and anti-correlated painting. By such recent efforts, the 1-MW beam operation is now estimated to be established within a permissible beam loss level. This paper presents the recent progress of 1-MW beam tuning, especially focusing on our approaches to beam loss issues.
Saha, P. K.; Shobuda, Yoshihiro; Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Nomura, Masahiro; Tamura, Fumihiko; Tani, Norio; Watanabe, Yasuhiro; et al.
Proceedings of 7th International Particle Accelerator Conference (IPAC '16) (Internet), p.589 - 591, 2016/06
Tani, Norio; Yamamoto, Masanobu; Kamiya, Junichiro; Hotchi, Hideaki; Kinsho, Michikazu
JPS Conference Proceedings (Internet), 8, p.012016_1 - 012016_6, 2015/09
J-PARC 3GeV RCS suffered from the misalignments of several millimeters of the magnets in both horizontal and vertical directions caused by the Tohoku Region Pacific Coast Earthquake on March 11, 2011. As the result of the orbit calculation showed that the beam loss was acceptable for beam operation at 300 kW, beam operation with the current placement was implemented until May, 2013. However according to the simulation of beam loss at 1 MW operation, it was found out that the beam loss increased and the horizontal emittance expanded. Therefore it was understood that 1 MW operation was difficult without the realignment of the beamline. The realignment of the beamline was carried out from July to November, 2013 in conjunction with the upgrade of Linac. During the realignment, the adjustment of the magnets and the ceramics chambers was mainly performed. The magnets were adjusted to within
0.2 mm. The ceramics chambers were aimed to be adjusted within
0.5 mm. Beam commissioning started on January 30, 2014. RCS succeeded in injection of 400 MeV beam from the upgraded Linac and extraction of 3GeV beam to MLF. In this paper, the alignment result of the magnets and the ceramics chambers that constitute the beamline of 3 GeV RCS is reported.
Hwang, J.-G.*; Kim, E.-S.*; Miyajima, Tsukasa*; Honda, Yosuke*; Harada, Kentaro*; Shimada, Miho*; Takai, Ryota*; Kume, Tatsuya*; Nagahashi, Shinya*; Obina, Takashi*; et al.
Nuclear Instruments and Methods in Physics Research A, 753, p.97 - 104, 2014/07
Times Cited Count:7 Percentile:43.54(Instruments & Instrumentation)Hayashi, Naoki; Harada, Hiroyuki; Horino, Koki; Hotchi, Hideaki; Kamiya, Junichiro; Kinsho, Michikazu; Saha, P. K.; Shobuda, Yoshihiro; Takayanagi, Tomohiro; Tani, Norio; et al.
Proceedings of 4th International Particle Accelerator Conference (IPAC '13) (Internet), p.3833 - 3835, 2014/07
no abstracts in English