Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Rail DRAGON: Long-reach Bendable Modularized Rail Structure for Constant Observation inside PCV

Yokomura, Ryota*; Goto, Masataka*; Yoshida, Takehito*; Warisawa, Shinichi*; Hanari, Toshihide; Kawabata, Kuniaki; Fukui, Rui*

IEEE Robotics and Automation Letters (Internet), 9(4), p.3275 - 3282, 2024/04

 Times Cited Count:0

To reduce errors in the remote control of robots during decommissioning, we developed a Rail DRAGON, which enables continuous observation of the work environment. The Rail DRAGON is constructed by assembling and pushing a long rail structure inside the primary containment vessel (PCV), and then repeatedly deploying several monitoring robots on the rails to enable constant observation in a high-radiation environment. In particular, we have developed the following components of Rail DRAGON: bendable rail modules, straight rail modules, a basement unit, and monitoring robots. Concretely, this research proposes and demonstrates a method to realize an ultralong articulated structure with high portability and workability. In addition, it proposes and verifies the feasibility of a method for deploying observation equipment that can be easily deployed and replaced, while considering disposal.

1 (Records 1-1 displayed on this page)
  • 1