Refine your search:     
Report No.
 - 
Search Results: Records 1-10 displayed on this page of 10
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Improvements in plastic enclosure system for glovebox decommissioning

Watahiki, Masatoshi; Akai, Masanori; Nakai, Koji; Iemura, Keisuke; Yoshino, Masanori*; Hirano, Hiroshi*; Kitamura, Akihiro; Suzuki, Kazunori

Nihon Genshiryoku Gakkai Wabun Rombunshi, 11(1), p.101 - 109, 2012/02

Gloveboxes used for plutonium fuel development and fabrication are eventually dismantled for replacement or decommissioning. Since equipment interior and the inner surface of gloveboxes are contaminated in radioactive materials, glovebox dismantling work is performed by workers wearing an air fed suit with mechanical tools in a plastic enclosure system to control the spread of contamination. Various improvements of enclosure system are implemented including modification of the rooms to decontaminate and undress the air fed suit and introduction of inflammable filter and safety film near the size reduction workspace against fire. We describe the countermeasures deployed in the enclosure system against potential hazards and how these devices work in the real dismantling activities.

Journal Articles

Alignment of cavities and magnets at J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Asano, Hiroyuki; Ito, Takashi; Ueno, Akira; Okawa, Tomohiro; Hasegawa, Kazuo; Ikegami, Masanori*; Naito, Fujio*; Tanaka, Hirokazu*; et al.

Proceedings of 10th International Workshop on Accelerator Alignment (IWAA 2008) (Internet), 6 Pages, 2008/02

It has been widely accepted that an accurate alignment is essential to achieve high beam quality and highly stable operation increasingly demanded in recent particle accelerators. The J-PARC linac components are finely aligned based on the precise survey network, where we have emphasized on attaining the smoothness between adjacent elements. A floor elevation of the accelerator tunnel has been periodically measured since the completion of the linac building to correct the error by the settlement. The alignment of the linac components have been finished at Sep. 2006 and the beam commissioning has been started at Nov. 2006. After a coarse adjustment of the RF phase and amplitude, nearly complete beam transmission was easily established without using steering magnet. This successful beam transport proves the validity of the alignment strategy and the accurateness of the alignment procedure.

Journal Articles

Waste handling activities in glovebox dismantling facility

Kitamura, Akihiro; Okada, Takashi; Kashiro, Kashio; Yoshino, Masanori*; Hirano, Hiroshi*

Proceedings of International Conference on Advanced Nuclear Fuel Cycles and Systems (Global 2007) (CD-ROM), p.531 - 536, 2007/09

We present our waste handling activities in glovebox dismantling facility, installed in Plutonium Fuel Production Facility, Nuclear Fuel Cycle Engineering Laboratories, JAEA. In this facility, we treat only one size gloveboxes (3m$$times$$3m$$times$$1m), but for the future waste treatment, we segregate waste into material categories. We analyzed the data collected for the future decommissioning, waste treatment and waste disposal. We also present the improvements which are already made and will be made in the near future.

Journal Articles

The DTL/SDTL alignment of the J-PARC linac

Morishita, Takatoshi; Asano, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Naito, Fujio*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Yoshino, Kazuo*; Ikegami, Masanori*

Proceedings of 2007 Particle Accelerator Conference (PAC '07) (Internet), p.1523 - 1525, 2007/06

J-PARC linear accelerator components have been installed. The required alignment accuracy in the J-PARC linac is 0.1mm in transverse direction. In the DTL/SDTL section, the fine alignment was carried out by using an optical alignment telescope along with the cavity installation. The displacement of the DTL by the unit tank connection was monitored by a laser tracker to obtain the tolerable displacement between unit tanks. The heights of cavities and magnets were compensated form the unequal ground movement of the linac tunnel. Finally, all the cavities and magnets are aligned within the tolerable alignment error.

Journal Articles

DTL/SDTL installation and alignment of J-PARC LINAC

Morishita, Takatoshi; Asano, Hiroyuki; Ito, Takashi; Ikegami, Masanori*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; Yoshino, Kazuo*

Proceedings of 3rd Annual Meeting of Particle Accelerator Society of Japan and 31st Linear Accelerator Meeting in Japan (CD-ROM), p.376 - 378, 2006/00

In the J-PARC Linac, the DTL and the SDTL have been installed. A precise alignment of accelerator components is essential for high quality beam acceleration. Due to the heavy wiring for DTQs, the realignment of DTL cavity requires a long term. Then the DTL/SDTL and the focusing magnets are aligned precisely enough for the beam operation at the installation. The DTL/SDTL alignment accuracy satisfied the requirement, which confirmed by the laser tracker measurement. The floor level of the accelerator tunnel has been measured periodically. The long term motion of accelerator tunnel is quantitatively evaluated since Feb. 2005.

Journal Articles

An Alignment of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; et al.

Proceedings of 2nd Annual Meeting of Particle Accelerator Society of Japan and 30th Linear Accelerator Meeting in Japan, p.266 - 268, 2005/07

J-PARC linear accelerator components are now being installed in the accelerator tunnel. Markings are placed on the floor, which act as a reference for the initial alignment at the installation. A planned and ongoing alignment schemes for the installation of linac components and watching the long term motion of the building are described.

Journal Articles

An Alignment of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Naito, Fujio*; Takasaki, Eiichi*; Tanaka, Hirokazu*; et al.

Proceedings of 2005 Particle Accelerator Conference (PAC '05) (CD-ROM), p.2851 - 2853, 2005/00

In J-PARC linac, a precise alignment of accelerator components is essential for high quality beam acceleration. Markings have been placed on the floor, which act as a reference for the initial alignment at the installation. For a straight line alignment, the wire position sensor is placed on the offset position with respect to the beam center by a target holder. The hydrostatic levering system is used for watching the floor elevation over the long period.

Journal Articles

An Alignment system of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.671 - 673, 2004/08

A precise alignment of accelerator components is essential for the J-PARC linear accelerator. The wire position sensor is applied to measure the accelerator component positioning and the ground motion of the building is measured by the hydrostatic leveling sensors. In this paper, the scheme of the alignment system is presented.

Journal Articles

Beam commissioning of the J-PARC linac DTL1 at KEK

Kondo, Yasuhiro; Akikawa, Hisashi; Anami, Shozo*; Asano, Hiroyuki*; Fukui, Yuji*; Igarashi, Zenei*; Ikegami, Kiyoshi*; Ikegami, Masanori*; Ito, Takashi; Kawamura, Masato*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.156 - 158, 2004/08

A commissioning of the J-PARC linac DTL1 is now under way at KEK. A 30mA H$$^{-}$$ beam was accelerated to 19.7-MeV, and 100% transmission was obtained with a 20-msec-pulse-width and 12.5-Hz-repetition beam. In this paper, present status of the DTL1 commissioning and preliminary results of the commissioning, such as emittance measurements, are presented.

Oral presentation

Development of the plutonium recovery technique from MOX powder

Tanigawa, Masafumi; Kato, Yoshiyuki; Isomae, Hidemi; Komatsuzaki, Mai*; Yoshino, Masanori*

no journal, , 

no abstracts in English

10 (Records 1-10 displayed on this page)
  • 1