Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

High-power test of annular-ring coupled structures for the J-PARC linac energy upgrade

Tamura, Jun; Ao, Hiroyuki; Nemoto, Yasuo; Asano, Hiroyuki*; Suzuki, Takahiro*

Journal of the Korean Physical Society, 66(3), p.399 - 404, 2015/02

 Times Cited Count:0 Percentile:0.00(Physics, Multidisciplinary)

ACSs are going to increase the beam energy of the J-PARC linac from 181 to 400 MeV. The 2011 Tohoku earthquake damaged the J-PARC facilities and the cavity conditioning was interrupted for two years. After the restoration of the facility, the two ACS cavities (M01 and M11) were conditioned. They achieved to 15-20% above the designed accelerating field of 4.2 MV/m. Since M01 was conditioned six years ago, the conditioning time required for M01 was drastically reduced from that for the first time. During the high-power operation for M11, which is an unique cavity equipped with a capacitive iris in a waveguide, no significant increase of the temperature and the discharge rate around the capacitive iris was observed. The vacuum pressure was sufficiently low (4$$times$$10$$^{-6}$$ Pa) even from the view point of beam loss due to residual gas scattering. The more stable operation can be expected through one-month conditioning before beam commissioning.

Journal Articles

Design and delivery of beam monitors for the energy-upgraded linac in J-PARC

Miura, Akihiko; Ouchi, Nobuo; Oguri, Hidetomo; Hasegawa, Kazuo; Miyao, Tomoaki*; Ikegami, Masanori*

Journal of the Korean Physical Society, 66(3), p.364 - 372, 2015/02

 Times Cited Count:3 Percentile:27.38(Physics, Multidisciplinary)

In J-PARC Linac, an energy upgrade project has started to achieve the design beam power of 1 MW at the exit of downstream synchrotron. To meet with significant upgrades of the beam parameters, beam monitors used for the beam commissioning are modified and fabricated. We discuss how to design and assemble the beam monitors for the upgraded Linac. We delivered them for the new upgraded beam line periodically and newly fabricated monitors for the longitudinal matching are also delivered because of the frequency jump between original RF cavity and newly developed cavity. Finally we suppose the commissioning plans to support the monitor check.

2 (Records 1-2 displayed on this page)
  • 1