Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

J-PARC transmutation experimental facility programme

Sasa, Toshinobu; Takei, Hayanori; Saito, Shigeru; Obayashi, Hironari; Nishihara, Kenji; Sugawara, Takanori; Iwamoto, Hiroki; Yamaguchi, Kazushi; Tsujimoto, Kazufumi; Oigawa, Hiroyuki

NEA/CSNI/R(2015)2 (Internet), p.85 - 91, 2015/06

Nuclear transmutation got much interested as an effective option of nuclear waste management. Japan Atomic Energy Agency (JAEA) proposes the transmutation of minor actinides (MA) by accelerator-driven system (ADS) using lead-bismuth alloy (Pb-Bi). To obtain the data for ADS design, JAEA plans to build a Transmutation Experimental Facility (TEF) in the J-PARC project. TEF consists of two buildings, an ADS target test facility (TEF-T) with 400MeV-250kW Pb-Bi target, and a Transmutation Physics Experimental Facility (TEF-P), which set up a fast critical assembly driven by low power proton beam with MA fuel. In TEF-T, irradiation test for materials, and engineering tests for Pb-Bi target operation will be performed. Various research plans such as nuclear data measurements have been proposed and layout of the experimental hall are underway. In the presentation, roadmap to establish the ADS transmutor and latest design activities for TEF construction will be summarized.

1 (Records 1-1 displayed on this page)
  • 1