Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 29

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Renewal of control system of the J-PARC RCS magnet power supply

Watanabe, Yasuhiro; Yanagibashi, Takanori; Komatsuzaki, Makoto*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1024 - 1028, 2023/10

J-PARC RCS accelerates a high-intensity proton beam from 400 MeV to 3 GeV at a repetition rate of 25 Hz. The main magnet system of the RCS is composed of a family of dipole magnets and seven families of quadrupole magnets excited by eight independent resonant circuits. The current control system of the main magnet power supply requires high-precision tracking control between different magnet families. The original control system of the main magnet power supply had been operated without major problems for fifteen years since the start of operation of the RCS, while the control system component is obsolete. We developed a new power supply controller based on SoC FPGA. The controller consists of a main board and four daughter boards and all functions required for current control of the power supply are installed in a 19-inch rack 2U control unit.

Journal Articles

Countermeasures against noise of inverter-controlled multi-stage root pumps in J-PARC LINAC beam dump

Kobayashi, Fuminori; Kamiya, Junichiro; Moriya, Katsuhiro; Miyao, Tomoaki*; Kotoku, Hirofumi*; Takano, Kazuhiro*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.726 - 730, 2023/10

The L3BT beamline at J-PARC LINAC has beam dumps connected via vacuum partition windows to separate the ultra-high vacuum beamline from the low vacuum beam dumps. Roots pumps are used to evacuate each beam dump. The roots pump controllers have been installed away from the pump in the accelerator tunnel to avoid radiation damages. The special controllers, which have no inverter circuit inside, have been used to reduce the electrical noise on the beam loss monitors nearby. However, in this case, several problems have occurred such as the instability of the pumping performance. To solve such problems, the roots pump controller with the inverter circuit must be used after reducing the electrical noise. In this report, some countermeasures to reduce the electrical noise from the inverters were investigated. The noise reduction circuit was successfully optimized to the level where the beam loss monitors work unaffected.

Journal Articles

Effects of the longitudinal impedances on non-adiabatic bunch manipulation at flattop of J-PARC MR

Tamura, Fumihiko; Omori, Chihiro*; Yoshii, Masahito*; Tomizawa, Masahito*; Toyama, Takeshi*; Sugiyama, Yasuyuki*; Hasegawa, Katsushi*; Kobayashi, Aine*; Okita, Hidefumi

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.175 - 178, 2023/01

J-PARC MR delivers high intensity proton beams to the neutrino experiment. Eight bunches with high peak currents are extracted from the MR by the extraction kicker, therefore the neutrino beam has the similar structure. Intermediate Water Cherenkov Detector (IWCD) will be installed for the future experiments and the IWCD requires a time structure with low peaks. We consider bunch manipulation at flattop of the MR for reducing the peak current. It should be quickly done to avoid the significant loss of the beam power. The beam gap for the kicker rise time must be kept. We propose a non-adiabatic bunch manipulation using the multiharmonic rf voltage. The longitudinal impedance in the MR can affect the beam stability. The feasibility of the manipulation is discussed by using the longitudinal simulations.

Journal Articles

Two-dimensional resistive-wall impedance with finite thickness; Its mathematical structures and their physical meanings

Shobuda, Yoshihiro

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.28 - 32, 2023/01

Two-dimensional resistive-wall impedance of cylindrical chambers with a finite thickness decreases proportionally to the frequency when the skin depth is greater than the chamber thickness. The phenomenon is typically interpreted that the electro-magnetic fields leak out of the chamber over the frequency range. However, the relation among the resistive-wall impedance, the space charge impedance, and the leakage fields from the chamber is not clear. This study provides a more comprehensive picture of dealing with them simultaneously.

Journal Articles

Evaluation of higher harmonics generated in acceleration gaps during the high power beam acceleration at J-PARC RCS

Okita, Hidefumi; Tamura, Fumihiko; Yamamoto, Masanobu; Nomura, Masahiro; Shimada, Taihei; Yoshii, Masahito*; Omori, Chihiro*; Hara, Keigo*; Hasegawa, Katsushi*; Sugiyama, Yasuyuki*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.262 - 266, 2023/01

no abstracts in English

Journal Articles

Evaluation of RF antenna lifetime after long-term operation of J-PARC ion source

Shibata, Takanori*; Ishida, Masaki*; Nammo, Kesao*; Ikegami, Kiyoshi*; Okoshi, Kiyonori; Shinto, Katsuhiro; Oguri, Hidetomo

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.863 - 867, 2023/01

Continuous operation duration of the J-PARC Radio Frequency (RF) ion source has been extended step by step these years for the goal to supply stable beam during the entire period of J-PARC user operation (around 7 months) each year. A 3651 hours (5 months) continuous ion source operation has been achieved from Nov. 2020 to Apr. 2021. As the lifetime of the ion source is mainly limited by failure on the RF antenna coil, detailed evaluation of the antenna surface condition is required to ensure the feasibility of the further extension of the operation time. In the present study, dimension measurements and SEM/EDS analyses were applied to understand the surface discoloration of the RF antenna. The discoloration after the long-term continuous operation is due to deposition of injected cesium (for H$$^-$$ surface production process) and of stainless used steel (Fe, Cr, Ni) from the ion source components sputtered by plasma. The results show that the enamel coating of the RF antenna has not worn out in the long-term continuous operation for several months and, hence, extension of the ion source continuous operation duration can be extended.

Journal Articles

Image recognition technology is used to obtain momentum distribution and longitudinal beam shape from mountain plot image

Nomura, Masahiro; Okita, Hidefumi; Shimada, Taihei; Tamura, Fumihiko; Yamamoto, Masanobu; Sugiyama, Yasuyuki*; Hasegawa, Katsushi*; Hara, Keigo*; Omori, Chihiro*; Yoshii, Masahito*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.215 - 217, 2023/01

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Kabumoto, Hiroshi; Matsuda, Makoto; Nakamura, Masahiko; Ishizaki, Nobuhiro; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Nakagawa, Sohei; Abe, Shinichi

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1109 - 1113, 2023/01

no abstracts in English

Journal Articles

Reports of electro-polishing implementation for quarter-wave resonators, 2

Nii, Keisuke*; Ida, Yoshiaki*; Ueda, Hideki*; Yamaguchi, Takanori*; Kabumoto, Hiroshi; Kamiya, Junichiro; Kondo, Yasuhiro; Tamura, Jun; Harada, Hiroyuki; Matsui, Yutaka; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.601 - 604, 2023/01

no abstracts in English

Journal Articles

Evaluation for updating the intra-bunch feedback at J-PARC main ring

Yoshimura, Nobuyuki*; Toyama, Takeshi*; Kobayashi, Aine*; Nakamura, Takeshi*; Okada, Masashi*; Shobuda, Yoshihiro; Nakaya, Tsuyoshi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.936 - 941, 2023/01

no abstracts in English

Journal Articles

Recent usage status of charge-exchange stripper foil for 3GeV synchrotron of J-PARC

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.629 - 633, 2023/01

In the J-PARC 3-GeV Rapid Cycling Synchrotron (RCS), a 400 MeV H$$^{-}$$ beam injected from the linac is exchange to an H$$^{+}$$ beam by a charge exchange foil and accelerated to 3 GeV. The charge exchange foils mainly used in the RCS are HBC foil (Hybrid Boron mixed Carbon stripper foil), which are made by adding a small amount of boron to carbon rods and using them as electrodes by the arc deposition method. Since 2018, foils produced by JAEA have been used for user operation. So far, no major problems have occurred due to the foils. Meanwhile, the beam power of the RCS has been gradually increased from 500 kW to 830 kW since 2018. As beam power increases, the foil issues were identified to achieve the RCS design power of 1 MW. In this paper, we will report on the recent foil usage status and issue in the user operation.

Journal Articles

Development of semiconductor switches for high-power crowbar circuits

Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.395 - 399, 2023/01

At J-PARC, an ignitron is used for the crowbar device of the klystron power supply for high-frequency acceleration of a linear accelerator. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3 kV, 40 kA, and 50 $$mu$$s per board. For the control power supply to each board module assuming a high voltage of 120 kV, we adopted a self-power supply method that creates a control power supply with a high-voltage DCDC converter from the voltage shared and charged by each board module. It was possible to confirm the operating performance on a 1/2 scale (60 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting twenty oval board modules in series. The output test result will be reported.

Journal Articles

Studies of beam diagnostics with bunch-shape monitor for high-power and low-beta H$$^{-}$$ beam

Kitamura, Ryo; Hayashi, Naoki; Hirano, Koichiro; Kosaka, Satoshi*; Miyao, Tomoaki*; Nemoto, Yasuo*; Morishita, Takatoshi

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.330 - 332, 2023/01

In the J-PARC linac, a new bunch-shape monitor (BSM) is developed to stably measure the high-intensity and low-energy H$$^{-}$$ beam by improving the strength of the target probe for the heat loading. The new target probe is made of the graphite. The first measurement of the longitudinal beam profile has been realized with the BSM at the core region of the high-intensity beam. Since the beam profile can be measured with the new BSM at any transverse position thanks to the new target probe, we propose the advanced application of the beam diagnostics with the BSM. In this presentation, some new approaches of the beam diagnostics with the BSM; the transverse profile measurement using the secondary electrons and the beam current evaluation from the transverse profile measurement, are discussed beyond the original usage of the BSM.

Journal Articles

Longitudinal measurement of high-intensity beam with bunch-shape monitor in front-end

Kitamura, Ryo; Hayashi, Naoki; Hirano, Koichiro; Miyao, Tomoaki*; Miura, Akihiko; Morishita, Takatoshi

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.212 - 214, 2023/01

In the J-PARC linac, the bunch-shape monitor (BSM) is developed to precisely and rapidly measure the longitudinal beam profile at the front-end, towards the improvement of the beam matching. The graphite target having the good strength to the high-power beam, has been introduced in order to resist the heat loading of the high-intensity beam. The resolution and other uncertainties were evaluated for the BSM. The longitudinal Twiss parameters and emittance were measured using the BSM and the IMPACT, which was the 3D particle-in-cell simulation code. The precision of the longitudinal emittance measurement was improved, by implementing uncertainties related to the BSM into the calculation. In this presentation, we will report a series of the measurement result, the method of the beam diagnostics with the BSM at the front-end, and the comparison between the measurement and the beam simulation.

Journal Articles

Design and beam dynamics studies of an ADS RFQ based on an equipartitioned beam scheme

Yee-Rendon, B.; Kondo, Yasuhiro; Tamura, Jun; Nakano, Keita; Maekawa, Fujio; Meigo, Shinichiro; Jameson, R. A.*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.499 - 502, 2023/01

The Japan Atomic Energy Agency (JAEA) is designing a 30-MW proton linear accelerator (linac) for the accelerator-driven subcritical system (ADS). The Radio Frequency Quadrupole (RFQ) is an essential component for the performance of high-intensity linac, especially in ADS, where stringent reliability is demanded. The present RFQ will capture a 20 mA proton beam and accelerate from the energy of 35 keV to 2.5 MeV, where the space-charge effects are severe. The present RFQ's design employs the equipartitioning (EP) beam scheme to control the emittance growth and compactness. As a result, the beam halo formation was minimized and allowed to optimize the superconducting linac downstream part. A remarkable feature of this RFQ is the low Kilpatrick factor of 1.2 adopted to achieve high stability by reducing the probability of surface sparking on the vane. This work presents and discusses the results of this RFQ design.

Journal Articles

Robust and compact design of a 30-MW beam transport line for an accelerator-driven subcritical system

Yee-Rendon, B.; Kondo, Yasuhiro; Tamura, Jun; Nakano, Keita; Maekawa, Fujio; Meigo, Shinichiro

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.179 - 183, 2023/01

The Japan Atomic Energy Agency accelerator-driven subcritical system (JAEA-ADS) pursues the reduction of nuclear waste by transmuting minor actinides. JAEA-ADS project drives a 30-MW proton beam to a lead-bismuth eutectic (LBE) spallation target to produce neutrons for a subcritical core reactor. To this end, the JAEA-ADS beam transport (BT) must provide a suitable beam profile and stable beam power to the beam window of the spallation target to avoid high-thermal stress in the components, such as the beam window. The beam transport was optimized by tracking a large number of macroparticles to mitigate the beam loss, performance with high stability in the presence of errors, and fulfill the length requirement on the transport. This work presents beam transport design and beam dynamics research for the JAEA-ADS project.

Journal Articles

Availability analysis for the 30-MW proton linac of the JAEA-ADS project

Yee-Rendon, B.; Kondo, Yasuhiro; Tamura, Jun; Nakano, Keita; Maekawa, Fujio; Meigo, Shinichiro

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.286 - 290, 2023/01

Japan Atomic Energy Agency (JAEA) is designing a 30-MW proton linear accelerator (linac) as one of the fundamental components for its accelerator-driven subcritical system (ADS) project. ADS accelerators demand extremely high reliability and availability to avoid thermal stress in the subcritical reactor structures. Thus, reliability and availability assessments of the accelerator are mandatory to detect weakness in the lattice designed and evaluate redundancy configurations to fulfill the demanded operation. This study applied the Reliability Block Diagrams (RBD) method to calculate the Medium Time Between Failures (MTBF) for different linac configurations: all the linac's elements in a series configuration and a combination of hot-standby for the low-energy section of the linac and k-out-n redundancy for the high-energy part. The estimation considered the detailed arrangement of the cavities and magnets that compose the linac lattice. In this report, we describe the reliability model of the JAEA-ADS linac, report the MTBF results, and point out the potential route toward operating with the required availability.

Journal Articles

Outgassing characteristics from the J-PARC-made internal antenna for a high-intensity radio-frequency H$$^-$$ ion source

Shinto, Katsuhiro; Shibata, Takanori*; Okoshi, Kiyonori; Nammo, Kesao*; Ikegami, Kiyoshi*; Oguri, Hidetomo

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.675 - 679, 2023/01

In J-PARC, we have been conducting the test of a J-PARC-made internal antenna in order to establish the production method and understand the beam characteristics of the antenna. At this time, we investigated the outgas characteristics during the production of a high-density plasma by using the J-PARC-made antenna. It is confirmed that no remarkable impurities are emitted from the antenna by a residual gas analysis using a quadrupole mass analyzer installed downstream the ion source and a spectroscopic analysis of the plasma in the ion source. It is found that the emittances of the H$$^-$$ beam extracted from the J-PARC radio-frequency H$$^-$$ ion source by using the antenna was similar as those in case by using SNS antenna.

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron, 2

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.

Journal Articles

Progress of evaluation of beam coupling impedance reduction for the Eddy-current type septum magnet in J-PARC MR

Kobayashi, Aine*; Toyama, Takeshi*; Nakamura, Takeshi*; Shobuda, Yoshihiro; Ishii, Koji*; Tomizawa, Masahito*; Takeuchi, Yasunao*; Sato, Yoichi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.19 - 23, 2023/01

In the J-PARC main ring, density modulation due to longitudinal beam instability occurs during the debunching process of coasting beams. This leads to the generation of an electron cloud, which in turn causes transverse beam instabilities. The transverse beam instability causes beam loss and the electron cloud is assumed to cause vacuum degradation, both of which hinder the beam intensity enhancement, so it is essential to clarify the causes and countermeasures. In particular, the longitudinal impedance of several hundred MHz has been investigated as relevant, and measures to reduce the impedance of individual devices are underway. The Eddy-current type septum magnet, newly installed this year, was found to have a large impedance by simulation. Therefore, we are investigating a method to reduce the impedance by a flange loaded with SiC radio wave absorber, which can be applied to locations where there is no spatial margin to install a taper. In this report, we will discuss the characterization of SiC to be used in actual devices, impedance simulation reflecting the results of SiC evaluation, and evaluation of the effect of impedance countermeasures by impedance measurement using the wire method, and progress in evaluating the effect on the beam by beam simulation and beam study.

29 (Records 1-20 displayed on this page)