Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nagai, Ryoji; Hajima, Ryoichi; Sawamura, Masaru; Kikuzawa, Nobuhiro; Nishimori, Nobuyuki; Nishitani, Tomohiro; Minehara, Eisuke
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.420 - 422, 2004/08
no abstracts in English
Nagai, Ryoji; Hajima, Ryoichi; Sawamura, Masaru; Kikuzawa, Nobuhiro; Nishimori, Nobuyuki; Nishitani, Tomohiro; Minehara, Eisuke
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.656 - 658, 2004/08
no abstracts in English
Nagai, Ryoji; Sawamura, Masaru; Hajima, Ryoichi; Kikuzawa, Nobuhiro; Nishimori, Nobuyuki; Nishitani, Tomohiro; Minehara, Eisuke
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.293 - 295, 2004/08
no abstracts in English
Tamura, Fumihiko; Yoshikawa, Hiroshi; Yoshii, Masahito*; Chiba, Junsei*; Kato, Tadahiko*; Takagi, Akira*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.677 - 679, 2004/08
We describe the overvier of the J-PARC timing system. J-PARC accelerators consists of the linac, the RCS and the MR, which have different repetition rates. The beam destinations of the linac and RCS are different in each pulse. We present the precise timing system which governs the accelerator timing.
Sawamura, Masaru; Nagai, Ryoji; Kikuzawa, Nobuhiro; Nishimori, Nobuyuki; Hajima, Ryoichi; Minehara, Eisuke
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.305 - 307, 2004/08
no abstracts in English
Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.671 - 673, 2004/08
A precise alignment of accelerator components is essential for the J-PARC linear accelerator. The wire position sensor is applied to measure the accelerator component positioning and the ground motion of the building is measured by the hydrostatic leveling sensors. In this paper, the scheme of the alignment system is presented.
Kawase, Masato*; Yoshikawa, Hiroshi; Sakaki, Hironao; Takahashi, Hiroki; Sako, Hiroyuki; Kamiya, Junichiro; Takayanagi, Tomohiro; Hongo, Reiji*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.537 - 539, 2004/08
When an interlock occurs in the equipment, it is required to notify the upper rank control system of the Interlock and receive information for apparatus information in the upper rank control system as at high speed as possible. In the apparatus using FA-M3, it can respond to this by using the notice function of an event. This report shows the event notification system with a PLC based Kicker electromagnet power supply for 3GeVRCS.
Kondo, Yasuhiro; Akikawa, Hisashi; Anami, Shozo*; Asano, Hiroyuki*; Fukui, Yuji*; Igarashi, Zenei*; Ikegami, Kiyoshi*; Ikegami, Masanori*; Ito, Takashi; Kawamura, Masato*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.156 - 158, 2004/08
A commissioning of the J-PARC linac DTL1 is now under way at KEK. A 30mA H
beam was accelerated to 19.7-MeV, and 100% transmission was obtained with a 20-msec-pulse-width and 12.5-Hz-repetition beam. In this paper, present status of the DTL1 commissioning and preliminary results of the commissioning, such as emittance measurements, are presented.
Kikuzawa, Nobuhiro
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.504 - 506, 2004/08
no abstracts in English
Nishimori, Nobuyuki
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.174 - 176, 2004/08
no abstracts in English
Yoshida, Kenichi; Nara, Takayuki; Saito, Yuichi; Yokota, Wataru
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.392 - 393, 2004/08
no abstracts in English
Ao, Hiroyuki; Ueno, Akira; Morishita, Takatoshi; Hasegawa, Kazuo; Yamazaki, Yoshishige; Ikegami, Masanori*; Hayashizaki, Noriyosu*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.323 - 325, 2004/08
no abstracts in English
Uesaka, Mitsuru*; Iijima, Hokuto; Ueda, Toru*; Muroya, Yusa*; Sakumi, Akira*; Kumagai, Noritaka*; Tomizawa, Hiromitsu*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.628 - 630, 2004/08
no abstracts in English
Sato, Susumu; Tomisawa, Tetsuo; Hiroki, Fumio; Lee, S.*; Igarashi, Zenei*; Ikegami, Masanori*; Ueno, Akira; Kondo, Yasuhiro; Hasegawa, Kazuo; Toyama, Takeshi*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.467 - 469, 2004/08
As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction. For this accelerator, it is required to minimize the beam loss (typically, lower than0.1
1 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100
m. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 stripline pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.
Ito, Takashi; Asano, Hiroyuki*; Morishita, Takatoshi; Kato, Takao*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.344 - 346, 2004/08
no abstracts in English
Hori, Toshihiko*; Chishiro, Etsuji; Yamazaki, Masayoshi*; Suzuki, Hiroyuki*; Hasegawa, Kazuo
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.212 - 214, 2004/08
no abstracts in English
Kobayashi, Tetsuya; Chishiro, Etsuji; Anami, Shozo*; Yamaguchi, Seiya*; Michizono, Shinichiro*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.320 - 322, 2004/08
J-PARC (Japan Proton Accelerator Complex) linac, which is 300 m long, consists of 324 MHz accelerating section of the upstream and 972 MHz section (as future plan) of the downstream. In the klystron gallery, totally about 60 RF source control stations will stand for the klystrons and solid-state amplifiers. The error of the accelerating field must be within
1 degree in phase and
1% in amplitude. Thus, the high phase stability is required to the RF reference for all of the low-level RF control systems and the beam monitor systems. This paper presents a final design and the summary of the performance evaluation of the RF reference distribution system including the timing control signal distribution for this linac.
Kobayashi, Tetsuya; Suzuki, Hiroyuki*; Anami, Shozo*; Yamaguchi, Seiya*; Kawamura, Masato*; Fukui, Yuji*; Kadokura, Eiichi*; Kamikubota, Norihiko*; Takagi, Makoto*; Yoshida, Susumu*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.314 - 316, 2004/08
The beam study of the low-energy front of J-PARC linac has been in progress in the KEK site. Last year, DTL1 (the first tank of three DTL's) was installed in addition to RFQ and the Medium Energy Beam Transport line, and the beam commissioning up to 20MeV has been performed successfully. In this paper, the low level RF (LLRF) System for this beam test is summarized and the performance of the RF feed back control system and monitor system of the phase and amplitude of the accelerating fields (324 MHz) is presented. It was found that the feed back system for Bunchers is also necessary to stabilize and to compensate for the beam induced fields.
Sakaki, Hironao; Ito, Yuichi*; Kato, Yuko*; Miyamoto, Koji*; Kawamura, Naoki*; Nakamura, Takeshi*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.549 - 551, 2004/08
We developed the pulse wave form recorder with the flight recorder function, last year. The recorders are scheduled to be used for the beam status monitor system in J-PARC. If the pulse number between each recorder in the system has not synchronized, each waveform data can't match in the analysis software. As a result, we'll lose the time for the analysis. In this report, the design of the device that conform to all pulse number of each recorder is described.
Suganuma, Kazuaki; Anami, Shozo*; Chishiro, Etsuji; Kubota, Chikashi*; Shinohara, Kibatsu*; Tsuruoka, Shigetsugu*; Yamaguchi, Seiya*
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.275 - 277, 2004/08
A 972MHz circlator is currently developed. In the high-power test of the prototype,rf breakdown was observed at the matching post. Rf characterristics obtained by simulations and low-power tests will be presented.