Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Rossi, F.; Lee, J.; Kodama, Yu; Hironaka, Kota; Koizumi, Mitsuo; Hori, Junichi*; Terada, Kazushi*; Sano, Tadafumi*
Proceedings of 65th Annual Meeting of the Institute of Nuclear Materials Management (Internet), 8 Pages, 2024/07
Rodriguez, D. C.; Akamatsu, Shunsuke*; Rossi, F.; Suzuki, Satoshi*; Takahashi, Tone
Proceedings of 65th Annual Meeting of the Institute of Nuclear Materials Management (Internet), 9 Pages, 2024/07
Kato, Akane; Shirafuji, Masaya; Suekane, Yurika; Shimizu, Yasuyuki; Kitao, Takahiko
Proceedings of 65th Annual Meeting of the Institute of Nuclear Materials Management (Internet), 9 Pages, 2024/07
Tokai Reprocessing Plant (TRP) started to recover those remaining nuclear materials from main process in reprocessing facility (Flush-out) as a first step of decommissioning. Flush-out plan is conducted by three steps for recovering sheared powder (Stage A), Pu (Stage B) and U (Stage C). Stage A for recovering sheared powder was implemented from June to September 2022. As the next step of Flush-out plan, Stage B and Stage C, were implemented from March 2023 in stepwise. Stage B is to transfer Pu solution from storage material balance area (MBA) to HALW storage as retained waste, and stage C is to fabricate Uranium trioxide powder from U solution. Since these activities for flush-out are different from conventional reprocessing operation, TRP should overcome the subject for the establishment of appropriate material control and accountancy (MC&A) method and new safeguards measures implemented by IAEA. In this paper, we report about Pu and U recovery process and relevant MC&A and safeguards measures in the Flush-out.
Kyffin, J.*; Dia, A.*; Nkosi, G.*; Nizhnik, V.*; Hayashi, Akihiko; Nagatani, Taketeru
Proceedings of 65th Annual Meeting of the Institute of Nuclear Materials Management (Internet), 8 Pages, 2024/07