Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kashiwagi, Mieko; Umeda, Naotaka; Kojima, Atsushi; Yoshida, Masafumi; Tobari, Hiroyuki; Dairaku, Masayuki; Yamanaka, Haruhiko; Maejima, Tetsuya; Yamashita, Yasuo*; Shibata, Naoki; et al.
Fusion Engineering and Design, 96-97, p.107 - 112, 2015/10
JAEA proceeds the R&Ds of high voltage components, such as 1MeV accelerator and high voltage power supply for the ITER neutral beam injector for heating (ITER HNB). In the 1MeV accelerator R&D, the target is to produce 1MeV beams during several tens of seconds using a five-stage multi-aperture accelerator. In the extraction grid, cooling capability is enhanced to accept electrons during long period and aperture offset is applied to correct the beam deflection due to magnetic fields in the accelerator. As the result, the heat load on the acceleration grids was reduced from 23% to 13%. The beam energy was increased from 0.9MeV to 1MeV at short pulse of 0.4s. The beam pulse was increased by a factor of one hundred, 60s, at 0.7MeV up to now. In the R&D of the power supply, a 1MV bushing of 1MV insulating transformer has been newly developed and a stable operation at 1.2MV with the margin of 20% was achieved for 3600s. Thus, the R&Ds for the ITER HNB is progressed as scheduled.
Takeuchi, Suehiro
AIP Conference Proceedings 680, p.229 - 236, 2003/00
JAERI and KEK-Institute of Particle and Nuclear Studies are collabarating to build an ISOL-type radioactive ion beam(RIB) acceleration system in the JAERI-Tokai tandem accelerator lab. In this project, the tandem accelerator is used as a proton beam driver to create RIB from fission products of a uranium target and a RIB accelerator already built by KEK will be installed in an old target room of the tandem accelerator lab. The beam energy is 1.1 MeV/nucleon, which is not sufficient for experiments related to nuclear reactions. They have a plan to boost the beams to 5 - 9 MeV/u by developing a pre-booster and using existing super-conducting tandem-booster. The plan of this project, acceleration divices and present status will be outlined in the RIB session of the CAARI.