Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Taniguchi, Naoki; Nakayama, Masashi
Zairyo To Kankyo, 67(12), p.487 - 494, 2018/12
This article describes the current status of corrosion monitoring methods and examples of the measurement under deep underground environments for carbon steel overpacks for high-level radioactive waste disposal. Based on the studies on corrosion monitoring using AC Impedance technique, some of the typical measurement systems such as the electrodes arrangement are introduced. In-situ corrosion monitoring in engineering scale test is also being attempted using a deep underground research facility, and the measurement method and results are presented in this article.
Adhi, P. M.*; Okubo, Nariaki; Komatsu, Atsushi; Kondo, Masatoshi*; Takahashi, Minoru*
Energy Procedia, 131, p.420 - 427, 2017/12
Times Cited Count:0 Percentile:0.03The ionic conductivity of solid electrolyte may insufficient, and the sensor output signal will deviate from the theoretical one in low temperature. The performance of oxygen sensor with Ag/air reference electrode (RE) and liquid Bi/BiO
RE was tested in low-temperature LBE at 300
450
C and the charge transfer reactions impedance at the electrode-electrolyte interface was analyzed by electrochemical impedance analysis (EIS). After steady state condition, both of the sensors performed well and can be used at 300
450
C. Bi/Bi/Bi
O
RE has lower impedance than Ag/air RE. Therefore, the response time of the oxygen sensor with Bi/Bi/Bi
O
RE is faster than the oxygen sensor with Ag/air RE in the low-temperature region.
Sato, Susumu; Igarashi, Zenei*; Lee, S.*; Tomisawa, Tetsuo; Hiroki, Fumio; Kishiro, Junichi; Ikegami, Masanori*; Kondo, Yasuhiro; Hasegawa, Kazuo; Ueno, Akira; et al.
Proceedings of 22nd International Linear Accelerator Conference (LINAC 2004), p.429 - 431, 2004/00
As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction at Tokai, Japan. For this accelerator, it is required to minimize the beam loss (typically, lower than 0.11 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100 micro-meter. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 strip-line pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.
Suzuki, Motoe
JAERI-Research 94-022, 36 Pages, 1994/10
no abstracts in English
Suzuki, Motoe
JAERI-M 87-095, 34 Pages, 1987/07
no abstracts in English