Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Takei, Hayanori
JPS Conference Proceedings (Internet), 45, p.011175_1 - 011175_7, 2026/06
The Japan Atomic Energy Agency is working on the research and development of an accelerator-driven nuclear transmutation system (ADS) for transmuting minor actinides. This system is a combination of a subcritical nuclear reactor and a high-power superconducting proton linear accelerator (JADS-linac). One of the challenges in developing the JADS-linac is to reduce the number of beam trips. Until now, the beam trip frequency of the JADS-linac has been estimated from the operation data of the J-PARC linac, which uses the normal-conducting acceleration (NC) cavities. Recently, data on beam trips in the superconducting acceleration (SRF) cavities of the Spallation Neutron Source of the Oak Ridge National Laboratory (SNS) have been published. These data are important for the estimation of the beam trip frequency of the JADS-linac. Rather, the SNS data are more appropriate than the J-PARC data, because the JADS-linac uses the SRF cavities. On the other hand, the calculation methods in the published data for the NC cavities of J-PARC and the SRF cavities of SNS are different, so it is not possible to simply compare the two. In this study, the mean time between beam trips (MTBT) of the J-PARC NC cavity and the SNS SRF cavity are compared using the same condition. Specifically, the MTBT of the acceleration cavities connected to a single klystron system was calculated and compared. As a result, the MTBT of the SNS SRF cavity was 5.0 and 8.8 times longer than that of the J-PARC NC cavity for
and
h, respectively, where
is the beam trip duration.
Yamaguchi, Yuji; Kondo, Yasuhiro; Meigo, Shinichiro; Oguri, Hidetomo; Oi, Motoki; Saha, P. K.; Shinozaki, Shinichi; Takayanagi, Tomohiro; Yamamoto, Kazami
JPS Conference Proceedings (Internet), 45, p.011162_1 - 011162_7, 2026/06
A high-power 3-GeV proton beam from a rapid cycling synchrotron (RCS) is transported to a neutron production target at Materials and Life Science Experimental Facility (MLF) by a 3-GeV RCS to Neutron facility Beam Transport (3NBT) line in J-PARC. Recently, the design beam power of 1 MW has been achieved. By this achievement, a future plan of MLF second target station (TS2) is motivated for enhancing brightness of the secondary beams and requires a new beam transport line for the 3-GeV proton beam. The design study of the new transport line has been started based on the previous work and is being performed regarding the optics and shielding of the beamline incorporating latest beam commissioning results. In this presentation, we report a brief concept of the new transport line and current status of the design study.
Materials Sciences Research Center
JAEA-Review 2025-058, 175 Pages, 2026/03
Fifteen neutron beam experimental instruments managed by JAEA are installed in JRR-3 (Japan Research Reactor No.3) and are available for internal use including upgrading of instruments and for external users to produce various research results. This report summarizes the progress of internal application research and technical development such as upgrading of neutron beam instruments in the fiscal years 2023 and 2024 after the restart of operation.
-ray beam measurementsOmer, M.; Shizuma, Toshiyuki*; Koizumi, Mitsuo; Taira, Yoshitaka*; Zen, H.*; Ogaki, Hideaki*; Hajima, Ryoichi*
Radiation Physics and Chemistry, 240, p.113467_1 - 113467_8, 2026/03
Times Cited Count:1 Percentile:41.98(Chemistry, Physical)Yoneyama, Kai; Nitta, Ayako; Tanaka, Yasuyuki; Kodaka, Noriyasu; Kikuchi, Riku; Sakano, Takuma; Furuse, Takahiro; Sato, Soichi; Sambongi, Mitsuru; Tanaka, Kosuke
JAEA-Technology 2025-008, 44 Pages, 2025/12
At the TEPCO's Fukushima Daiichi Nuclear Power Station (1F), an investigation inside the reactors has been carried out. In order to safely carry out the decommissioning work such as fuel debris retrieval and building demolition, it is important to estimate the contamination in primary containment vessel for control the decommissioning planning and the worker radiation exposure levels. Therefore, the analysis of the deposit inside the penetration for the 1F Unit 2 primary containment vessel ("X-6 penetration") was performed to clarify the components and activity. The smears from the deposit were used for the analysis. Non-destructive analysis such as gamma-ray spectrometry, X-ray Fluorescence (XRF) and Scanning Electron Microscope-Energy dispersive X-ray spectroscopy (SEM-EDX) for the smear-samples were performed to determine the gamma-nuclides and the morphology of elements in the deposit. Furthermore, in order to evaluate the nuclides and nuclide composition of the deposit in detail, the smear-samples were dissolved and the quantitative analysis of gamma-nuclides, Sr-90, alpha-nuclides in the dissolved solution were conducted. The results (non-destructive analysis and quantitative analysis) were compared with the results of samples collected at different locations in the X-6 penetration in 2020. In the gamma-ray spectrometry as non-destructive analysis where the smears were analyzed directly, Co-60, Sb-125, Cs-134, Cs-137, Eu-154, Eu-155 and Am-241 were detected. In XRF results, Fe originating from construction material was detected as a major element and small amount of U and Zr originating from the fuel and fuel cladding were also detected. In SEM-EDX results, O and Fe were found as a major element of the deposit and U particles coexisting with Fe, Si, Cr, Ni and Zr were also found. These results were consistent with the SEM-EDX results of the samples collected in 2020. In radioactivity analysis, quantitative values for gamma-nuclides (Co-60, Sb-125, Cs-134, Cs-137, Eu-154, Eu-155), Sr-90, Pu-238, Pu-239+240, Am-241, Cm-244, U-235 and U-238 were obtained. Using the results, the ratios of radioactivity based on Cs-137 and U-238 were calculated. Both sets of the ratios were compared to the calculated value of the Unit 2 fuel composition from ORIGEN.
Takei, Hayanori
Journal of Nuclear Science and Technology, 62(11), p.1051 - 1070, 2025/11
Times Cited Count:0 Percentile:0.00(Nuclear Science & Technology)The Japan Atomic Energy Agency is working on the research and development of an accelerator-driven nuclear transmutation system (ADS) for transmuting minor actinides. This system combines a subcritical nuclear reactor with a high-power superconducting proton linear accelerator (JADS-linac). One of the factors limiting the advancement of the JADS-linac is beam trips, which often induce thermal cycle fatigue, thereby damaging the components in the subcritical core. The average beam current of the JADS-linac is 32 times higher than that of the linear accelerator (linac) of the Japan Proton Accelerator Research Complex (J-PARC). Therefore, according to the development stage, comparing the beam trip frequency of the JADS-linac with the allowable beam trip frequency (ABTF) is necessary. Herein the beam trip frequency of the JADS-linac was estimated through a Monte Carlo program using the reliability functions based on the operational data of the J-PARC linac. The Monte Carlo program afforded the distribution of the beam trip duration, which cannot be obtained using traditional analytical methods. Results show that the frequency of the beam trips with a duration exceeding 5 min must be reduced to 27% of the current J-PARC linac level to be below the ABTF.
Makimura, Shunsuke*; Matoba, Shiro*; Sunagawa, Hikaru*; Naoe, Takashi; Wakui, Takashi; Ishida, Taku*; Matsubara, Tsurayuki*; Fukao, Yoshinori*; Takahashi, Hitoshi*; Watanabe, Hiroaki*; et al.
Proceedings of 71st ICFA Advanced Beam Dynamics workshop on High-Intensity and High-Brightness Hadron Beams (HB2025) (Internet), p.359 - 363, 2025/10
In modern proton accelerators, the survivability of beam-intercepting devices, such as targets, beam windows and beam dumps, under intense beam irradiation is a key factor limiting the achievement of higher beam power. This article introduces the challenges faced by the secondary particle production targets and beam windows at the Japan Proton Accelerator Research Complex (J-PARC), and the developments undertaken to overcome these challenges.
Yamaguchi, Yuji; Kondo, Yasuhiro; Meigo, Shinichiro; Shinozaki, Shinichi; Takayanagi, Tomohiro; Fujimori, Hiroshi*; Kawamura, Naritoshi*
Journal of Physics; Conference Series, 3094(1), p.012023_1 - 012023_5, 2025/09
The 3-GeV proton beam from the rapid cycling synchrotron (RCS) of J-PARC is transported to the spallation neutron source at Materials and Life Science Experimental Facility (MLF) by a 3-GeV RCS to Neutron facility Beam Transport (3NBT) line. Recently, the first design idea of a new proton beam transport line has been proposed for a future target station of the MLF (TS2). In the present study, proton beam transport is simulated near the TS2 target where a bending magnet and a solenoid are located for muon beam transport. The purposes are to clarify the magnetic field effects on the proton beam by the magnets and to present a method to correct each effect. Orbit deviation by the bending magnet and vertical size expansion due to profile rotation by the solenoid can be corrected by installing additional bending magnets and a solenoid with reversal magnetic field, respectively. The correction method is expected to be effective and also needs to be studied further for detail design.
Yamazaki, Dai; Maruyama, Ryuji; Aoki, Hiroyuki; Hanashima, Takayasu*; Akutsu-Suyama, Kazuhiro*; Miyata, Noboru*; Soyama, Kazuhiko
Quantum Beam Science (Internet), 9(2), p.20_1 - 20_12, 2025/06
Toyota, Kodai; Onizawa, Takashi; Wakai, Eiichi*
Research & Development in Material Science (Internet), 21(5), p.2632 - 2637, 2025/06
Meigo, Shinichiro; Iwamoto, Hiroki; Sugihara, Kenta*; Hirano, Yukinori*; Tsutsumi, Kazuyoshi*; Saito, Shigeru; Maekawa, Fujio
JAEA-Technology 2024-026, 123 Pages, 2025/03
Based on the design of the ADS Target Test Facility (TEF-T) at the J-PARC Transmutation Experimental Facility, a conceptual study was conducted on the J-PARC proton beam irradiation facility. This research was carried out based on the recommendations of the Nuclear Transmutation Technology Evaluation Task Force of the MEXT. The recommendations state that it is desirable to consider facility specifications that can make the most of the benefits of using the existing J-PARC proton accelerator while also solving the engineering issues of the ADS. We considered facilities that could respond to a variety of needs while reducing the facilities that were not needed in the TEF-T design. In order to clarify these diverse needs, we investigated the usage status of representative accelerator facilities around the world. As a result, it became clear that the main purposes of these facilities were (1) Material irradiation, (2) Soft error testing of semiconductor devices using spallation neutrons, (3) Production of RI for medical use, and (4) Proton beam use, and we investigated the facilities necessary for these purposes. In considering the facility concept, we assumed a user community in 2022 and reflected user opinions in the facility design. This report summarizes the results of the conceptual study of the proton irradiation facility, various needs and responses to them, the roadmap for facility construction, and future issues.
Takahatake, Yoko; Watanabe, So; Watanabe, Masayuki; Sano, Yuichi; Takeuchi, Masayuki
Progress in Nuclear Science and Technology (Internet), 7, p.195 - 198, 2025/03
Extraction chromatgraphy technology for trivalent minor actinide (MA(III) ; Am(III) and Cm(III)) recovery from the solution generated by an extraction process in reprocessing of spent nuclear fuel has been developed. A fine particle is generated in the solution. The fine particle must be removed before MA recovery operation, because that leads clogging of the extraction chlomatography column. In order to prevent clogging the column, filtration system utilizing porous silica beads packed column has been designed. In this study, a fine particle trapping system was developed and particle removal performance of the system was experimentally evaluated using alumina particles as simulated fine particle. Column experiments revealed that the fine particle with the particle size from 0.12 to 15
m is cause of clogging of the filtration column. Since simulated fine particles were trapped on filtration experiments, a filtration system using the porous silica beads column is practical,
Teshigawara, Makoto; Lee, Y.*; Tatsumoto, Hideki*; Hartl, M.*; Aso, Tomokazu; Iverson, E. B.*; Ariyoshi, Gen; Ikeda, Yujiro*; Hasegawa, Takumi*
Nuclear Instruments and Methods in Physics Research B, 557, p.165534_1 - 165534_10, 2024/12
Times Cited Count:1 Percentile:21.51(Instruments & Instrumentation)At Japanese Spallation Neutron Source in J-PARC, the para-hydrogen fraction was measured by using Raman spectroscopy in-situ for an integrated beam power of 9.4 MW
h at 1 MW operation, to evaluate the functionality of the ferric oxyhydroxide catalyst. This result showed that full functionality of the catalyst was retained up to the 1 MW operation. We attempted to study the effect of neutron scattering driven para to ortho-hydrogen back-conversion rate in the absence of the catalyst effect with a bypass line without catalyst. The measured increase of ortho-hydrogen fraction was 0.44% for an integrated beam power of 2.4 MW
h at 500 kW operation, however, which was considered to be due to not only to neutron collisions in cold moderators but also to the high ortho-hydrogen fraction of initially static liquid hydrogen in the bypass line and passive exudation of quasi-static hydrogen in the catalyst vessel to the main loop.
Materials Sciences Research Center
JAEA-Review 2024-037, 141 Pages, 2024/11
Fifteen neutron beam experimental instruments managed by JAEA are installed in JRR-3 (Japan Research Reactor No.3) and are available for internal use including upgrading of instruments and for external users to produce various research results. This report summarizes the progress of internal application research and technical development such as upgrading of neutron beam instruments in the fiscal years 2021 and 2022 after the restart of operation.
Yee-Rendon, B.; Kondo, Yasuhiro; Tamura, Jun; Maekawa, Fujio; Meigo, Shinichiro
Proceedings of 21st Annual Meeting of Particle Accelerator Society of Japan (Internet), p.205 - 209, 2024/10
The Japan Atomic Energy Agency (JAEA) designs a 30-MW CW proton linear accelerator (linac) as a key component for the accelerator-driven subcritical system (ADS) project, aimed at nuclear waste management. The low energy beam transport (LEBT) in JAEA-ADS uses charge neutralization to minimize space-charge effects, which are the primary cause of beam loss in high-power accelerators. During commissioning and power ramp-up, precise control of the duty cycle is required for safety and machine protection; thus, a chopper system will be installed to manage the beam power. The chopper is located at the LEBT, to facilitate the disposal of the excess beam power, but its operation will affect the charge neutralization producing beam transients that could lead to beam loss. To shed light on this, we created a beam optics model for the chopper using an analytic approach to determine the required characteristics like voltage and dimensions, which was confirmed through TraceWin simulations. Subsequently, we analyzed the chopper's impact on space-charge compensation to evaluate the beam transients in the LEBT. This study reports the design of the chopper and its effects on beam performance for the JAEA-ADS LEBT.
Yee-Rendon, B.; Kondo, Yasuhiro; Tamura, Jun; Maekawa, Fujio; Meigo, Shinichiro
Proceedings of 32nd Linear Accelerator Conference (LINAC 2024) (Internet), p.488 - 491, 2024/10
The Japan Atomic Energy Agency (JAEA) is designing a 30-MW CW proton linear accelerator (linac) for nuclear waste transmutation. Space-charge is the primary challenge in achieving low losses and high beam quality for high-power accelerators, especially at low energy levels where space-charge forces are greater. To counteract the space-charge effects, the low-energy beam transport (LEBT) uses a magnetostatic design to enable the neutralization of the beam charge, the so-called space charge compensation. The neutralization is an accumulation process that reaches a charge balance between the main beam and the opposite ionized particles. However, this equilibrium is destroyed by the chopper system used during beam ramping. During those transient regimes, the beam optics conditions are not optimal for the beam, producing considerable degradation that can end in serious damage to the accelerator. Thus, analysis of beam behavior at these periods is essential to develop a robust design and an efficient operation of the JAEA-ADS linac. This study presents the beam dynamics of neutralization build-up and chopper operation for the JAEA-ADS LEBT.
Murota, Nobuo*; Kato, Koji*; Takeuchi, Sadamitsu*; Masaki, Nobuo*; Fujita, Satoshi*; Okamura, Shigeki; Yamamoto, Tomohiko; Ahmadi, H.*; Picken, R.*; Kingston, J.*
Proceedings of 18th World Conference on Earthquake Engineering (WCEE2024) (Internet), 12 Pages, 2024/06
Nakajima, Taro*; Watanabe, Masao; Inamura, Yasuhiro; Tamatsukuri, Hiromu; 8 of others*
Physical Review Research (Internet), 6(2), p.023109_1 - 023109_9, 2024/05
Suzuki, Motomu*; Nagaya, Yasunobu
Journal of Nuclear Science and Technology, 61(2), p.177 - 191, 2024/02
Times Cited Count:2 Percentile:25.59(Nuclear Science & Technology)With the release of the latest Japanese evaluated nuclear data library JENDL-5, the prediction accuracy of JENDL-5 for neutronics parameters of the BEAVRS benchmark for the hot zero power condition was evaluated in this study. The criticality, control rod bank worth (CRW), isothermal temperature coefficient (ITC), and in-core detector signals were calculated and compared with the measured data for evaluation. For the criticality, the calculation-to-experimental (C/E) values varied between 1.0001 and 1.0045. Sensitivity analysis by replacing cross section data from the JENDL-4.0u1 with JENDL-5 revealed that
H,
U,
U, and
O significantly affected the criticality. The individual CRW agreed within 50 pcm, and total CRW also agreed within 100 pcm from the measured values. The ITC results calculated with a temperature deviation of 5.56 K case were negatively overestimated comparing with the measured values; whereas those of with 2.78 K were improved and agree with the measured values within a standard deviation. The axial detector signals indicated a maximum relative error of 4.46% and the root mean squared error (RMSE) of 2.13%. The differences between the previous version of JENDL-4.0u1 and JENDL-5 were also investigated.
Kim, G.*; Cho, S.-M.*; Im, S.*; Suh, H.*; Morooka, Satoshi; Shobu, Takahisa; Kanematsu, Manabu*; Machida, Akihiko*; Bae, S.*
Construction and Building Materials, 411, p.134529_1 - 134529_18, 2024/01
Times Cited Count:19 Percentile:73.55(Construction & Building Technology)