Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ichikawa, Shoichi; Chiba, Yusuke; Ono, Fumiyasu; Hatori, Masakazu; Kobayashi, Takanori; Uekura, Ryoichi; Hashiri, Nobuo*; Inuzuka, Taisuke*; Kitano, Hiroshi*; Abe, Hisashi*
JAEA-Research 2016-021, 32 Pages, 2017/02
In order to reduce the influence on a plant schedule of the MONJU by the maintenance of dew point hygrometers, The JAEA examined a capacitance type dew point hygrometer as an alternative dew point hygrometer for a lithium-chloride type dew point hygrometer which had been used at the CV-LRT in the MONJU. As a result of comparing a capacitance type dew point hygrometer with a lithium-chloride type dew point hygrometer at the CV-LRT (Atmosphere: nitrogen, Testing time: 24 hours), there weren't significant difference between a capacitance type dew point hygrometer and a lithium-chloride type dew point hygrometer. As a result of comparing a capacitance dew point hygrometer with a high-mirror-surface type dew point hygrometer for long term verification (Atmosphere: air, Testing time: 24 months), the JAEA confirmed that a capacitance type dew point hygrometer satisfied the instrument specification (
2.04
C) required by the JEAC4203-2008.
Oi, Motoki; Meigo, Shinichiro; Akutsu, Atsushi*; Kawasaki, Tomoyuki; Nishikawa, Masaaki*; Fukuda, Shimpei
Proceedings of 12th International Topical Meeting on Nuclear Applications of Accelerators (AccApp '15), p.89 - 96, 2016/00
At J-PARC, 3 GeV proton beam with power of 1MW is delivered to the spallation neutron source (JSNS) through beam transport line called 3NBT. At the high power accelerator facilities even a small abnormal event has a possibility to be critical so that the beam control system is crucial. In order to find tiny anomaly, rapid data analysis system is required. We developed control and data analysis system based on the Experimental Physics and Industrial Control System (EPICS) and Control System Studio (CSS). To carry out beam tuning efficiently, the beam control system based on the Strategic Accelerator Design (SAD) code has been developed. With the several shots of beam and by the one click of operational panel of the screen, required magnet field can be calculated and set automatically. Also we developed automated e-mail system to announce the abnormal event to the experts persons. With these systems, we can reduce both beam tuning time and down time.
Oi, Motoki; Sakai, Kenji; Watanabe, Akihiko; Akutsu, Atsushi; Meigo, Shinichiro; Takada, Hiroshi
JPS Conference Proceedings (Internet), 8, p.036007_1 - 036007_5, 2015/09
This paper reports on upgrading of the monitor and operation (MO) system for a general control system (GCS) of the Materials and Life science experimental Facility (MLF) at J-PARC. The MLF-GCS consists of programmable logic controllers (PLCs), operator interfaces (OPIs) for integral control and interlock systems, shared servers, and so on. It is controlling various components of the pulsed spallation neutron source such as a mercury target and hydrogen moderators. The MO system is used for monitoring, alarm notification and remote control from the MLF control room. The GCS has been working well as expected, but current MO system which consists of the OPIs and data servers based on iFix has some problems in view of sustainable maintenance because of its poor flexibility of supported OS and software version compatibility. To overcome the problems, we upgraded the MO system to be operated using the framework of EPICS, the OPI of Control System Studio (CSS) and the server software of Postgre SQL. This improves versatility of the MO system, enabling to run on various platforms such as Windows, Linux and Mac OS. At first, we made a prototype MO system, which processed 100 points of data and 5 operation screens and verified that the MO system functions correctly. Then we made full spec MO system which processes the data point of 7000 and operation screens of 130. It was operated in parallel with the current system to evaluate its performance with real data such as data transmission speed from PLCs, control functions from OPI, storage capability of servers and long-term reliability. As results, the new MO system achieved the communication speed of 2 Hz and its operability compatible to the current system. Now, we are operating and debugging it in comparison with the current system during the operating period as a preparation for the system replacement at the end of 2014.
Usami, Hiroki; Takahashi, Hiroki; Komukai, Satoshi*
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.760 - 763, 2015/09
EU and JAEA are advancing development of Linear IFMIF Prototype Accelerator (LIPAc) control system jointly, but JAEA keeps developing central control system (CCS) mainly. Data transfer during an equipment control system of CCS and EU is performed through EPICS. JAEA is using PostgreSQL as 1 of development elements in CCS and is advancing development of the system to record the whole EPICS data of LIPAc (the data acquisition system). On the other hand, a data acquisition is performed using BEAUTY (Best Ever Archive Toolset, yet) in an element test of equipment at Europe. Therefore "1 client refers to collected data by more than one server machine" with "compatibility securement of data with BEAUTY" in case of development of the data acquisition system of CCS, and, it's necessary to consider "To do a data acquisition and backup work at the same time". For the moment, former 2 are in progress. And a demonstration of the data acquisition system is being performed simultaneously with commissioning in injector. The data acquisition system is collecting data of injector other ones, and the data reference by a monitor with CSS (Control System Studio) is also possible. We will report on the current state of the development of the data acquisition system by making reference to a result of the test by injector commissioning.
; ; ; Sudo, Yukio;
JAERI-M 84-238, 69 Pages, 1985/01
no abstracts in English
JAERI-M 7944, 146 Pages, 1978/11
no abstracts in English