Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Accomplishment of JT-60U disassembly work dealing with radioactive components

Ikeda, Yoshitaka; JT-60 Team

Proceedings of 23rd International Conference on Nuclear Engineering (ICONE-23) (DVD-ROM), 6 Pages, 2015/05

The upgrade of the JT-60U to the superconducting tokamak "JT-60SA" has been carried out to contribute the early realization of fusion energy. Disassembly of the JT-60U tokamak was required so as to newly install the JT-60SA torus at the same position in the torus hall. The JT-60U tokamak was featured by the radioactivation due to deuterium-deuterium (D-D) reactions of 1.5$$times$$10$$^{20}$$ (n) in total. About 13,000 components with a total weight of more than 5,400 tonnes were removed from the torus hall and stored safely in storage facilities with recording the data such as dose rate, weight and kind of material, so as to apply the clearance level regulation in future. It was confirmed that the main radioactive material of the disassembly components was the stainless steel and that its dose rate was almost background level ($$sim$$0.1 micro Sv/h) at $$sim$$10m far from the vacuum vessel. The assembly of JT-60SA tokamak has started in January 2013 after this disassembly of the JT-60U tokamak.

JAEA Reports

Disassembly of the NBI system on JT-60U for JT-60 SA

Akino, Noboru; Endo, Yasuei; Hanada, Masaya; Kawai, Mikito*; Kazawa, Minoru; Kikuchi, Katsumi*; Kojima, Atsushi; Komata, Masao; Mogaki, Kazuhiko; Nemoto, Shuji; et al.

JAEA-Technology 2014-042, 73 Pages, 2015/02

JAEA-Technology-2014-042.pdf:15.1MB

According to the project plan of JT-60 Super Advanced that is implemented as an international project between Japan and Europe, the neutral beam (NB) injectors have been disassembled. The disassembly of the NB injectors started in November, 2009 and finished in January, 2012 without any serious problems as scheduled. This reports the disassembly activities of the NB injectors.

Journal Articles

Disassembly of JT-60 tokamak device for JT-60SA Project; Disassembly of radioactivated large structures

Okano, Fuminori; Ikeda, Yoshitaka; Sakasai, Akira; Hanada, Masaya; JT-60 Team

Purazuma, Kaku Yugo Gakkai-Shi, 90(10), p.630 - 639, 2014/10

JT-60 tokamak device, as a largest nuclear fusion device in the world, started the experiments since 1985 and had accomplished the research and development of plasma performance toward the DEMO. The project has successfully completed it operation in August 2008 with many results such as accomplishment of break-even plasma condition in 1996. This disassembly was required for JT-60SA project, which is the Satellite Tokamak project under Japan-EU international corroboration to modify the JT-60 to the superconducting tokamak. This work was the first experience of disassembling a large radioactive fusion device based on Radiation Hazard Prevention Act in Japan. This report presents the outline of disassembly of JT-60 tokamak device.

Journal Articles

Status of research reactor decommissioning in Japan

Onishi, Nobuaki; Shirai, Eiji

Proc. of the 9th Pacific Basin Nuclear Conf., Vol. 2, p.1071 - 1076, 1994/00

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1