Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Risk communication activity which used "YUME Chisoukan" in the Horonobe Underground Research Center (FY 2024)

Hoshino, Masato; Sasaki, Yoshifumi; Horikoshi, Hidehiko*; Tani, Kosuke*

JAEA-Review 2025-047, 122 Pages, 2026/03

JAEA-Review-2025-047.pdf:3.75MB

Horonobe Underground Research Center managed by Japan Atomic Energy Agency (JAEA) is the Japan's best environment to understand the project of geological disposal of high-level radioactive waste, because there is an Underground Research Laboratory (URL) in the center besides an exhibition facility which explains the content of research conducted in the URL. In the area of the center, there is also an exhibition facility for the full-scale model of engineered barrier system of geological disposal. JAEA takes advantage of this opportunity to conduct public hearing including questionnaire research regarding the questions, anxieties and comments by the visitors for geological disposal project. This report summarizes the result of statistical analysis of 2,830 visitors from April 2024 to January 2025.

Journal Articles

Prediction analysis of the development of the excavation damaged zone around the gallery excavated at 500 m depth at Horonobe Underground Research Laboratory

Aoyagi, Kazuhei; Tamura, Tomonori; Ozaki, Yusuke; Ishii, Eiichi; Motoshima, Takayuki*; Sugawara, Kentaro*

Dai-51-Kai Gamban Rikigaku Ni Kansuru Shimpojiumu Koen Rombunshu(Internet), p.119 - 124, 2025/12

In a high-level radioactive waste disposal, it is important to understand the extent of the Excavation Damaged Zone (EDZ) because it can be one of the factors to determine whether disposal galleries or pits can be excavated or not in the design or construction phases. In this study, we performed a hydro-mechanical coupling analysis to simulate the three-dimensional excavation of the twin galleries which were excavated at a depth of 500 m in the Horonobe Underground Research Laboratory. The analysis revealed that the EDZ was developed 1.5-2.0 m from the gallery wall. The stress acting on the shotcrete was within the ultimate limit state. Based on these results, we estimated that the stability of the twin galleries will be maintained, despite the relatively large extent of the EDZ.

2 (Records 1-2 displayed on this page)
  • 1