Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Foreword

Kikuchi, Kenji

Journal of Nuclear Materials, 343(1-3), P. vii, 2005/08

The sixth International Workshop on Spallation Materials Technology was held on November 30 to December 5, 2003, in Hayama, Kanagawa, Japan. This volume contains the proceedings of that meeting and includes nearly all of the papers presented at the workshop. High Energy Accelerator Research Organization and Japan Atomic Energy Research Institute organized this meeting in cooperation with Forschungszentrum Julich (FZJ), Germany; Los Alamos National Laboratory (LANL), USA; Paul Scherrer Institute (PSI), Switzerland; and Oak Ridge National Laboratory (ORNL), USA.

Journal Articles

JAERI tandem accelerator and RNB project

Yoshida, Tadashi; Kanda, Susumu; Takeuchi, Suehiro; Horie, Katsuzo; Ouchi, Isao; Tsukihashi, Yoshihiro; Hanashima, Susumu; Abe, Shinichi; Ishizaki, Nobuhiro; Tayama, Hidekazu; et al.

Dai-15-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.51 - 53, 2003/03

no abstracts in English

Journal Articles

The JAERI-KEK joint RIB project

Takeuchi, Suehiro

AIP Conference Proceedings 680, p.229 - 236, 2003/00

JAERI and KEK-Institute of Particle and Nuclear Studies are collabarating to build an ISOL-type radioactive ion beam(RIB) acceleration system in the JAERI-Tokai tandem accelerator lab. In this project, the tandem accelerator is used as a proton beam driver to create RIB from fission products of a uranium target and a RIB accelerator already built by KEK will be installed in an old target room of the tandem accelerator lab. The beam energy is 1.1 MeV/nucleon, which is not sufficient for experiments related to nuclear reactions. They have a plan to boost the beams to 5 - 9 MeV/u by developing a pre-booster and using existing super-conducting tandem-booster. The plan of this project, acceleration divices and present status will be outlined in the RIB session of the CAARI.

Journal Articles

Lattice design of 3GeV synchrotron for JAERI-KEK joint project

Noda, Fumiaki*;

JAERI-Conf 2001-002, p.274 - 284, 2001/03

no abstracts in English

Journal Articles

Status of high intensity proton accelerator project and its research program

Oyama, Yukio

Nihon Genshiryoku Gakkai Monte Karuro Ho Ni Yoru Ryushi Shimyureshon No Genjo To Kadai, p.183 - 191, 2001/01

no abstracts in English

Journal Articles

X-ray rocking curve study of the strain profile formed by MeV ion implantation into(111)silicon wafers

*; Tomimitsu, Hiroshi; *; *; *; Aizawa, Kazuya; Okayasu, Satoru; *; Kazumata, Yukio*; Y.C.Jiang*; et al.

Japanese Journal of Applied Physics, Part 1, 36(12A), p.7296 - 7301, 1997/12

 Times Cited Count:6 Percentile:37.51(Physics, Applied)

no abstracts in English

6 (Records 1-6 displayed on this page)
  • 1