Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kobayashi, Shinji*; Niimi, Katsuyuki*; Tsuji, Masakuni*; Yamada, Toshiko*; Aoyagi, Yoshiaki; Sato, Toshinori; Mikake, Shinichiro; Osawa, Hideaki
JAEA-Technology 2015-039, 170 Pages, 2016/02
The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) plan consists of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security, and (5) development of technologies regarding restoration or reversal and mitigating of the excavation effect. To develop design and construction planning technologies, and countermeasure technology, the analysis of measured data during earthquake and seismic movement characteristics at deep underground, and the examination of grouting method were carried out. For the characteristics of earthquake ground motion, measurement data obtained by seismometers installed in the Mizunami Underground Laboratory were analyzed, and the comprehensive assessment of the relationship between the measurement data and the geological condition at each depth was performed. As for "Study on grouting method at deep underground ", post grouting was carried out and evaluated based on the Construction plan in FY2013. Furthermore, target of the future R&D was proposed.