Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Maekawa, Fujio; Takei, Hayanori
Purazuma, Kaku Yugo Gakkai-Shi, 98(5), p.206 - 210, 2022/05
In developing an accelerator-driven nuclear transmutation system (ADS), it is necessary to solve technical issues related to proton beams, such as the development of materials that can withstand high-intensity proton beams and the characterization of subcritical cores driven by proton beams. Therefore, at the high-intensity proton accelerator facility J-PARC, a transmutation experimental facility that actually conducts various tests using a high-intensity proton beam is being planned. This paper introduces the outline and future direction of the transmutation experimental facility.
Maekawa, Fujio; Transmutation Expeimental Facility Design Team
Plasma and Fusion Research (Internet), 13(Sp.1), p.2505045_1 - 2505045_4, 2018/05
The partitioning and transmutation (P-T) technology has promising potential for volume reduction and mitigation of degree of harmfulness of high-level radioactive waste. JAEA is promoting development of the P-T technology by using an accelerator driven system (ADS). To facilitate the development, we have a plan to construct the Transmutation Experimental Facility (TEF) as one of experimental facilities of J-PARC (Japan Proton Accelerator Research Complex). TEF consists of two facilities: the ADS Target Test Facility (TEF-T) and the Transmutation Physics Experimental Facility (TEF-P). Recent progress in design and R&D efforts toward construction of J-PARC TEF will be presented.
Iwamoto, Hiroki; Maekawa, Fujio; Matsuda, Hiroki; Meigo, Shinichiro
JAEA-Technology 2017-029, 39 Pages, 2018/01
Under an assumption that an incident of lead-bismuth eutectic (LBE) leak from an LBE circulation system occurred during a 250-kW beam operation, an estimation of radiation dose at the site boundary for the ADS Target Test Facility (TEF-T) in Transmutation Experimental Facility (TEF) of J-PARC was conducted using various conservative assumptions. As a result, the radiation dose at the site boundary was estimated to be about 660
Sv, which were dominated by mercury, noble gas, and iodine produced as spallation products from the LBE. Even though the incident scenario was made conservatively, it was shown that the estimated total dose was lower than the annual radiation dose due to natural sources, and the TEF-T has sufficient safety margin for the leak of radioactivity.
Wan, T.; Obayashi, Hironari; Sasa, Toshinobu
Proceedings of 17th International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-17) (USB Flash Drive), 13 Pages, 2017/09
Nuclear Transmutation Division, J-PARC Center
JAEA-Technology 2017-003, 539 Pages, 2017/03
JAEA is pursuing R&D on volume reduction and mitigation of degree of harmfulness of high-level radioactive waste based on the "Strategic Energy Plan" issued in April 2014. Construction of Transmutation Experimental Facility is under planning as one of the second phase facilities in the J-PARC program to promote R&D on the transmutation technology with using accelerator driven systems (ADS). The TEF consists of two facilities: ADS Target Test Facility (TEF-T) and Transmutation Physics Experimental Facility (TEF-P). Development of spallation target technology and study on target materials are to be conducted in TEF-T with impinging a high intensity proton beam on a lead-bismuth eutectic target. Whereas in TEF-P, by introducing a proton beam to minor actinide loaded subcritical cores, physical properties of the cores are to be studied, and operation experiences are to be acquired. This report summarizes results of technical design for construction of one of two TEF facilities, TEF-T.