Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ito, Shinji*; Shimizu, Hiroyuki*; Ono, Shintaro*; Takayama, Yusuke
Doboku Gakkai Rombunshu (Internet), 80(8), p.24-00030_1 - 24-00030_18, 2024/08
In the design consideration of a geological disposal facility for radioactive waste, it is essential to perform a mechanical evaluation that takes into account phenomena that may occur from construction and operation to post-closure. With this background, we have developed the long-term mechanical analysis system MACBECE. In this research, we have built an analysis system that can consistently evaluate the mechanical behavior considering the thermal and hydraulic evolution after the closure of the repository by incorporating the constitutive model for unsaturated soils and coupling with the thermal-hydraulic analysis. As a validation, a mechanical analysis was conducted for the in-situ experiment for full-scale engineered barrier system performance experiment at Horonobe URL. Despite some discrepancies due to constraints in two-dimensional analysis, the extended functionality of the analysis code was confirmed to effectively repro-duce the measured data.
Nakayama, Masashi; Ono, Hirokazu
JAEA-Research 2019-007, 132 Pages, 2019/12
The Horonobe Underground Research Laboratory (URL) Project has being pursued by Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, northern Hokkaido. The URL Project consists of two major research areas, "Geoscientific Research" and "Research and Development on Geological Disposal Technologies". The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) had been prepared from 2013 to 2014 fiscal year at GL-350m gallery, and heating by electric heater in simulated overpack had started in January, 2015. One of objectives of the EBS experiment is acquiring data concerned with Thermal-Hydrological-Mechanical-Chemical (THMC) coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. This report shows following works had carried out at the GL-350 m gallery. Excavation of a test niche and a test pit, Setting buffer material blocks and a simulated overpack into the test pit, Backfilling the niche by compaction backfilling material and setting backfilling material blocks, Casting concrete type plug and contact grouting, Consolidate measurement system and start measuring.
Nakayama, Masashi
JAEA-Technology 2018-006, 43 Pages, 2018/08
The Horonobe URL Project has being pursued by JAEA to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, Hokkaido. The URL Project proceeds in 3 overlapping phases, "Phase I: Surface-based investigations", "Phase II: Investigations during tunnel excavation" and "Phase III: Investigations in the underground facilities", over a period of around 20 years. The OP corrosion test was prepared from 2013 FY at Niche No.3, and heating by electric heater in simulated overpack started in November, 2014. The objective of the test is acquiring data concerned with corrosion of carbon steel OP. These data will be used in order to confirm the performance of engineered barrier system. In the OP corrosion test, the diameter of simulated OP and buffer material are 100 mm and 300 mm, respectively. Concrete support using low alkaline cement was used in order to investigate the effect of cementitious materials to OP corrosion behavior. We will measure corrosion potential of carbon steel, natural potential, pH in buffer material for several years. In this report, we describe how to make simulated OP and buffer material blocks, and set sensors, and so on.
Nakayama, Masashi; Niunoya, Sumio*; Miura, Norihiko*; Takeda, Nobufumi*
JAEA-Research 2017-016, 62 Pages, 2018/01
The Horonobe URL Project has being pursued by JAEA to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, Hokkaido. The URL Project consists of 2 major research areas, "Geoscientific Research" and "Research and Development on Geological Disposal Technologies", and proceeds in 3 overlapping phases, over a period of around 20 years. Phase III (Investigations in the underground facilities) investigation was started in 2010 FY. The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) had started 2013 at GL-350 m gallery, and heating by electric heater in simulated overpack had started in January, 2015. One of objectives of the EBS experiment is acquiring data concerned with THMC coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. This report shows consideration of concrete-type plug composition. The low alkaline cement developed by JAEA, called HFSC, was used for the plug. HFSC has used in construction test at the gallery as shotcrete in Horonobe URL.
Nakayama, Masashi; Matsuzaki, Tatsuji*; Niunoya, Sumio*
JAEA-Research 2016-010, 57 Pages, 2016/08
The Horonobe URL Project has being pursued by JAEA to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, northern Hokkaido. The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) had been prepared from 2013 to 2014 fiscal year at G.L.-350m gallery, and heating by electric heater in simulated overpack had started in January, 2015. One of objectives of the experiment is acquiring data concerned with Thermal -Hydrological - Mechanical - Chemical coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. In this report, It is summarized the production of casing drilling machine for large diameter, simulated overpack, buffer material blocks and backfilling material for EBS experiment.
Nakayama, Masashi; Ono, Hirokazu; Nakayama, Mariko*; Kobayashi, Masato*
JAEA-Data/Code 2016-005, 55 Pages, 2016/07
The Horonobe URL Project has being pursued by JAEA to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, northern Hokkaido. The Project consists of two major research areas, "Geoscientific Research" and "Research and Development on Geological Disposal Technologies", and proceeds in three overlapping phases, "Phase I: Surface-based investigations", "Phase II: Investigations during tunnel excavation" and "Phase III: Investigations in the underground facilities". Phase III investigation was started in 2010 fiscal year. The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) had been prepared from 2013 to 2014 fiscal year at GL-350m gallery, and heating by electric heater in simulated overpack had started in January, 2015. One of objectives of the experiment is acquiring data concerned with Thermal-Hydrological-Mechanical-Chemical (THMC) coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. This report summarizes the measurement data acquired from the EBS experiment from December, 2014 to March, 2016.
Nakayama, Masashi; Ono, Hirokazu; Tanai, Kenji; Sugita, Yutaka; Fujita, Tomoo
JAEA-Research 2016-002, 280 Pages, 2016/06
The Horonobe Underground Research Laboratory (URL) Project has being pursued by Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, northern Hokkaido. The URL Project consists of two major research areas, "Geoscientific Research" and "Research and Development on Geological Disposal Technologies", and proceeds in three overlapping phases, "Phase I: Surface-based investigations", "Phase II: Investigations during tunnel excavation" and "Phase III: Investigations in the underground facilities", over a period of around 20 years. Phase III investigation was started in 2010 fiscal year. The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) had been prepared from 2013 to 2014 fiscal year at G.L.-350m gallery (Niche No.4), and heating by electric heater in simulated overpack had started in January, 2015. One of objectives of the experiment is acquiring data concerned with Thermal-Hydrological-Mechanical-Chemical (THMC) coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. In EBS experiment, the backfill material using mixture of bentonite and muck from Horonobe URL construction was used for backfilling a part of Niche No.4. This report shows the results of properties of the backfill material, confirmation test of compaction method and making backfill material block, and so on. From these results, it was confirmed that the backfill material would satisfy target value of the permeability and the swelling pressure.
Kobayashi, Masato*; Saito, Masahiko*; Iwatani, Takafumi*; Nakayama, Masashi; Tanai, Kenji; Fujita, Tomoo; Asano, Hidekazu*
JAEA-Research 2015-018, 14 Pages, 2015/12
JAEA and RWMC concluded the letter of cooperation agreement on the research and development of radioactive waste disposal in April, 2005, and have been carrying out the collaboration work based on the agreement. JAEA have been carrying out the Horonobe URL Project which is intended for a sedimentary rock in the Horonobe town, Hokkaido, since 2001. In the project, geoscientific research and research and development on geological disposal technology are being promoted. Meanwhile, The Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry has been promoting construction of equipments for the full-scale demonstration of engineered barrier system and operation technology for high-level radioactive waste disposal since 2008, to enhance public's understanding to the geological disposal of HLW, e.g. using underground facility. RWMC received an order of the project in fiscal year 2014 continuing since fiscal year 2008. Since topics in this project are included in the Horonobe URL Project, JAEA carried out this project as collaboration work continuing since fiscal year 2008. This report summarizes the results of the research on engineering technology carried out in this collaboration work in fiscal year 2014.
Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Sawada, Sumiyuki*; Asano, Hidekazu*; Saito, Masahiko*; Yoshino, Osamu*; Kobayashi, Masato*
JAEA-Research 2014-031, 44 Pages, 2015/03
Japan Atomic Energy Agency (JAEA) and Radioactive Waste Management Funding and Research Center (RWMC) concluded the letter of cooperation agreement on the research and development of radioactive waste disposal in April, 2005, and have been carrying out the collaboration work based on the agreement. JAEA have been carrying out the Horonobe Underground Research Laboratory (URL) Project which is intended for a sedimentary rock in the Horonobe town, Hokkaido, since 2001. In the project, geoscientific research and research and development on geological disposal technology are being promoted. Meanwhile, the government (the Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry) has been promoting construction of equipments for the full-scale demonstration of engineered barrier system (EBS) and operation technology for high-level radioactive waste (HLW) disposal since 2008, to enhance public's understanding to the geological disposal of HLW, e.g. using underground facility. RWMC received an order of the project in fiscal year 2012 (2011/2012) continuing since fiscal year 2008 (2008/2009). Since topics in this project are included in the Horonobe URL Project, JAEA carried out this project as collaboration work continuing since fiscal year 2008. This report summarizes the results of engineering technology carried out in this collaboration work in fiscal year 2013. In fiscal year 2013, emplacement tests using buffer material block for the vertical emplacement concept were carried out and visualization tests for water penetration in buffer material were carried out.
Sekine, Keiichi; Muraoka, Susumu; Bamba, Tsunetaka
JAERI-Review 97-007, 61 Pages, 1997/03
no abstracts in English
Sekine, Keiichi; Muraoka, Susumu; Bamba, Tsunetaka
JAERI-Review 96-005, 97 Pages, 1996/03
no abstracts in English
; ; ; ; ; ; ; Nagasaki, Shinya*
Nihon Genshiryoku Gakkai-Shi, 35(5), p.420 - 437, 1993/05
Times Cited Count:6 Percentile:55.76(Nuclear Science & Technology)no abstracts in English
; ; ; ; ; ; Kimura, Hideo; Munakata, Masahiro
Nihon Genshiryoku Gakkai-Shi, 34(4), p.342 - 364, 1992/04
Times Cited Count:2 Percentile:27.30(Nuclear Science & Technology)no abstracts in English
;
Nuclear Technology, 97, p.323 - 335, 1992/03
Times Cited Count:3 Percentile:35.17(Nuclear Science & Technology)no abstracts in English
J.Ahn*;
Proc. of the 3rd Int. Symp. on Advanced Nuclear Energy Research; Global Environment and Nuclear Energy, 10 Pages, 1991/00
no abstracts in English
Shirase, Mitsuyasu*; Jo, Mayumi*; Motoshima, Takayuki*; Niunoya, Sumio*; Nakayama, Masashi; Tanai, Kenji
no journal, ,
no abstracts in English
Niunoya, Sumio*; Shimohara, Masahiro*; Jo, Mayumi*; Nago, Makito*; Nakayama, Masashi; Tanai, Kenji; Hashimoto, Yuta; Nejigane, Nobuto
no journal, ,
no abstracts in English
Nakayama, Masashi; Ono, Hirokazu; Shirase, Mitsuyasu*; Niunoya, Sumio*
no journal, ,
Japan Atomic Energy Agency is conducting the in-situ experiment for verification of performance of engineered barrier system in Horonobe Underground Research Laboratory. The purpose of this paper is reporting the current status of the experiment. This paper also reports the results of saturation status of buffer material blocks.
Sato, Shin*; Ono, Hirokazu; Tanai, Kenji; Yamamoto, Shuichi*; Fukaya, Masaaki*; Shimura, Tomoyuki*; Niunoya, Sumio*
no journal, ,
Shirase, Mitsuyasu*; Ishii, Tomoko*; Kobayashi, Ichizo*; Jo, Mayumi*; Ono, Makoto*; Nakayama, Masashi
no journal, ,
A candidate emplacement concept of the engineered barrier system (EBS) for geological disposal in Japan is vertical emplacement option, which has a certain gap is between the wall of the disposal hole and the buffer material. This gap is considered to be filled with the swollen buffer material (self-sealing function) when the underground water is infiltrated to the buffer material. However, some underground water flow conditions such as a pipe-shaped water channel induce erosion of the buffer material, which causes lowering of the function of the EBS. Therefore, RWMC (Radioactive Waste Management Funding and Research Center) studies engineering countermeasures against piping and erosion. RWMC used an intentional water supply system to test the pre-hydration of bentonite buffers.