Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Wang, H.*; Yasuda, Masahiro*; Kondo, Yosuke*; Nakamura, Takashi*; Tostevin, J. A.*; Ogata, Kazuyuki*; Otsuka, Takaharu*; Poves, A.*; Shimizu, Noritaka*; Yoshida, Kazuki; et al.
Physics Letters B, 843, p.138038_1 - 138038_9, 2023/08
Times Cited Count:2 Percentile:68.16(Astronomy & Astrophysics)Detailed -ray spectroscopy of the exotic neon isotope Ne has been performed using the one-neutron removal reaction from Ne. Based on an analysis of parallel momentum distributions, a level scheme with spin-parity assignments has been constructed for Ne and the negative-parity states are identified for the first time. The measured partial cross sections and momentum distributions reveal a significant intruder p-wave strength providing evidence of the breakdown of the N = 20 and N = 28 shell gaps. Only a weak, possible f-wave strength was observed to bound final states. Large-scale shell-model calculations with different effective interactions do not reproduce the large p-wave and small f-wave strength observed experimentally, indicating an ongoing challenge for a complete theoretical description of the transition into the island of inversion along the Ne isotopic chain.
Adare, A.*; Afanasiev, S.*; Aidala, C.*; Ajitanand, N. N.*; Akiba, Y.*; Al-Bataineh, H.*; Alexander, J.*; Aoki, K.*; Aphecetche, L.*; Armendariz, R.*; et al.
Physical Review D, 84(1), p.012006_1 - 012006_18, 2011/07
Times Cited Count:29 Percentile:72.31(Astronomy & Astrophysics)We report on the event structure and double helicity asymmetry () of jet production in longitudinally polarized collisions at = 200 GeV. Photons and charged particles were measured by the PHENIX experiment. Event structure was compared with the results from PYTHIA event generator. The production rate of reconstructed jets is satisfactorily reproduced with the next-to-leading-order perturbative QCD calculation. We measured = -0.0014 0.0037 at the lowest bin and -0.0181 0.0282 at the highest bin. The measured is compared with the predictions that assume various distributions.
Adare, A.*; Afanasiev, S.*; Aidala, C.*; Ajitanand, N. N.*; Akiba, Y.*; Al-Bataineh, H.*; Alexander, J.*; Aoki, K.*; Aphecetche, L.*; Armendariz, R.*; et al.
Physical Review D, 83(5), p.052004_1 - 052004_26, 2011/03
Times Cited Count:175 Percentile:98.48(Astronomy & Astrophysics)The PHENIX experiment at RHIC has measured the invariant differential cross section for production of , , and mesons in collisions at = 200 GeV. The spectral shapes of all hadron transverse momentum distributions are well described by a Tsallis distribution functional form with only two parameters, and , determining the high and characterizing the low regions for the spectra, respectively. The integrated invariant cross sections calculated from the fitted distributions are found to be consistent with existing measurements and with statistical model predictions.
Ioki, Kimihiro; Elio, F.*; Barabash, V.*; Chuyanov, V.*; Rozov, V.*; Wang, X.*; Chen, J.*; Wang, L.*; Lorenzetto, P.*; Peacock, A.*; et al.
Fusion Engineering and Design, 82(15-24), p.1774 - 1780, 2007/10
Times Cited Count:13 Percentile:66.15(Nuclear Science & Technology)In December 2005, the new procurement allocation plan of the ITER components among the seven Parties was prepared. The need to qualify for procurement of the specific components was especially introduced in the document. The main features and milestones of the qualification program are described in "Procurement Plan" for each specific component. Due to the complicated features of FW procurement, the procurement document has to be developed precisely. To guarantee high quality of 1700 FW panels produced by 6 different Parties, a qualification program is essential. The qualification mock-up is 80 mm wide, 240 mm long and 81 mm thick with 3 beryllium tiles 10 mm thick. Heat load tests will be performed on the qualification mock-ups in 2007 in EU and USA facilities. The maximum design heat load on the ITER FW is 0.5 MW/m (steady state) 30,000 shots. Mechanical tests of joints are also required using standardized methods. Only Parties which have satisfied the acceptance criteria of the qualification tests can proceed to the procurement stage of the ITER FW. Semi-prototypes (roughly 1000 mm 200 mm) are also requested before the ITER FW manufacturing.
Tanaka, Ryuichi; Arakawa, Kazuo; Yokota, Wataru; Nakamura, Yoshiteru; Kamiya, Tomihiro; Fukuda, Mitsuhiro; Agematsu, Takashi; Watanabe, H.; Akiyama, N.; Tanaka, S.; et al.
Proceedings of 12th International Conference on Cyclotrons and Their Applications (CYCLOTRONS 89), p.566 - 569, 1991/07
no abstracts in English
Pham, T. T.*; Yanagihara, Rikuto*; Ideguchi, Eiji*; Orlandi, R.; Nishio, Katsuhisa; Makii, Hiroyuki; Asai, Masato; Hirose, Kentaro; Tsukada, Kazuaki; Toyoshima, Atsushi*; et al.
no journal, ,