Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Report on investigation of cause of crack at instrumentation pipe in JMTR; Data book on examination of pressure instrumentation pipe at JMTR hot laboratory

Working Group for Investigation of Cause of Crack Initiation

JAERI-Tech 2003-060, 183 Pages, 2003/07

JAERI-Tech-2003-060.pdf:55.37MB

On December 10, 2002, the water leakage was found at the pressure instrumentation pipe attached to the exit pipe of No.1 charging pump of the purification system of a primary cooling system at JMTR, and the cracks were detected on the pressure instrumentation pipe by the visual observation. The Investigation Committee for Water Leakage from Instrumentation Pipe in JMTR was established and organized by specialists from inside and outside JAERI on December 16. In order to investigate the cause of crack initiation at the pressure instrumentation pipe, the Working Group was organized in the Department of JMTR. Visual inspection, fractgraphy test, metallographic observation and hardness test for the pressure instrumentation pipe and its weldment were carried out in the JMTR Hot Laboratory. This report summarized above data obtained by investigation on the cause of the crack initiation.

1 (Records 1-1 displayed on this page)
  • 1