Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Yoshida, Michihiro; Miyo, Hiroaki; ; Ishibashi, Yuzo;
Saikuru Kiko Giho, (10), p.43 - 49, 2001/03
None
; Sukegawa, Yasuhiro*; Suzuki, Satoshi*; Yoshida, Michihiro; ; *; Miyo, Hiroaki
JNC TN8440 2000-022, 180 Pages, 2000/10
At outside waste strage pits, containers for strage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Technology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessary instruments started. Decontamination of the pits started from the beginning of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the dircumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition to above, the amount of concrete poured into the pits was about 1,200 m. These data compiled the inspection of contamination in measures of closing of the pits.
Yoshida, Michihiro; Suzuki, Satoshi*; Sukegawa, Yasuhiro*; Miyo, Hiroaki
JNC TN8440 2000-021, 180 Pages, 2000/10
At outside waste storage pits, containers for storage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Thechnology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessaly instruments started. Decontamination of the pits started fiom the beginning of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the circumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition to above, the amount of concrete poured into the pits was about 1,200 m. This report compiled the photographs of the works from confirmation of stay water at August, 1997 by finish of measures of closing of the pits at September, 2000.
; Ishibashi, Yuzo; Yoshida, Michihiro; Miyo, Hiroaki; Sukegawa, Yasuhiro*; *; Suzuki, Satoshi*
JNC TN8440 2000-020, 500 Pages, 2000/10
At outside waste storage pits, containers for storage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Thechnology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessary instruments started. Decontamination of the pits started from the begining of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the circumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition t0 above, the amount of concrete poured into the pits was about 1,200 m.
Miyo, Hiroaki; Yoshida, Michihiro; *; Asami, Makoto*; Iso, Takahito*; *; *
PNC TN8440 96-010, 171 Pages, 1996/03
None
Kashiro, Kashio; Miyo, Hiroaki; Asano, Takashi; *; Shinada, Masanori*; *; Oshima, Hirofumi
PNC TN8410 90-054, 203 Pages, 1990/05
None
Oshima, Hirofumi; Miyo, Hiroaki; Asano, Takashi; Kashiro, Kashio; *; Shinada, Masanori*; *
PNC TN8410 89-015, 41 Pages, 1989/02
None
*; Kagawa, Akio; Miyo, Hiroaki*; *; *; *; *; *
PNC TN841 84-17, 79 Pages, 1984/03
no abstracts in English
*; Miyo, Hiroaki*; *; *; Maeda, Katsuo; *; *; Kagawa, Akio
PNC TN841 83-50, 28 Pages, 1983/07
no abstracts in English
*; Miyo, Hiroaki*; Ouchi, Yoshifusa; *; *
PNC TN841 78-09, 15 Pages, 1978/01
Some results of experiments donein PNC are presented on volume reduc-tion technics for alpha-bearing wastes. A pilot wood milling machine automatically mills the plywood frames of nipple connected HEPA filters, which result in fine sized wooden chips, two nipples and the filter components. The filter components are melted in an induction furnace to be homogeneous solids. These methods and incineration of wooden chips reduce the stored volume of HEPA filters to 1/501/100. PVC and neoprene rubber are decomposed in concentrated sulfuricacid, followed by oxidation with nitric acid. The acid digestion process generates chlorine-rich gas, from which only chlorine is selectively absorbed in water. An alpha-bearing vessel and aglove box are cut at their installed places without spread of plutonium contamination outside the greenhouses. *Presented at the Joint NEA/IAEA Technical Seminar on the Treatment, Conditioning and Storage of Solid Alpha-Bearing Wastes and CladdingHulls Paris, December 5-7, 1977
*; *; *; *; Ouchi, Jin; Miyo, Hiroaki*
PNC TN842 77-01, 42 Pages, 1977/01
None
*; Miyo, Hiroaki*; Ouchi, Jin; *; *; Akutsu, Shigeru*
PNC TN841 76-53, 19 Pages, 1976/08
(IAEA/NEA Internatisnal symposium on the management of radioactive waster from the nuclear fuel cycle Vienne from 22 to 26 March 1976 *757) A summary is presented concerning the experiene in the management of Pu contaminated wastes at the plutonium fuel facilities of the power reactor and nuclear fuel development corporation (P.N.C). Description are given of waste generation, current handling techniques, Pu measurement techniques and process techniques now under research and development such as incineration system and a closed cycle liquid waste treatment by using decomposition of ammonium nitrate contined in the liquid.
*; Ouchi, Jin; Miyo, Hiroaki*; *; *; *
PNC TN841 76-07, 19 Pages, 1976/02
A summary is presented concerning the experience in themanagement of Pu contaminated wastes at the plutonium fuelfacilities of the Power Reactor and Nuclear Fuel DevelopmentCorporation (PNC). Deseription are given of waste generation,current handling techniques,Pu measurement techniques andprocess techniques now under research and development such asincineration system and a closed cycle liquid waste treatment byusing decomposition of ammonium nitrate contained in the liquid.
*; *; *; *; Miyo, Hiroaki*; *; Ouchi, Jin; *
PNC TN843 75-09, 226 Pages, 1975/08
None