Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Sawabe, Yuki; Ito, Yuichi; Kawase, Masato; Fukuta, Shimpei; Suzuki, Takahiro*; Kikuzawa, Nobuhiro; Ouchi, Nobuo
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.748 - 751, 2014/10
no abstracts in English
Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10
no abstracts in English
Fukuta, Shimpei; Sawabe, Yuki; Suzuki, Takahiro*; Ishiyama, Tatsuya*; Kawase, Masato*; Ito, Yuichi; Kato, Yuko; Yoshii, Akinobu; Kikuzawa, Nobuhiro; Ouchi, Nobuo
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1122 - 1125, 2014/06
The installation of Cs-seeded RF-driven H ion source (RF ion source) to J-PARC LINAC is scheduled in 2014. Similarly the replacement of RFQ III from RFQ is scheduled in 2014. The test stand of the cooperation of RF ion source & RFQ III is being made in the J-PARC LINAC building for the beam acceleration examination now. The J-PARC control group designed test stand control system by thinking that test stand control system had to be equal to J-PARC accelerator control system. Specifically, Introduction of MPS for protect an apparatus. Implementation of EPICS environment for remotely controlling the equipment. It is construction of the timing system for sending a timing signal to each accelerator component device. This report describes construction of the control system in a test stand.
Ito, Yuichi; Kawase, Masato; Kikuzawa, Nobuhiro; Ouchi, Nobuo
Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.738 - 740, 2013/08
A transmutation experimental facility (TEF) is planned in J-PARC 2nd construction phase. 400 MeV/250 kW of negative hydrogen ion beam will be delivered from LINAC to TEF. The LINAC is now operating in repetition of 25 Hz and LINAC should be operated in 50 Hz to keep beam power for existing experimental facilities. The timing system should also be operated in 50 Hz. However, some control subsystems and data acquisition subsystems are strongly optimized for 25 Hz operation especially in RCS. A design for J-PARC timing system to support TEF will be discussed in this report.
Mizumoto, Motoharu; Kusano, Joichi; Hasegawa, Kazuo; Ouchi, Nobuo; Oguri, Hidetomo; Ichihara, Masahiro; Tomisawa, Tetsuo; Ito, Takashi; Chishiro, Etsuji*; Ikegami, Masanori*; et al.
KEK Proceedings 99-25, p.3 - 5, 2000/02
no abstracts in English
Mizumoto, Motoharu; Kusano, Joichi; Hasegawa, Kazuo; Ouchi, Nobuo; Oguri, Hidetomo; Kinsho, Michikazu; Tomisawa, Tetsuo; Ito, Takashi; Chishiro, Etsuji*; Ikegami, Masanori*; et al.
Proc. of Int. Symp. on Environment-conscious Innovative Mater. Processing with Advanced Energy Sources, p.71 - 78, 1998/00
no abstracts in English
; Mizumoto, Motoharu; *; ; *; *; Kusano, Joichi
Journal of Nuclear Science and Technology, 34(7), p.622 - 627, 1997/07
Times Cited Count:10 Percentile:63.12(Nuclear Science & Technology)no abstracts in English
Baba, Mamoru*; *; *; *; *; *
JAERI-M 91-059, 30 Pages, 1991/04
no abstracts in English
Baba, Mamoru*; *; *; *; *
JAERI-M 89-143, 55 Pages, 1989/10
no abstracts in English