Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 79

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Pd nanoparticles on the outer surface of microporous aluminosilicates for the direct alkylation of benzenes using alkanes

Misaki, Satoshi*; Miwa, Hiroko*; Ito, Takashi; Yoshida, Takefumi*; Hasegawa, Shingo*; Nakamura, Yukina*; Tokutake, Shunta*; Takabatake, Moe*; Shimomura, Koichiro*; Chun, W.-J.*; et al.

ACS Catalysis, 13(18), p.12281 - 12287, 2023/09

 Times Cited Count:1 Percentile:46.87(Chemistry, Physical)

Journal Articles

Reducing the effect of noise generated from stepper motor for H0 collimator in J-PARC RCS

Fujiyama, Hiroki*; Takahashi, Hiroki; Okabe, Kota; Ito, Yuichi*; Hatakeyama, Shuichiro; Suzuki, Takahiro*; Otsu, Satoru*; Yamakawa, Ryuto*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.529 - 531, 2023/01

Stepper motors are used for mechanical drive in collimators and wire scanner monitors of J-PARC accelerators. Many of these drive unit hardware have been used since the beginning of J-PARC construction, and it is necessary to take measures against aging deterioration. Therefore, we started updating the motor and control system from around 2017. However, when the stepper motor was updated to the current product in the RCS H0 collimator, a malfunction occurred. This is because the drive unit control system cannot correctly recognize the state of the LS (limit switch) due to the noise generated by the motor driver, which hinders the operation. When the noise generated from the old and new stepper motors was measured in a simple test environment for confirmation, it was found that the current product was clearly larger. As a countermeasure, when the wiring of the stepper motor, which was bundled in a single multi-core cable, was separated into separate cables for the power system and LS signal system, the noise level was reduced to about 1/10 and normal operation was restored. I was able to. In this case, we report on noise countermeasures for the RCS H0 collimator drive unit.

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

Journal Articles

Sodium-cooled Fast Reactors

Ohshima, Hiroyuki; Morishita, Masaki*; Aizawa, Kosuke; Ando, Masanori; Ashida, Takashi; Chikazawa, Yoshitaka; Doda, Norihiro; Enuma, Yasuhiro; Ezure, Toshiki; Fukano, Yoshitaka; et al.

Sodium-cooled Fast Reactors; JSME Series in Thermal and Nuclear Power Generation, Vol.3, 631 Pages, 2022/07

This book is a collection of the past experience of design, construction, and operation of two reactors, the latest knowledge and technology for SFR designs, and the future prospects of SFR development in Japan. It is intended to provide the perspective and the relevant knowledge to enable readers to become more familiar with SFR technology.

Journal Articles

Update of MPS modules for J-PARC linac and RCS, 2

Takahashi, Hiroki; Suzuki, Takahiro*; Ishiyama, Tatsuya*; Ito, Yuichi*

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.914 - 917, 2021/10

In the event of an abnormal situation, a machine protection system (MPS) that immediately inhibits the beam is indispensable to minimize the damage and the radioactivation by beam loss. The existing MPS was developed during the construction period, and there are many MPS modules that have been used from the beginning of J-PARC operation, Therefore, as a measure against aging, we started designing, manufacturing and updating the new MPS module in 2018. In this paper, the specifications and the results of performance test about the newly designed and manufactured the MPS signal aggregation module and the E/O converter module will be described.

Journal Articles

Development of next-generation timing system for the Japan Proton Accelerator Research Complex

Tamura, Fumihiko; Takahashi, Hiroki; Kamikubota, Norihiko*; Ito, Yuichi*; Hayashi, Naoki

IEEE Transactions on Nuclear Science, 68(8), p.2043 - 2050, 2021/08

 Times Cited Count:0 Percentile:0.01(Engineering, Electrical & Electronic)

A precise and stable timing system is necessary for high intensity proton accelerators such as the J-PARC. The existing timing system, which was developed during the construction period of the-PARC, has been working without major issues since 2006. After a decade of operation, the optical modules, which are key components for signal transfer, were discontinued already. Thus, the next-generation timing system for the J-PARC is under development. The new system is designed to be compatible with the existing system in terms of the operating principle. The new system utilizes modern high speed signal communication for the transfer of the clock, trigger, and type code. We present the system configuration of the next-generation timing system and current status.

Journal Articles

Observation of longitudinal magnetic fluctuations at a first-order ferromagnetic quantum phase transition in UGe$$_2$$

Noma, Yuichiro*; Kotegawa, Hisashi*; Kubo, Tetsuro*; To, Hideki*; Harima, Hisatomo*; Haga, Yoshinori; Yamamoto, Etsuji; Onuki, Yoshichika*; Ito, Kohei*; Nakamura, Ai*; et al.

Journal of the Physical Society of Japan, 90(7), p.073707_1 - 073707_5, 2021/07

 Times Cited Count:0 Percentile:0(Physics, Multidisciplinary)

Journal Articles

First isolation and analysis of caesium-bearing microparticles from marine samples in the Pacific coastal area near Fukushima Prefecture

Miura, Hikaru*; Ishimaru, Takashi*; Ito, Yukari*; Kuribara, Yuichi; Otosaka, Shigeyoshi*; Sakaguchi, Aya*; Misumi, Kazuhiro*; Tsumune, Daisuke*; Kubo, Atsushi*; Higaki, Shogo*; et al.

Scientific Reports (Internet), 11, p.5664_1 - 5664_11, 2021/03

 Times Cited Count:13 Percentile:67.27(Multidisciplinary Sciences)

For the first time, we isolated and investigated seven CsMPs (radioactive caesium-bearing microparticles) from marine particulate matter and sediment. From the elemental composition, the $$^{134}$$Cs/$$^{137}$$Cs activity ratio, and the $$^{137}$$Cs activity per unit volume results, we inferred that the five CsMPs collected from particulate matter were emitted from Unit 2 of the FDNPP, whereas the two CsMPs collected from marine sediment were possibly emitted from Unit 3. The presence of CsMPs can cause overestimation of the solid-water distribution coefficient of Cs in marine sediments and particulate matter and a high apparent radiocaesium concentration factor for marine biota. CsMPs emitted from Unit 2, which were collected from the estuary of a river that flowed through a highly contaminated area, may have been deposited on land and then transported by the river. By contrast, CsMPs emitted from Unit 3 were possibly transported eastward by the wind and deposited directly onto the ocean surface.

Journal Articles

Pressure effect on isotope fractionation factor

Sano, Asami; Ito, Shoichi*; Suzumura, Akimasa*; Ueno, Yuichiro*; Yagi, Hikaru*; Inoue, Toru*; Kawazoe, Takaaki*

Koatsuryoku No Kagaku To Gijutsu, 30(2), p.85 - 94, 2020/10

Minerals and rocks exhibit various isotope compositions depending on their origins and histories. In interpreting their isotopic variations, the equilibrium isotope fractionation factor is a key because it depends on the environment parameters such as temperature. Recent studies have shown that the effect of pressure on the isotope fractionation, which was considered negligible compared to temperature, is significant under the conditions of the Earth's interior. In this article we review recent advances in experimental studies to determine the isotope fractionation of iron and hydrogen at high pressure over several GPa, discussing their issues and future perspectives.

Journal Articles

Upgrade of the 3-MeV linac for testing of accelerator components at J-PARC

Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.

Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12

 Times Cited Count:1 Percentile:52.28(Physics, Particles & Fields)

We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.

Journal Articles

A Suitable procedure for preparing of water samples used in radiocarbon intercomparison

Takahashi, Hiroshi*; Minami, Masayo*; Aramaki, Takafumi*; Handa, Hiroko*; Kokubu, Yoko; Ito, Shigeru*; Kumamoto, Yuichiro*

Radiocarbon, 61(6), p.1879 - 1887, 2019/12

 Times Cited Count:2 Percentile:11.66(Geochemistry & Geophysics)

Water sample for interlaboratory comparison (here after "comparison water") must have inalterable $$^{14}$$C concentration during the comparison campaign and inter-batches homogeneity. In this study, the procedure for preparing of comparison water was discussed. We employed that comparison waters were artificially made by mixing chemical reagents, controlling $$^{14}$$C concentration and chemical composition. We could prepare six comparison waters, having 1, 14, 37, 56, 72 and 100 pMC, respectively. The stable carbon isotopic values and chemical compositions of some batches were measured to exanimate the inter- batches homogeneity. The $$^{14}$$C discrepancies among the batches were negligible for the inter-laboratory comparison. Finally, the results of trial comparison in Japan will be presented. Most of $$^{14}$$C results of CO$$_{2}$$ extracted by six laboratories showed good agreements each other.

Journal Articles

Next generation timing system for J-PARC

Tamura, Fumihiko; Takahashi, Hiroki; Kamikubota, Norihiko*; Ito, Yuichi; Hayashi, Naoki

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.149 - 152, 2019/07

Precise timing pulses from the timing system are necessary for acceleration of high intensity proton beams in the J-PARC accelerators. The existing timing system was developed during the construction period of the J-PARC. The system has been working well for more than ten years, however, the optical modules for the signal transfer from the central control building to the accelerators are discontinued already. Although we have spares of the optical devices, maintenance of the system will be difficult. Therefore, we are developing the next generation timing system for the J-PARC. We present the design of the system, preliminary test results, and future plans.

Journal Articles

Anisotropic magnetic fluctuations in ferromagnetic superconductor UGe$$_2$$; $$^{73}$$Ge-NQR study at ambient pressure

Noma, Yuichiro*; Kotegawa, Hisashi*; Kubo, Tetsuro*; To, Hideki*; Harima, Hisatomo*; Haga, Yoshinori; Yamamoto, Etsuji; Onuki, Yoshichika*; Ito, Kohei*; Haller, E. E.*; et al.

Journal of the Physical Society of Japan, 87(3), p.033704_1 - 033704_5, 2018/03

 Times Cited Count:4 Percentile:35.9(Physics, Multidisciplinary)

Journal Articles

Improvement of a timing system in J-PARC Linac/RCS

Sawabe, Yuki*; Takahashi, Hiroki; Ito, Yuichi*; Kawase, Masato*

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1133 - 1136, 2017/12

In the timing system of J-PARC LINAC/RCS, the ring type Reflective Memory (RFM) network is adopted for data transfer. In June 2016, a data transfer failure occurred due to communication error on the RFM network, and it took a long time to recover. From this experience, we have created the environment to monitor of the RFM network status, and we duplicated the computer which manages the data transfer on the RFM network. In Addition, we have also created the syslog function as an environment to monitor each RFM even if data transfer failure occurs on the RFM network. After these improvements, a trouble occurred in the timing system VME. At the same time, the target device was immediately identified by these functions, and the timing system could be recovered quickly. In this paper, the details of improvement for stable operation in the timing system of J-PARC LINAC / RCS are presented.

Journal Articles

Stabilization of timing system operation of J-PARC Linac and RCS

Takahashi, Hiroki; Hayashi, Naoki; Ito, Yuichi*; Kawase, Masato*; Sawabe, Yuki*

Proceedings of 8th International Particle Accelerator Conference (IPAC '17) (Internet), p.4000 - 4002, 2017/06

The timing system data (delay value, status, etc.) of J-PARC Linac and rapid cycling synchrotron is managed by a computer. After updating this hardware, we encountered the problem of data corruption in the timing system. Therefore, we added a function to the software for the timing system VME and investigated the cause of the problem. The investigation results showed a problem with the network connected PCI-Express reflective memory. We implemented measures for stabilizing the timing system operation based on this result.

Journal Articles

Development of timing system for RF ion source & RFQ III test stand

Sawabe, Yuki; Ito, Yuichi; Kawase, Masato; Fukuta, Shimpei; Suzuki, Takahiro*; Kikuzawa, Nobuhiro; Ouchi, Nobuo

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.748 - 751, 2014/10

no abstracts in English

Journal Articles

Present status of J-PARC linac

Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10

no abstracts in English

Journal Articles

Construction of control system for J-PARC RF ion source & RFQ III test stand

Fukuta, Shimpei; Sawabe, Yuki; Suzuki, Takahiro*; Ishiyama, Tatsuya*; Kawase, Masato*; Ito, Yuichi; Kato, Yuko; Yoshii, Akinobu; Kikuzawa, Nobuhiro; Ouchi, Nobuo

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1122 - 1125, 2014/06

The installation of Cs-seeded RF-driven H$$^{-}$$ ion source (RF ion source) to J-PARC LINAC is scheduled in 2014. Similarly the replacement of RFQ III from RFQ is scheduled in 2014. The test stand of the cooperation of RF ion source & RFQ III is being made in the J-PARC LINAC building for the beam acceleration examination now. The J-PARC control group designed test stand control system by thinking that test stand control system had to be equal to J-PARC accelerator control system. Specifically, Introduction of MPS for protect an apparatus. Implementation of EPICS environment for remotely controlling the equipment. It is construction of the timing system for sending a timing signal to each accelerator component device. This report describes construction of the control system in a test stand.

Journal Articles

Upgrade of power supply system for RF-chopper at J-PARC Linac

Futatsukawa, Kenta*; Ikegami, Masanori*; Ito, Yuichi; Kikuzawa, Nobuhiro; Sato, Fumiaki; Shinozaki, Shinichi; Suzuki, Takahiro*; Chishiro, Etsuji; Hirano, Koichiro; Fang, Z.*; et al.

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1149 - 1153, 2014/06

no abstracts in English

Journal Articles

Upgrade of control signal distribution system at J-PARC Linac

Futatsukawa, Kenta*; Ito, Yuichi; Kikuzawa, Nobuhiro; Kobayashi, Tetsuya*; Sato, Fumiaki; Shinozaki, Shinichi; Suzuki, Takahiro*; Fang, Z.*; Fukui, Yuji*; Michizono, Shinichiro*

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1126 - 1129, 2014/06

no abstracts in English

79 (Records 1-20 displayed on this page)