Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Watanabe, Tamaki*; Toyama, Takeshi*; Hanamura, Kotoku*; Imao, Hiroshi*; Kamigaito, Osamu*; Kamoshida, Atsushi*; Kawachi, Toshihiko*; Koyama, Ryo*; Sakamoto, Naruhiko*; Fukunishi, Nobuhisa*; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1105 - 1108, 2019/07
Upgrades for the RIKEN heavy-ion linac (RILAC) involving a new superconducting linac (SRILAC) are currently underway at the RIKEN radioactive isotope beam factory (RIBF). It is crucially important to develop nondestructive beam measurement diagnostics. We have developed a beam energy position monitor (BEPM) system which can measure not only the beam position but also the beam energy simultaneously by measuring the time of flight of the beam. We fabricated 11 BEPMs and completed the position calibration to obtain the sensitivity and offset for each BEPMs. The position accuracy has been achieved to be less than 0.1 mm by using the mapping measurement.
Hatakeyama, Shuichiro; Hayashi, Naoki; Arakawa, Dai*; Hashimoto, Yoshinori*; Hiramatsu, Shigenori*; Odagiri, Junichi*; Sato, Kenichiro*; Tejima, Masaki*; Tobiyama, Makoto*; Toyama, Takeshi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2698 - 2700, 2010/05
The Data Acquisition System of Beam Position Monitors (BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Circuits (BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.
Tejima, Masaki*; Arakawa, Dai*; Hashimoto, Yoshinori*; Sato, Kenichiro*; Toyama, Takeshi*; Yamamoto, Noboru*; Hayashi, Naoki; Hanamura, Kotoku*
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.978 - 980, 2010/05
To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.
Toyama, Takeshi*; Arakawa, Dai*; Hiramatsu, Shigenori*; Igarashi, Susumu*; Lee, S.*; Matsumoto, Hiroshi*; Odagiri, Junichi*; Tejima, Masaki*; Tobiyama, Makoto*; Hashimoto, Yoshinori*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.981 - 983, 2010/05
Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (30 micrometers with 1 sec averaging), (3) beam based alignment.
Tsutsui, Kenji; Toyama, Atsushi*; Toyama, Takami*; Maekawa, Sadamichi*
Journal of Physics and Chemistry of Solids, 69(12), p.3365 - 3368, 2008/12
Times Cited Count:0 Percentile:0(Chemistry, Multidisciplinary)Substitution of impurities Zn and Ni for Cu in high- superconductors has attracted much attention. The recent neutron scattering experiment show that Ni doping traps holes in the vicinity of Ni sites. We theoretically examine the electronic state with impurity based on the model where impurity Zn and Ni 3 orbitals are explicitly treated. We carry out the numerically exact diagonalization method on small cluster. We find the region where a hole is trapped in the Ni site so that the effective hole concentration decreases and the ground state has strong antiferromagnetic correlations, as indicated from the experimental study.