Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Assessment of probability of aircraft crashes for Nuclear Science Research Institute

Kamikawa, Yutaka; Suzuki, Makoto; Agake, Toshiki; Murakami, Takahiko; Morita, Yusuke; Shiina, Hidenori; Fukushima, Manabu; Hirane, Nobuhiko; Ouchi, Yasuhiro

JAEA-Technology 2023-030, 57 Pages, 2024/03

JAEA-Technology-2023-030.pdf:1.93MB

Owing to the publication of the latest data about aircraft crashes by Nuclear Regulation Authority (NRA), it was necessary to re-evaluate the probabilities of aircraft crashes for Nuclear Science Research Institute (NSRI). By using of the assessment method provided in "Regulatory Guide of the Assessment Standard for Probability of Airplane Crash on a Nuclear Power Reactor Facility", we re-evaluated the probabilities of aircraft crashes against the nuclear facilities in NSRI. As a result of the evaluations, the sum of the probabilities of aircraft crashes against Waste Treatment Facilities (maximum probability among all nuclear facilities in NSRI) is 5.68$$times$$10$$^{-8}$$ (times/(reactor $$cdot$$ year)) which is lower than 10$$^{-7}$$ (times/(reactor $$cdot$$ year)) that is the assessment criterion whether aircraft crashes is considered to be "anticipated external human induced events" in design basis or not.

JAEA Reports

Overhaul of the Primary cooling system heat exchanger in JRR-3

Uno, Yuki; Ouchi, Yasuhiro; Ouchi, Satoshi; Baba, Ryota; Kikuchi, Masanobu; Kawamata, Satoshi

JAEA-Technology 2021-046, 39 Pages, 2023/02

JAEA-Technology-2021-046.pdf:3.76MB

JRR-3 (Japan Research Reactor No.3) is a light water research reactor cooling pool type light water deceleration of low-enriched uranium up to 20MW thermal power. November 1990, begin to operation in modified that we are provided to users as a high neutron flux form reactor facility in various types of irradiation facilities and neutron beam experiment equipment. Currently, JRR-3 has completed the period of facility inspections, which had been extended due to the effects of the Great East Japan Earthquake of March 11, 2011, and has been able to conformity to the New Regulatory Requirements. It has also resumed operation for the first time in about 10 years. FY 2017, overhauled the primary cooling heat exchanger No.1 and No.2 based on a maintenance plan. This is report for take advantage what inspection and maintenance of future about overhaul of the primary cooling system heat exchanger for collect of inspection records and performance.

JAEA Reports

Maintenance of the pump for the primary cooling system in JRR-3

Ouchi, Yasuhiro; Ito, Masatoshi; Oba, Toshinobu; Kawamata, Satoshi; Ishizaki, Katsuhiko

JAEA-Technology 2009-038, 38 Pages, 2009/07

JAEA-Technology-2009-038.pdf:2.87MB

The primary cooling system of JRR-3 is one of important facility which removes heat from reactor core. Therefore, it is necessary for safe and stable reactor operation to keep performance of four pumps which are main equipments of primary cooling system. These four pumps have been checked and maintained appropriately since the operation of JRR-3 started. Maintenance items and its records of primary cooling pumps are reported in this paper. Furthermore, aging problems of primary cooling pumps is investigated to contribute to management for maintenance of primary cooling pumps.

Oral presentation

Overhaul of the heat exchanger in JRR-3

Ouchi, Yasuhiro; Kawamata, Satoshi; Taguchi, Yuji; Kamiishi, Eigo; Koda, Nobuyuki

no journal, , 

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1