Refine your search:     
Report No.
 - 
Search Results: Records 1-16 displayed on this page of 16
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Development of lithium target system in engineering validation and engineering design activity of the International Fusion Materials Irradiation Facility (IFMIF/EVEDA)

Wakai, Eiichi; Kondo, Hiroo; Sugimoto, Masayoshi; Fukada, Satoshi*; Yagi, Juro*; Ida, Mizuho; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Watanabe, Kazuyoshi; et al.

Purazuma, Kaku Yugo Gakkai-Shi, 88(12), p.691 - 705, 2012/12

AA2012-1008.pdf:2.42MB

no abstracts in English

Journal Articles

IFMIF/EVEDA lithium test loop; Design and fabrication technology of target assembly as a key component

Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Kazuyuki; Ida, Mizuho; Watanabe, Kazuyoshi; Kanemura, Takuji; Wakai, Eiichi; Horiike, Hiroshi*; Yamaoka, Nobuo*; et al.

Nuclear Fusion, 51(12), p.123008_1 - 123008_12, 2011/12

 Times Cited Count:39 Percentile:82.79(Physics, Fluids & Plasmas)

The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.

Journal Articles

Present status of Japanese tasks for lithium target facility under IFMIF/EVEDA

Nakamura, Kazuyuki; Furukawa, Tomohiro; Hirakawa, Yasushi; Kanemura, Takuji; Kondo, Hiroo; Ida, Mizuho; Niitsuma, Shigeto; Otaka, Masahiko; Watanabe, Kazuyoshi; Horiike, Hiroshi*; et al.

Fusion Engineering and Design, 86(9-11), p.2491 - 2494, 2011/10

 Times Cited Count:10 Percentile:60.68(Nuclear Science & Technology)

In IFMIF/EVEDA, tasks for lithium target system are shared to 5 validation tasks (LF1-5) and a design task (LF6). The purpose of LF1 task is to construct and operate the EVEDA lithium test loop, and JAEA has a main responsibility to the performance of the Li test loop. LF2 is a task for the diagnostics of the Li test loop and IFMIF design. Basic research for the diagnostics equipment has been completed, and the construction for the Li test loop will be finished before March in 2011. LF4 is a task for the purification systems with nitrogen and hydrogen. Basic research for the purification equipment has been completed, and the construction of the nitrogen system for the Li test loop will be finished before March in 2011. LF5 is a task for the remote handling system with the target assembly. JAEA has an idea to use the laser beam for cutting and welding of the lip part of the flanges. LF6 is a task for the design of the IFMIF based on the validation experiments of LF1-5.

Journal Articles

Target system of IFMIF-EVEDA in Japanese activities

Ida, Mizuho; Fukada, Satoshi*; Furukawa, Tomohiro; Hirakawa, Yasushi; Horiike, Hiroshi*; Kanemura, Takuji*; Kondo, Hiroo; Miyashita, Makoto; Nakamura, Hiroo; Sugiura, Hirokazu*; et al.

Journal of Nuclear Materials, 417(1-3), p.1294 - 1298, 2011/10

 Times Cited Count:4 Percentile:32.48(Materials Science, Multidisciplinary)

Engineering Validation and Engineering Design Activities (EVEDA) of the International Fusion Materials Irradiation Facility (IFMIF) was started. As a Japanese activity for the target system, EVEDA Lithium Test Loop simulating hydraulic and impurity conditions of IFMIF is under design and preparation for fabrication. Feasibility of thermo-mechanical structure of the target assembly and the replaceable back-plate made of F82H (a RAFM) and 316L (a stainless steel) is a key issue. Toward final validation on the EVEDA loop, diagnostics applicable to a high-speed free-surface Li flow and hot traps to control nitrogen and hydrogen in Li are under tests. For remote handling of target assemblies and the replaceable back-plates activated up to 50 dpa/y, lip weld on 316L-316L by laser and dissimilar weld on F82H-316L are under investigation. As engineering design of the IFMIF target system, water experiments and hydraulic/thermo-mechanical analyses of the back-plate are going.

Journal Articles

Design and construction of IFMIF/EVEDA lithium test loop

Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Ida, Mizuho; Matsushita, Izuru*; Horiike, Hiroshi*; Kanemura, Takuji; Sugiura, Hirokazu*; Yagi, Juro*; Suzuki, Akihiro*; et al.

Journal of Engineering for Gas Turbines and Power, 133(5), p.052910_1 - 052910_6, 2010/12

 Times Cited Count:7 Percentile:38.67(Engineering, Mechanical)

As a major Japanese activity for the IFMIF/EVEDA, EVEDA Li Test Loop (ELTL) to simulate hydraulic and impurity conditions of IFMIF is under design and preparation for fabrication. Feasibility of hydraulic stability of the liquid Li target and the purification systems of hot traps are major key issues to be validated. This paper presents the current status of the design and construction of the EVEDA Li Test Loop. Detail designs of the loop components such as the target assembly, tanks, an electro-magnetic pump and flow meter and a cold trap for purification system are described in addition to the flow diagnostics system and the hot traps.

Journal Articles

Engineering design and construction of IFMIF/EVEDA lithium test loop; Design and fabrication of integrated target assembly

Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Hiroo*; Ida, Mizuho; Watanabe, Kazuyoshi; Miyashita, Makoto*; Horiike, Hiroshi*; Yamaoka, Nobuo*; Kanemura, Takuji; et al.

Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 8 Pages, 2010/10

The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.

Journal Articles

Current status of design and construction of IFMIF/EVEDA lithium test loop

Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Matsushita, Izuru*; Ida, Mizuho; Horiike, Hiroshi*; Kanemura, Takuji; Sugiura, Hirokazu*; Yagi, Juro*; Suzuki, Akihiro*; et al.

Proceedings of 18th International Conference on Nuclear Engineering (ICONE-18) (CD-ROM), 9 Pages, 2010/05

IFMIF is a neutron source aimed at producing an intense high energy neutron flux for testing candidate fusion reactor materials. Under Broader Approach activities, Engineering Validation and Engineering Design Activities (EVEDA) of IFMIF started on July 2007. Regarding to the lithium (Li) target facility, design and construction of EVEDA Li Test Loop is a major activity and is in progress. The detail design was started at the early 2009. Fabrication of the loop was started at middle of 2009, and completion is planned at the end of Feb. 2011.

Journal Articles

Status of engineering design of liquid lithium target in IFMIF-EVEDA

Nakamura, Hiroo; Agostini, P.*; Ara, Kuniaki; Fukada, Satoshi*; Furuya, Kazuyuki*; Garin, P.*; Gessii, A.*; Giusti, D.*; Groeschel, F.*; Horiike, Hiroshi*; et al.

Fusion Engineering and Design, 84(2-6), p.252 - 258, 2009/06

 Times Cited Count:25 Percentile:83.13(Nuclear Science & Technology)

Journal Articles

Latest design of liquid lithium target in IFMIF

Nakamura, Hiroo; Agostini, P.*; Ara, Kuniaki; Cevolani, S.*; Chida, Teruo*; Ciotti, M.*; Fukada, Satoshi*; Furuya, Kazuyuki*; Garin, P.*; Gessii, A.*; et al.

Fusion Engineering and Design, 83(7-9), p.1007 - 1014, 2008/12

 Times Cited Count:19 Percentile:75.95(Nuclear Science & Technology)

This paper describes the latest design of liquid lithium target system in IFMIF. Design requirement of the Li target is to provide a stable Li jet with a speed of 20 m/s to handle an averaged heat flux of 1 GW/m$$^{2}$$. A double reducer nozzle and a concaved flow are applied to the target design. On Li purification, a cold trap and two kinds of hot trap are applied to control impurities below permissible levels. Nitrogen concentration shall be controlled below 10 wppm by one of the hot trap. Tritium concentration shall be controlled below 1 wppm by an yttrium hot trap. To maintain reliable continuous operation, various diagnostics are attached to the target assembly. Among the target assembly, a back-plate made of RAFM is located in the most severe region of neutron irradiation (50 dpa/y). Therefore, two design options of replaceable back wall and their remote handling systems are under investigation.

Journal Articles

Study on dosimetry of bremsstrahlung radiation processing

Sunaga, Hiromi; Tachibana, Hiroyuki; Tanaka, Ryuichi; Okamoto, Jiro; *; Saito, Toshio*

Radiation Physics and Chemistry, 42(4-6), p.749 - 752, 1993/00

 Times Cited Count:3 Percentile:38.07(Chemistry, Physical)

no abstracts in English

Oral presentation

Status of IFMIF target system development

Nakamura, Hiroo; Ida, Mizuho; Miyashita, Makoto; Yoshida, Eiichi; Ara, Kuniaki; Nishitani, Takeo; Okumura, Yoshikazu; Horiike, Hiroshi*; Kondo, Hiroo*; Terai, Takayuki*; et al.

no journal, , 

no abstracts in English

Oral presentation

Present status of Japanese tasks on IFMIF/EVEDA Li target system

Nakamura, Kazuyuki; Ida, Mizuho; Kondo, Hiroo; Watanabe, Kazuyoshi; Furukawa, Tomohiro; Hirakawa, Yasushi; Horiike, Hiroshi*; Fukada, Satoshi*; Terai, Takayuki*; Tsuji, Yoshiyuki*; et al.

no journal, , 

IFMIF/EVEDA started at July in 2007. Li Target System consists of five validation tasks (LF1-5) and one design task (LF6). Present status of Li Test Loop Construction and Operation task (LF1) is to complete the fabrication and installation of the almost key components except Target Assembly and Two types of traps for nitrogen and hydrogen, and to continue the connection with the components by the pipes. In the Diagnostics task (LF2), the characterization of the contact probe level meter is on going in Osaka University. In the Purification System task (LF4), the characterization of the Fe-Ti gettering material in Tokyo University and of Y gettering material in Kyushu University is on going. In the Remote Handling task (LF5), the design of the experimental facility has been finished. In the Engineering Design task (LF6), the engineering design for the IFMIF will be completed based on the validation tasks (LF1-5).

Oral presentation

Progress on engineering design and construction of IFMIF/EVEDA Li test loop

Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Iuchi, Hiroshi; Nakamura, Kazuyuki; Ida, Mizuho; Wakai, Eiichi; Watanabe, Kazuyoshi; Kanemura, Takuji; Horiike, Hiroshi*; et al.

no journal, , 

The International Fusion Materials Irradiation Facility (IFMIF) is a neutron source aimed at producing an intense high energy neutron flux for testing candidate materials to be used in the fusion demonstration reactor. Engineering Validation and Engineering Design Activities (EVEDA) on IFMIF started under Broader Approach. As a major Japanese activity for Li target tasks of EVEDA, EVEDA Li Test Loop is under construction. Feasibility of hydraulic stability of the Li target and purification systems of hot traps is major key issues to be validated. Toward the validation at the loop, laboratory-scale tests and design for diagnostics to the high-speed free-surface Li target and the hot traps to control nitrogen and hydrogen in Li are carried out along with the construction of the loop. Regarding to progress of the construction, all major components except a target assembly are installed in a mount of the loop. The construction is scheduled to be finished on Feb. 2011.

Oral presentation

Present status of Japanese tasks for lithium target facility under IFMIF/EVEDA

Nakamura, Kazuyuki; Ida, Mizuho; Kanemura, Takuji; Kondo, Hiroo; Niitsuma, Shigeto; Hirakawa, Yasushi; Furukawa, Tomohiro; Watanabe, Kazuyoshi; Horiike, Hiroshi; Terai, Takayuki*; et al.

no journal, , 

Three and half years has been passed from the start of IFMIF/EVEDA. In IFMIF/EVEDA, tasks for Lithium Target System consists of 5 validation tasks (LF1-5) and a design task (ED3), and are shared by Japan and Europe. Japan is covering the construction and operation of EVEDA Li Test Loop (LF1), diagnostics (LF2), purification system (LF4), remote handling system (LF5) and engineering design (ED3) with the contribution from universities. The present status of these tasks will be reported in the conference.

Oral presentation

Present status of Japanese tasks for lithium target facility under IFMIF/EVEDA, 1; Outline of activities

Nakamura, Kazuyuki; Ida, Mizuho; Kanemura, Takuji; Kondo, Hiroo; Niitsuma, Shigeto; Hirakawa, Yasushi; Furukawa, Tomohiro; Watanabe, Kazuyoshi; Horiike, Hiroshi*; Terai, Takayuki*; et al.

no journal, , 

I will present the outline and the status of the Japanese tasks for the Li Target system, which is ongoing now under the International Fusion Material Irradiation Facility (IFMIF)/Engineering Validation and Engineering Design Activities (EVEDA). The latest progresses are a completion of the EVEDA Li Loop, a fablication of the remote handling equipment and a repair from the damages caused by the earthquake.

Oral presentation

R&D of lithium target and test facilities for the fusion neutron source

Wakai, Eiichi; Kondo, Hiroo; Kanemura, Takuji; Hirakawa, Yasushi; Furukawa, Tomohiro; Kikuchi, Takayuki; Ito, Yuzuru*; Hoashi, Eiji*; Yoshihashi, Sachiko*; Horiike, Hiroshi*; et al.

no journal, , 

no abstracts in English

16 (Records 1-16 displayed on this page)
  • 1