Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nakashima, Koichi*; Hironaka, Kota*; Ouchi, Kazuma*; Ajioka, Mao*; Kobayashi, Yoshio*; Yoneda, Yasuhiro; Yin, S.*; Kakihana, Masato*; Sekino, Toru*
ACS Omega (Internet), 6(48), p.32517 - 32527, 2021/12
Times Cited Count:5 Percentile:36.83(Chemistry, Multidisciplinary)The BaTiO nanoparticles synthesized by the hydrothermal method is examined by synchrotron X-ray and TEM observation. It was found that the particle size of synthesized BaTiO depends on the particle size of the raw material of TiO. Succeeded in synthesizing 100 nm size BaTiO nanocrystals showing uniform particle size distribution using TiO nanoparticles with optimized particle size. The obtained BaTiO nanocrystal is a tetragonal system of ferroelectric phase. A three-dimensional structure of BaTiO nanoparticles could be obtained by the electron beam tomography.
Nakashima, Koichi*; Onagi, Kaito*; Kobayashi, Yoshio*; Ishigaki, Toru*; Ishikawa, Yoshihisa*; Yoneda, Yasuhiro; Yin, S.*; Kakihana, Masato*; Sekino, Toru*
ACS Omega (Internet), 6(14), p.9410 - 9425, 2021/04
Times Cited Count:9 Percentile:58.45(Chemistry, Multidisciplinary)We succeeded in synthesizing barium titanate nanocubes by hydrothermal synthesis. When the nanocubes were examined in detail using a scanning electron microscope, pulsed neutrons, and large synchrotron radiation, it was found that a reconstituted layer of titanium oxide was formed on the surface.
Hasegawa, Kazuo; Morishita, Takatoshi; Kondo, Yasuhiro; Oguri, Hidetomo; Kobayashi, Tetsuya; Naito, Fujio*; Yoshioka, Masakazu*; Matsumoto, Hiroshi*; Kawamata, Hiroshi*; Hori, Yoichiro*; et al.
Proceedings of 6th Annual Meeting of Particle Accelerator Society of Japan (CD-ROM), p.693 - 695, 2010/03
The J-PARC RFQ (length 3.1m, 4-vane type, 324 MHz) accelerates a beam from the ion source to the DTL. The beam test of the linac was started in November 2006 and 181 MeV beam was successfully accelerated in January 2007. Since then, the linac has been delivered beams for commissioning of the linac itself, downstream accelerators and facilities. Trip rates of the RFQ, however, suddenly increased in Autumn 2008, and we are suffering from this issue for user run operation. We tried to recover by tender conditioning, modification of RF control, improvement of vacuum and so on. We manage to have beam operation. In this report, we describe the status of the RFQ.
Ogiwara, Norio; Suganuma, Kazuaki; Miyo, Yasuhiko; Kobayashi, Shinichi*; Saito, Yoshio*
Applied Surface Science, 146(1-4), p.234 - 238, 1999/00
Times Cited Count:7 Percentile:42.16(Chemistry, Physical)no abstracts in English
Kobayashi, Shinichi*; *; *; Saito, Yoshio*; Ogiwara, Norio; R.V.Latham*
Applied Surface Science, 146(1-4), p.148 - 151, 1999/00
Times Cited Count:1 Percentile:8.71(Chemistry, Physical)no abstracts in English