Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.871 - 876, 2023/11
In J-PARC, an ignitron is used for the crowbar device of the klystron power supply to excite the RF acceleration voltage in a Linac cavity. Mercury, that is used in the ignitron, would be prohibition of use in the future due to environmental protection. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3kV, 40kA, and 50us per board. Because a high voltage of 120 kV is applied on each board, we adopted a self-power supply method to supply a electricity for the control system. This method can create the electricity from a high-voltage DCDC converter. We confirmed the operating performance on a 1/2 scale (60 kV, 40 kA) of the voltage in the existing ignitron system (120 kV, 40 kA). We also studied a test circuit in a higher voltage range of more than 90 kV. Our latest result is well promising for an alternative system of ignitron.
Tamura, Fumihiko; Okita, Hidefumi; Hotchi, Hideaki*; Saha, P. K.; Meigo, Shinichiro; Yoshii, Masahito*; Omori, Chihiro*; Yamamoto, Masanobu; Seiya, Kiyomi*; Sugiyama, Yasuyuki*; et al.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.64 - 68, 2023/11
The J-PARC 3GeV synchrotron (RCS) provides high intensity proton beams to the Materials and Life Science Experimental Facility (MLF) and the Main Ring (MR). The harmonic number (h) of the RCS is 2 and the RCS normally accelerates two bunches. For some experiments at the MLF, a single bunch is preferred. In this case, one of the rf bucket is filled with protons and the other is empty. Therefore the beam intensity is halved. If the RCS can accelerate with h=1, the intensity per bunch can be doubled, enabling to provide single bunch beams to the MLF with the maximum intensity. This possibly increases the MR beam power by injecting high intensity single bunches eight times. In this presentation, we report mainly on the consideration of h=1 acceleration in the RCS by longitudinal simulations.
Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.395 - 399, 2023/01
At J-PARC, an ignitron is used for the crowbar device of the klystron power supply for high-frequency acceleration of a linear accelerator. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3 kV, 40 kA, and 50 s per board. For the control power supply to each board module assuming a high voltage of 120 kV, we adopted a self-power supply method that creates a control power supply with a high-voltage DCDC converter from the voltage shared and charged by each board module. It was possible to confirm the operating performance on a 1/2 scale (60 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting twenty oval board modules in series. The output test result will be reported.
Takayanagi, Tomohiro; Ono, Ayato; Fuwa, Yasuhiro; Shinozaki, Shinichi; Horino, Koki*; Ueno, Tomoaki*; Sugita, Moe; Yamamoto, Kazami; Oguri, Hidetomo; Kinsho, Michikazu; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.242 - 246, 2023/01
At J-PARC, semiconductor short pulse power supplies to replace kicker power supplies and semiconductor long pulse power supplies to replace klystron power supply systems are under construction. We have fabricated a 40kV/2kA/1.2s unit power supply that employs a linear transformer drivers (LTD) system for kickers. Currently, we are working on a high voltage insulating cylinder insulator that suppresses corona discharges using only the insulator structure, without using insulating oil. In addition, the MARX system was adopted for klystron power supply system. A main circuit unit for 8kV/60A/830s rectangular pulse output and an 800V/60A correction circuit unit that improves the flat top droop from 10% to 1% were manufactured. Furthermore, a 2.2kV/2.4kW high voltage SiC inverter charger has been fabricated for this MARX power supply. The presentation will report the evaluation results of each test and prospects for semiconductor pulse power supplies.
Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01
The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.
Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Hatakeyama, Shuichiro; Moriya, Katsuhiro; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1 - 5, 2023/01
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Hatakeyama, Nozomi*; Miura, Ryuji*; Miyamoto, Naoto*; Miyamoto, Akira*; Ara, Kuniaki; Shimoyama, Kazuhito; Kato, Atsushi; Yamamoto, Tomohiko
Journal of Computer Chemistry, Japan, 21(2), p.61 - 62, 2022/00
no abstracts in English
Kato, Chiaki; Yamagishi, Isao; Sato, Tomonori; Yamamoto, Masahiro*
Zairyo To Kankyo, 70(12), p.441 - 447, 2021/12
Zeolite particles have been used in a Cs adsorption vessel for purification of contaminated water in Fukushima Dai-ich Nuclear Power Station (1F). The used Cs adsorption vessels were kept in storage space on 1F site. The risk of localized corrosion of stainless steel used in the vessel was worried. To evaluate the risk of localized corrosion, using specially designed electrochemical testing apparatus was used under gamma-ray irradiation test. And, real size mock-up test conducted. The results showed the potential change caused by creation of HO by water radiolysis decreased by zeolite particles and the enrichment of chloride ion concentration in the vessel do not propagate during dry up procedure of Cs adsorption vessel. These data indicate the risk of localized corrosion of Cs adsorption vessel may stay at considerably low level.
Ishitsuka, Etsuo; Mitsui, Wataru*; Yamamoto, Yudai*; Nakagawa, Kyoichi*; Ho, H. Q.; Ishii, Toshiaki; Hamamoto, Shimpei; Nagasumi, Satoru; Takamatsu, Kuniyoshi; Kenzhina, I.*; et al.
JAEA-Technology 2021-016, 16 Pages, 2021/09
As a summer holiday practical training 2020, the feasibility study for nuclear design of a nuclear battery using HTTR core was carried out, and the downsizing of reactor core were studied by the MVP-BURN. As a result, it is clear that a 1.6 m radius reactor core, containing 54 (183 layers) fuel blocks with 20% enrichment of U, and BeO neutron reflector, could operate continuously for 30 years with thermal power of 5 MW. Number of fuel blocks of this compact core is 36% of the HTTR core. As a next step, the further downsizing of core by changing materials of the fuel block will be studied.
Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki
EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07
The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.6310 variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.0810. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
JPS Conference Proceedings (Internet), 33, p.011018_1 - 011018_6, 2021/03
no abstracts in English
Tamura, Fumihiko; Yamamoto, Masanobu; Yoshii, Masahito*; Sugiyama, Yasuyuki*; Hotchi, Hideaki; Saha, P. K.; Yoshimoto, Masahiro; Harada, Hiroyuki
JPS Conference Proceedings (Internet), 33, p.011021_1 - 011021_6, 2021/03
Chopped beam injection is employed in the J-PARC RCS to avoid the longitudinal beam losses. A fast beam chopper is installed in the MEBT section of the linac. The chopper is driven by the gate pulses sent from the LLRF control system of the RCS. The delay from the zero crossing of the RCS rf and the width are set so that the beam pulse is injected into the proper phase position of the rf bucket. A unique feature of the J-PARC chopper gate pulse generation is thinning of the pulses. The thinning is useful to control the beam intensity without changing much the condition of the longitudinal painting. Also, the beam macro pulse can be trimmed down to a single intermediate pulse by setting the parameters. In this poster, we present the overview of the generation of the chopper gate pulse in the LLRF control system and various beam commissioning results utilizing the flexibility of it. Also, we discuss the upgrade of the chopper gate pulse generation.
Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Takagi, Yasuhiko*; Nakamura, Tomoki*; Hiroi, Takahiro*; Matsuoka, Moe*; et al.
Nature Astronomy (Internet), 5(3), p.246 - 250, 2021/03
Times Cited Count:43 Percentile:96.93(Astronomy & Astrophysics)Here we report observations of Ryugu's subsurface material by the Near-Infrared Spectrometer (NIRS3) on the Hayabusa2 spacecraft. Reflectance spectra of excavated material exhibit a hydroxyl (OH) absorption feature that is slightly stronger and peak-shifted compared with that observed for the surface, indicating that space weathering and/or radiative heating have caused subtle spectral changes in the uppermost surface. However, the strength and shape of the OH feature still suggests that the subsurface material experienced heating above 300 C, similar to the surface. In contrast, thermophysical modeling indicates that radiative heating does not increase the temperature above 200 C at the estimated excavation depth of 1 m, even if the semimajor axis is reduced to 0.344 au. This supports the hypothesis that primary thermal alteration occurred due to radiogenic and/or impact heating on Ryugu's parent body.
Sato, Shin*; Ono, Hirokazu; Tanai, Kenji; Yamamoto, Shuichi*; Fukaya, Masaaki*; Shimura, Tomoyuki*; Niunoya, Sumio*
Jiban Kogaku Janaru (Internet), 15(3), p.529 - 541, 2020/09
no abstracts in English
Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Yoshimoto, Masahiro; et al.
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.209 - 213, 2020/09
The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, just before the summer shutdown period, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. First trial was 1-hour continuous operation in July 2018, and second trial was 10-hours continuous in July 2019. In both cases, we achieved almost stable operation. Furthermore, in June 2020, we tried to operate continuously for over 40 hours. But in this case, some trouble occurred and the operation was frequently suspended. Through these continuous operation trials, we have identified issues for stable operation of 1 MW. In this presentation, we will report the results of 1-MW continuous operation and issues obtained from these results.
Saha, P. K.; Yoshimoto, Masahiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Harada, Hiroyuki; Tamura, Fumihiko; Yamamoto, Kazami; Yamazaki, Yoshio; Kinsho, Michikazu; Irie, Yoshiro*
Physical Review Accelerators and Beams (Internet), 23(8), p.082801_1 - 082801_13, 2020/08
Times Cited Count:4 Percentile:45.12(Physics, Nuclear)Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
Journal of Instrumentation (Internet), 15(7), p.P07022_1 - P07022_16, 2020/07
Times Cited Count:3 Percentile:21.33(Instruments & Instrumentation)no abstracts in English
Miura, Hikaru*; Kuribara, Yuichi; Yamamoto, Masayoshi*; Sakaguchi, Aya*; Yamaguchi, Noriko*; Sekizawa, Oki*; Nitta, Kiyofumi*; Higaki, Shogo*; Tsumune, Daisuke*; Itai, Takaaki*; et al.
Scientific Reports (Internet), 10, p.11421_1 - 11421_9, 2020/07
Times Cited Count:18 Percentile:68.95(Multidisciplinary Sciences)Metoki, Naoto; Aczel, A. A.*; Aoki, Dai*; Chi, S.*; Fernandez-Baca, J. A.*; Griveau, J.-C.*; Hagihara, Masato*; Hong, T.*; Haga, Yoshinori; Ikeuchi, Kazuhiko*; et al.
JPS Conference Proceedings (Internet), 30, p.011123_1 - 011123_6, 2020/03
Rare earths (4) and actinides (5) provide variety of interesting states realized with competing interactions between the increasing number of electrons. Since crystal field splitting of many-body electron system is smaller than the bandwidth, (1) high resolution experiments are needed, (2) essentially no clear spectrum with well defined peaks is expected in itinerant Ce and U compounds, and (3) Np and Pu is strictly regulated. Therefore, systematic research on magnetic excitations by neutron scattering experiments of localized compounds and rare earth iso-structural reference is useful. We describe the electron states of heavy electron compounds NpPdAl and actinide and rare earth based iso-structural family.