Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 29

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Beam commissioning of the linac for iBNCT

Naito, Fujio*; Anami, Shozo*; Ikegami, Kiyoshi*; Uota, Masahiko*; Ouchi, Toshikatsu*; Onishi, Takahiro*; Oba, Toshiyuki*; Obina, Takashi*; Kawamura, Masato*; Kumada, Hiroaki*; et al.

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1244 - 1246, 2016/11

The proton linac installed in the Ibaraki Neutron Medical Research Center is used for production of the intense neutron flux for the Boron Neutron Capture Therapy (BNCT). The linac consists of the 3-MeV RFQ and the 8-MeV DTL. Design average beam current is 10mA. Target is made of Beryllium. First neutron production from the Beryllium target was observed at the end of 2015 with the low intensity beam as a demonstration. After the observation of neutron production, a lot of improvement s was carried out in order to increase the proton beam intensity for the real beam commissioning. The beam commissioning has been started on May 2016. The status of the commissioning is summarized in this report.

Journal Articles

Present status of J-PARC linac

Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10

no abstracts in English

Journal Articles

Improvement of J-PARC klystron high voltage power supply

Chishiro, Etsuji; Kawamura, Masato*; Sagawa, Ryu*; Ogawa, Shinichi*

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1091 - 1093, 2014/10

In J-PARC linac, six units of high voltage power supplies for 324 MHz klystrons have operated since 2006, and those running time exceed 35,000 hours. In addition, six units of power supplies for the 972 MHz klystrons have been operation since 2013. In the power supply, various troubles occur under the operation. In some anode modulators, arc discharge in the transformer oil had occurred due to the deterioration of the auxiliary solid insulator. In three modules combining a step-up transformer and a rectifier, the high voltage diode was breakdown because an unexpected overvoltage was applied. And by improving the voltage dividing resistor of the module, high stability cathode voltage was achieved. In this report, we describe the trouble and the improvement that occurred in the equipment.

Journal Articles

Present status of klystron power supply systems for J-PARC linac 2013

Kawamura, Masato*; Chishiro, Etsuji; Hori, Toshihiko; Shinozaki, Shinichi; Sato, Fumiaki; Fukui, Yuji*; Futatsukawa, Kenta*; Yamazaki, Masayoshi*; Sagawa, Ryu*; Miyajima, Noriyuki*; et al.

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.605 - 607, 2014/06

This report describes the present status of the klystron power supply systems for the J-PARC linac. The systems for the 181 MeV linac were operated from September to May. A few breakdowns were occurred, and are described in this report. The new systems for the upgrade of the linac from 181MeV to 400 MeV have been installed until now, and the 3 HVDCPSs and the 3 anode modulators of the new systems have been operated. All the systems for 400 MeV linac will be operated in this autumn.

Journal Articles

Discharge suppression for anode modulator in J-PARC linac

Chishiro, Etsuji; Kawamura, Masato*; Hori, Toshihiko; Sato, Fumiaki; Shinozaki, Shinichi

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1224 - 1226, 2013/08

no abstracts in English

Journal Articles

High power RF test station for RFQII at J-PARC linac

Hori, Toshihiko; Chishiro, Etsuji; Shinozaki, Shinichi; Sato, Fumiaki; Morishita, Takatoshi; Kondo, Yasuhiro; Futatsukawa, Kenta*; Fukui, Yuji*; Kawamura, Masato*; Sugimura, Takashi*; et al.

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1240 - 1242, 2013/08

no abstracts in English

Journal Articles

Status of J-PARC linac LLRF after the Tohoku Earthquake

Futatsukawa, Kenta*; Anami, Shozo*; Kobayashi, Tetsuya*; Fang, Z.*; Fukui, Yuji*; Michizono, Shinichiro*; Kawamura, Masato*; Sato, Fumiaki; Shinozaki, Shinichi; Chishiro, Etsuji; et al.

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.769 - 773, 2013/08

no abstracts in English

Journal Articles

RF control system for the RFQ test station at J-PARC linac

Fukui, Yuji*; Kawamura, Masato*; Kobayashi, Tetsuya*; Fang, Z.*; Futatsukawa, Kenta*; Sato, Fumiaki; Shinozaki, Shinichi; Suzuki, Hiroyuki; Chishiro, Etsuji; Hori, Toshihiko; et al.

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.762 - 764, 2013/08

no abstracts in English

Journal Articles

Present status of klystron power supply systems for J-PARC linac 2012; Recovery from Earthquake Disaster, HVDCPS breakdown and energy upgrade

Kawamura, Masato*; Chishiro, Etsuji; Hori, Toshihiko; Shinozaki, Shinichi; Sato, Fumiaki; Fukui, Yuji*; Futatsukawa, Kenta*; Yamazaki, Masayoshi*; Sagawa, Ryu*; Yukitake, Mitsuteru*; et al.

Proceedings of 9th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1243 - 1247, 2013/08

no abstracts in English

Journal Articles

Present status of RF source in J-PARC linac; Recovery from earthquake disaster and energy upgrade

Kawamura, Masato*; Chishiro, Etsuji; Shinozaki, Shinichi; Fang, Z.*; Fukui, Yuji*; Naito, Fujio*; Yamazaki, Masayoshi*; Tsubota, Naoaki; Futatsukawa, Kenta; Sato, Fumiaki; et al.

Proceedings of 8th Annual Meeting of Particle Accelerator Society of Japan (Internet), 3 Pages, 2011/08

We will report about status of linac 400 MeV upgrade program and northeast Japan earthquake restoration. On March 11, the linac suffered serious damage as consequence of the earthquake, and was shuttled down for long term. Linac RF group restores the facilities and is accomplishing 400 MeV upgrade at the same time.

Journal Articles

Power supply system for klystron in J-PARC linac

Kawamura, Masato*; Fukui, Yuji*; Naito, Fujio*; Chishiro, Etsuji; Yamazaki, Masayoshi*; Suzuki, Hiroyuki*; Shinozaki, Shinichi; Hasegawa, Kazuo

Proceedings of 25th International Linear Accelerator Conference (LINAC 2010) (CD-ROM), p.887 - 889, 2010/09

This paper describes the present status, technical specifications, operating experience, and upgrade plane for the power supply system (PS system) for the klystrons in the J-PARC. The PS systems include both the high voltage DC power supplies (DCPSs), which drives one or four modulating-anode klystron each, and the anode-modulators, one per klystron. Currently, the energy output of the J-PARC linac is 181 MeV, which includes the energy necessary to run twenty 324 MHz klystrons. In 2012, the linac will add twenty-five 972 MHz klystrons and upgrade the energy output to 400 MeV.

Journal Articles

LLRF controller upgrade for the J-PARC 400 MeV linac

Fang, Z.*; Michizono, Shinichiro*; Anami, Shozo*; Yamaguchi, Seiya*; Naito, Fujio*; Fukui, Yuji*; Kawamura, Masato*; Kubota, Chikashi*; Nammo, Kesao*; Kobayashi, Tetsuya; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.1434 - 1436, 2010/05

The output energy of the J-PARC proton linac will be upgraded from 181 to 400 MeV in the next two years by adding high-b acceleration sections. The upgrade of the FPGA-based digital LLRF controller for the 400 MeV linac will be presented in this paper. This new LLRF controller works for both the 324-MHz low-b and 972-MHz high-b sections. Many functions have been added into the LLRF controller, such as (1) working for different RF systems, (2) gradually increasing the feedback gains in the feedback loop instead of fixed ones, (3) automatic chopped beam compensation, (4) automatically switching the beam loading compensation in accordance with different beam operation mode, (5) input RF-frequency tuning to match the RF cavities during RF start-up, and (6) auto-tuning of the RF cavity tuner by detecting the phase curve of the RF cavity during the field decay instead of the phase difference between the cavity input and output signals.

Journal Articles

Operating experience of the J-PARC linac

Hasegawa, Kazuo; Asano, Hiroyuki; Chishiro, Etsuji; Hori, Toshihiko; Ito, Takashi; Kobayashi, Tetsuya; Kondo, Yasuhiro; Namekawa, Yuya; Oguri, Hidetomo; Okoshi, Kiyonori; et al.

Proceedings of 24th International Linear Accelerator Conference (LINAC 2008) (CD-ROM), p.55 - 57, 2009/00

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB$$_{6}$$-driven ion source and 20 units of 324 MHz klystrons. As of June 2008, the operation times are about 3,000 and 6,000 hours for the ion source and the RF source, respectively. The operating experience of the linac is described.

Journal Articles

Present status of RF source operation at J-PARC linac

Yamazaki, Masayoshi; Chishiro, Etsuji; Kobayashi, Tetsuya; Hori, Toshihiko; Suzuki, Hiroyuki; Anami, Shozo*; Kawamura, Masato*; Fukui, Yuji*; Nammo, Kesao*; Fang, Z.*; et al.

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.485 - 487, 2008/00

no abstracts in English

Journal Articles

DATA collection using memory area of PLC touch panel for J-PARC linac RF

Suzuki, Hiroyuki; Chishiro, Etsuji; Kobayashi, Tetsuya; Hori, Toshihiko; Yamazaki, Masayoshi; Anami, Shozo*; Yamaguchi, Seiya*; Kawamura, Masato*; Fukui, Yuji*; Fang, Z.*

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.467 - 469, 2008/00

no abstracts in English

Journal Articles

Performance of J-PARC linac RF system

Kobayashi, Tetsuya; Chishiro, Etsuji; Hori, Toshihiko; Suzuki, Hiroyuki; Yamazaki, Masayoshi; Anami, Shozo*; Fang, Z.*; Fukui, Yuji*; Kawamura, Masato*; Michizono, Shinichiro*; et al.

Proceedings of 2007 Particle Accelerator Conference (PAC '07) (Internet), p.2128 - 2130, 2007/08

High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have supplied the power to the accelerating cavities successfully, and the beam commissioning was started in November 2006. The RF drive and control systems are working well, and required stability is satisfied.

Journal Articles

Confinement of microwave in RF equipment of J-PARC linac

Chishiro, Etsuji; Kobayashi, Tetsuya; Suzuki, Hiroyuki; Yamazaki, Masayoshi; Hori, Toshihiko; Fang, Z.*; Fukui, Yuji*; Kawamura, Masato*; Yamaguchi, Seiya*; Anami, Shozo*

Proceedings of 4th Annual Meeting of Particle Accelerator Society of Japan and 32nd Linear Accelerator Meeting in Japan (CD-ROM), p.519 - 521, 2007/00

High power RF sources have been installed in J-PARC linac building. The RF source is defined as the microwave application equipment by the Radio low, and is needed the charge minister's permission to offer the service. To pass the regulation, we sought the leakage point using a search coil and a bilog antenna, and stopped up the leak by contacting the metal connection completely. The result of measuring the microwave at the J-PARC site boundary, we confirmed the field strength which is less than permissible level.

Journal Articles

Present status of RF source operation at J-PARC LINAC

Yamazaki, Masayoshi; Chishiro, Etsuji; Kobayashi, Tetsuya; Hori, Toshihiko; Suzuki, Hiroyuki; Anami, Shozo*; Kawamura, Masato*; Fukui, Yuji*; Nammo, Kesao*; Fang, Z.*; et al.

Proceedings of 4th Annual Meeting of Particle Accelerator Society of Japan and 32nd Linear Accelerator Meeting in Japan (CD-ROM), p.516 - 518, 2007/00

no abstracts in English

Journal Articles

Performance of J-PARC LINAC RF system

Kobayashi, Tetsuya; Chishiro, Etsuji; Hori, Toshihiko; Suzuki, Hiroyuki; Yamazaki, Masayoshi; Anami, Shozo*; Fang, Z.*; Fukui, Yuji*; Kawamura, Masato*; Michizono, Shinichiro*; et al.

Proceedings of 4th Annual Meeting of Particle Accelerator Society of Japan and 32nd Linear Accelerator Meeting in Japan (CD-ROM), p.510 - 512, 2007/00

High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have supplied the power to the accelerating cavities successfully. The beam commissioning was started in November 2006 then the acceleration to the design energy of 181 MeV was succeeded. The injection to the 3-GeV synchrotron will be started in September 2007. The RF control systems are performing according to the expectation, and the required field stability is satisfied.

Journal Articles

Equipments for EMC in the J-PARC linac

Chishiro, Etsuji; Kobayashi, Tetsuya; Suzuki, Hiroyuki; Yamazaki, Masayoshi; Hori, Toshihiko; Fang, Z.*; Fukui, Yuji*; Kawamura, Masato*; Yamaguchi, Seiya*; Anami, Shozo*

Proceedings of 3rd Annual Meeting of Particle Accelerator Society of Japan and 31st Linear Accelerator Meeting in Japan, p.962 - 964, 2006/00

no abstracts in English

29 (Records 1-20 displayed on this page)