Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Maintenance of manufacturing facility of high pressure gas in HTTR

Sekita, Kenji; Arakaki, Etsushi; Wakabayashi, Hiroshi

JAEA-Technology 2010-036, 42 Pages, 2010/11

JAEA-Technology-2010-036.pdf:2.9MB

The Liquid Nitrogen (LN$$_{2}$$) manufacturing facility in HTTR, is a high-pressure gas manufacturing facility. The facility provides LN$$_{2}$$ to cold charcoal trap (CCT) in primary and secondary helium purification systems, impurities gas trap for gas chromatography mass spectrometer in primary and secondary helium sampling systems. The facility has been performed periodical inspection according to the law and rule, and each inspection item satisfied the judgment value. Thus, it was confirmed that the maintenance of LN$$_{2}$$ manufacturing facility was appropriate. In addition, the effective and efficient LN$$_{2}$$ amount to be consumed was clarified on the basis of the monitoring. Results of the liquid level of the storage tank and the consumption of LN$$_{2}$$ as the reactor was operated or stopped, by considering the filling frequency and amount of the filling of LN$$_{2}$$ to the facility by a tank lorry. This report describes method and result of periodical inspection and equipment management.

JAEA Reports

Handling of HTTR second driver fuel elements in assembling and storage working

Tomimoto, Hiroshi; Kato, Yasushi; Owada, Hiroyuki; Sato, Nao; Shimazaki, Yosuke; Kozawa, Takayuki; Shinohara, Masanori; Hamamoto, Shimpei; Tochio, Daisuke; Nojiri, Naoki; et al.

JAEA-Technology 2009-025, 29 Pages, 2009/06

JAEA-Technology-2009-025.pdf:21.78MB

The first driver fuel of the HTTR (High Temperature Engineering test Reactor) was loaded in 1998 and the HTTR reached first criticality state in the same year. The HTTR has been operated using the first driver fuel for a decade. In Fuel elements assembling, 4770 of fuel rods which consist of 12 kinds of enrichment uranium are loaded into 150 fuel graphite blocks for HTTR second driver fuel elements. Measures of prevention of fuel rod miss loading, are employed in fuel design. Additionally, precaution of fuel handling on assembling are considered. Reception of fuel rods, assembling of fuel elements and storage of second driver fuels in the fresh fuel storage rack in the HTTR were started since June, 2008. Assembling, storage and pre-service inspection were divided into three parts. The second driver fuel assembling was completed in September, 2008. This report describes concerns of fuel handling on assembling and storage work for the HTTR fuel elements.

JAEA Reports

Maintenance of gaseous radwaste treatment system in HTTR

Yamazaki, Kazunori; Kameyama, Yasuhiko; Inoi, Hiroyuki; Arakaki, Etsushi; Shinozaki, Masayuki; Ota, Yukimaru

JAEA-Testing 2008-002, 52 Pages, 2008/03

JAEA-Testing-2008-002.pdf:15.54MB

The High Temperature Engineering Test Reactor (HTTR) has the Gaseous Radwaste Treatment System (GRTS). This system appropriately collects all potentially radioactive gases discharged from the plant. After the gases are decayed with the Decay tank and decreased with the Filtering system, the gases are discharged into the atmosphere under monitoring. This system is maintained every year for keeping the performance. The maintenance is very important. Furthermore, the maintenance is profitable for designing a new High Temperature Gas cooled Reactor. This report describes the newly developed, maintenance items and improvements of the GRTS.

JAEA Reports

Maintenance of the auxiliary component cooling water system and the general cooling water system in HTTR

Kameyama, Yasuhiko; Watanabe, Shuji; Inoi, Hiroyuki; Shimizu, Yasunori; Aragaki, Etsushi; Shinozaki, Masayuki; Ota, Yukimaru

JAEA-Testing 2008-001, 63 Pages, 2008/03

JAEA-Testing-2008-001.pdf:20.97MB

The High Temperature Engineering Test Reactor (HTTR) has the Auxiliary Component Cooling Water System (ACCWS) and the General Cooling Water System (GCWS). ACCWS supplies the cooling water to the many facilities those are necessary to operate and cool the reactor. GCWS supplies the cooling water to the many facilities those are necessary to operate and cool the reactor in normal circumstances. Two kinds of the cooling water are cooled with the Cooling Tower. Each facility has the circulation pump, the cooling tower, the piping, the valve, the strainer and the injection system of the chemical solution. And these two facilities are operating all the year. This report describes maintenance items, improvements and management of the ACCWS and the GCWS.

JAEA Reports

Evaluation of heat exchange performance for the auxiliary component cooling water system cooling tower in HTTR

Tochio, Daisuke; Kameyama, Yasuhiko; Shimizu, Atsushi; Inoi, Hiroyuki; Yamazaki, Kazunori; Shimizu, Yasunori; Aragaki, Etsushi; Ota, Yukimaru; Fujimoto, Nozomu

JAEA-Technology 2006-045, 43 Pages, 2006/09

JAEA-Technology-2006-045.pdf:5.97MB

The auxiliary component cooling water system (ACCWS) is one of the cooling system in High Temperature Engineering Test Reactor (HTTR) The ACCWS has the features not only many facilities cooling but also heat sink of the vessel cooling system which is one of the engineering safety features. Therefore, the ACCWS is required to satisfy the design criteria of heat removal performance. In this report, heat exchange performance data of the rise-to-power-up test and the in-service operation for the ACCWS cooling tower was evaluated. Moreover, the evaluated values were compared with the design values, and it is confirmed that ACCWS cooling tower has the required heat exchange performance in the design.

JAEA Reports

Report of investigation on malfunction of reserved shutdown system in HTTR

Hamamoto, Shimpei; Iigaki, Kazuhiko; Shimizu, Atsushi; Sawahata, Hiroaki; Kondo, Makoto; Oyama, Sunao; Kawano, Shuichi; Kobayashi, Shoichi; Kawamoto, Taiki; Suzuki, Hisashi; et al.

JAEA-Technology 2006-030, 58 Pages, 2006/03

JAEA-Technology-2006-030.pdf:10.69MB

During normal operation of High Temperature engineering Test Reactor (HTTR) in Japan Atomic Energy Agency (JAEA), the reactivity is controlled by the Control Rods (CRs) system which consists of 32 CRs (16 pairs) and 16 Control Rod Drive Mechanisms (CRDMs). The CR system is located in stand-pipes accompanied by the Reserved Shutdown System (RSS). In the unlikely event that the CRs fail to be inserted, the RSS is provided to insert B$$_{4}$$C/C pellets into the core. The RSS shall be designed so that the reactor should be held subcriticality from any operation condition by dropping in the pellets. The RSS consists of B$$_{4}$$C/C pellets, hoppers which contain the pellets, electric plug, driving mechanisms, guide tubes and so on. In accidents when the CRs cannot be inserted, an electric plug is pulled out by a motor and the absorber pellets fall into the core by gravity. A trouble, malfunction of one RSS out of sixteen, occurred during a series of the pre-start up checks of HTTR on February 21, 2005. We investigated the cause of the RSS trouble and took countermeasures to prevent the issue. As the result of investigation, the cause of the trouble was attributed to the following reason: In the motor inside, The Oil of grease of the multiplying gear flowed down from a gap of the oil seal which has been deformed and was mixed with abrasion powder of brake disk. Therefore the adhesive mixture prevented a motor from rotating.

6 (Records 1-6 displayed on this page)
  • 1