Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 55

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Utilization status of the electron accelerator and the $$gamma$$-ray irradiation facilities

Agematsu, Takashi; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; et al.

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 181, 2014/03

The electron accelerator and the three $$gamma$$-ray irradiation facilities were operated for various research subjects according to the operation plan in FY 2012. The number of research subjects at the electron accelerator kept constant compared with FY 2011. The number of research subjects at the $$gamma$$-ray irradiation facilities slightly decreased year after year. Of all these research subjects, 14 ones at the electron accelerator and 93 ones at the $$gamma$$-ray irradiation facilities were relevant to the Fukushima Daiichi nuclear disaster.

Journal Articles

Operation of the electron accelerator and the $$gamma$$-ray irradiation facilities

Agematsu, Takashi; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; et al.

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 180, 2014/03

The electron accelerator and the $$gamma$$-ray irradiation facility have been operated without serious trouble. The annual operation time in FY 2012 for the electron accelerator, the first, the second cobalt irradiation facility and food irradiation facility are 910 h, 15,738 h, 10,537 h and 7,871 h, respectively. Typicaly repairs were next ones. The SF6 gas withdrawal system broke of the accelerator, and there was trouble of mixing in of air. The maintenance check of the first irradiation facility was done. The $$^{60}$$Co ources were purchased and loaded to the first irradiation facility. Fifteen pencil sources of $$^{60}$$Co with length of 30 cm each, twelve ball sources of $$^{60}$$Co and five $$^{137}$$Cs source were disposed of, and they were transferred to Japan Radioisotope Association (JRIA).

Journal Articles

Utilization status at TIARA facility

Haruyama, Yasuyuki; Takizawa, Haruki; Hosono, Masakazu; Mizuhashi, Kiyoshi*; Nakamura, Yoshiteru*; Kaneya, Satoshi*; Asai, Takahiro*; Kawabata, Michiko*; Imai, Koji*

JAEA-Review 2013-059, JAEA Takasaki Annual Report 2012, P. 177, 2014/03

Cyclotron use in FY 2012, was 2243.5 hours beam time. Among them, the use time of Bio technology and Medical application relationship most, I occupy the time spent for the Quarter of the total. Use offer to the outside utilization was 17%. Use the number of days in Electrostatic Accelerators was 490 days. Among them, Basic technology is accounted for using the percentage of 46%, but the use of irradiation Reactor materials and irradiation of Material for space even more, I accounted for 18 percent utilization rate, respectively, of 15%. Use offer to the outside utilization was 8%.

Journal Articles

Temperature dependence of gas evolution from polyolefins on irradiation under vacuum

Seguchi, Tadao*; Haruyama, Yasuyuki; Sugimoto, Masaki

Radiation Physics and Chemistry, 85, p.124 - 129, 2013/04

 Times Cited Count:6 Percentile:44.21(Chemistry, Physical)

The yields of gas evolution from various types of polyethylene and ethylene-propylene copolymer by radiation were precisely measured after $$gamma$$ ray irradiation under vacuum at the wide range of temperatures (-196 $$sim$$ 200$$^{circ}$$C). For all polymers the major gas was H$$_{2}$$ and the minor products were C$$_{1}$$, C$$_{2}$$, C$$_{3}$$ hydrocarbons and oxidation compounds as CO$$_{2}$$ and CO. The total gas yield increased with the increase of irradiation temperature. The yield of total gas increased with irradiation temperature, and the behavior was closely related to the molecular motion of polymer matrix during irradiation.

Journal Articles

Operation of the electron accelerator and the $$gamma$$-ray irradiation facilities

Agematsu, Takashi; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; et al.

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 174, 2013/01

The electron accelerator and the $$gamma$$-ray irradiation facility have been operated without serious trouble. The annual operation time in FY 2011 for the electron accelerator, the first, the second cobalt irradiation facility and food irradiation facility are 1,059 h, 18,722 h, 9,976 h and 7,427 h, respectively. Typically repairs were next ones. The beam control circuit trouble and the isolation trouble by mixing in of air into SF$$_{6}$$ gas at electron accelerator were repaired. The maintenance check of the second irradiation facility was done. The $$^{60}$$Co sources were purchased and loaded to the second irradiation facility. Forty five pencil sources of $$^{60}$$Co with length of 30 cm each, eight coin sources of $$^{60}$$Co and the $$gamma$$-ray radiographic apparatus with a $$^{60}$$Co source were disposed to Japan Radioisotope Association (JRIA).

Journal Articles

Utilization of the electron accelerator and the $$gamma$$-ray irradiation facilities

Haruyama, Yasuyuki; Agematsu, Takashi; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; et al.

JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 175, 2013/01

The electron accelerator and the three $$gamma$$-ray irradiation facilities were operated for various research subjects according to the operation plan in FY 2011 without serious trouble. The number of research subjects at the electron accelerator increased in the research fields of nuclear facilities and resources & biotechnology, and decreased in the fields of material processing and material for space. The number of research subjects at the $$gamma$$-ray irradiation facilities increased in the fields of material for space and material processing, and decreased in the fields of nuclear facilities and resources & biotechnology. Of all these research subjects, 15 ones at the electron accelerator and 94 ones at the $$gamma$$-ray irradiation facilities were relevant to the Fukushima Daiichi nuclear disaster.

Journal Articles

Spectroellipsometric studies on EB induced refractive index change of aliphatic polyimide

Seito, Hajime; Hakoda, Teruyuki; Hanaya, Hiroaki; Haruyama, Yasuyuki; Kaneko, Hirohisa; Yamashita, Takashi*; Kojima, Takuji

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 150, 2012/01

no abstracts in English

Journal Articles

Operation of the electron accelerator and $$gamma$$-ray irradiation facilities

Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Kawashima, Ikuo*; et al.

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 174, 2012/01

The electron accelerator and $$gamma$$-ray irradiation facilities have been operated without serious troubles before the earthquake happened in March 11 2011. The electron accelerator and $$gamma$$-ray irradiation facilities were stopped with concern about the earthquake damage, for 13 and 20 days, respectively.

Journal Articles

Utilization of the $$gamma$$-ray irradiation facilities and electron accelerator

Kaneko, Hirohisa; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Nagao, Yuto; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Kawashima, Ikuo*; et al.

JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 175, 2012/01

Irradiation facilities and an electron accelerator were operated for various research subjects according to the operation plan in FY 2010 without serious trouble. Utilization was stopped until the end of the fiscal year due to inspection etc., after the earthquake occurred on March 11. The number at $$gamma$$-ray irradiation facilities increased in the field of environment and basic technology, and decreased in the field of material processing and resource & bio-technology. The number of research subjects at the electron accelerator increased in the research fields of material for space, and decreased in the field of material processing and joint use.

Journal Articles

Dosimetry for 110 keV electron beam processing

Seito, Hajime; Matsui, Shinjiro*; Hakoda, Teruyuki; Ishikawa, Masayoshi*; Haruyama, Yasuyuki; Kaneko, Hirohisa; Kimura, Jun*; Kojima, Takuji

Zairyo Gijutsu, 30(1), p.10 - 16, 2012/01

The dosimetry of a 110 keV electron beam (EB) irradiation field is studied using a calorimeter, film dosimeter, and Monte Carlo simulation. This is important base for dose control in practical processing to guarantee the process reproducibility and product reliability. The simulation results are validated on the measurement of the energy fluence obtained by the calorimeter at one position in the air plane at different distances from a beam exit window. The spatial dose distribution obtained from the simulation is compared to that obtained by the film dosimeter. They show good agreement within $$pm$$5.0%. The precision of $$pm$$5.0% is sufficient to control the surface modification of polymers and the development of semiconductor devices in practical radiation processing. These results suggest that film dosimetry results at just one position in the air plane are sufficient to determine the irradiation characteristics of the low energy EB, and to provide a base of quality control measures in practical radiation processing.

Journal Articles

Electric installation at environment of nuclear fusion, 49; Development of radiation-resistant lighting

Okamura, Hiroki*; Tsuchida, Takashi*; Okada, Masao*; Yamagata, Ryohei; Seito, Hajime; Haruyama, Yasuyuki; Kaneko, Hirohisa

2011 Nen (Dai-29-Kai) Denki Setsubi Gakkai Zenkoku Taikai Koen Rombunshu, p.367 - 368, 2011/09

no abstracts in English

Journal Articles

Utilization of electron accelerator and $$gamma$$-ray irradiation facilities

Kaneko, Hirohisa; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Kawashima, Ikuo*; Matsuzaki, Shinya*

JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 183, 2011/01

An electron accelerator and three $$gamma$$-ray irradiation facilities were operated for various research subjects according to the operation plan in FY 2009 without serious trouble. The number of experiment subjects at the electron accelerator increased in the research fields of materials for space and heat-resist material, and decreased in the field of basic technology and nuclear facilities. The number at $$gamma$$-ray irradiation facilities increased in the field of nuclear facilities, and decreased in the field of materials processing and resource & bio-technology.

Journal Articles

Development of radiation-resistant lighting

Tsuchida, Takashi*; Yamagata, Ryohei; Seito, Hajime; Haruyama, Yasuyuki; Kaneko, Hirohisa; Kashimura, Shinji*

JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 22, 2011/01

There are a lot of restrictions of electric installations in a high radiation environment. For example longevity of electric devices would be shortened remarkably in a high radiation environment. It becomes impossible also for lighting equipments to keep an original function under a high radiological environment due to deterioration of insulation resistance of ballasts and luminous flux decrease of lamps, etc. The authors developed radiation-resistant lighting. This research aims to verify those functionality and safety under $$gamma$$-ray irradiation conditions.

Journal Articles

Operation of electron accelerator and $$gamma$$-ray irradiation facilities

Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Kaneko, Hirohisa; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Kawashima, Ikuo*; Matsuzaki, Shinya*

JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 182, 2011/01

The accelerator served mainly for graft-polymerization for new material development, radiation effect study on semiconductors and various experiments of visiting users. The annual operation time of the electron accelerator was 947.9 h. The Co-60 $$gamma$$-ray irradiation facilities consist of three buildings and cover a wide dose-rate range from 0.04 Gy/h to 20 kGy/h with eight irradiation rooms. The first irradiation facility served mainly for radiation-resistance testing of cables used in nuclear power plants. The second irradiation facility (No.6 irradiation room) operated as hourly scheduled. The food irradiation facility served radiation at lower dose rates. The annual operation time for the first, second cobalt irradiation facilities and food irradiation facility was 15,971 h, 12,389 h and 7,681 h respectively.

Journal Articles

Simulation technique on dose-rate distribution in a $$^{60}$$Co $$gamma$$-ray irradiation field

Kaneko, Hirohisa; Haruyama, Yasuyuki; Seito, Hajime; Yamagata, Ryohei; Hanaya, Hiroaki; Kojima, Takuji

Radioisotopes, 59(1), p.11 - 19, 2010/01

Dose-rate distribution in irradiation area of cobalt-60 $$gamma$$ rays was calculated using a Monte Carlo photon transport code named as EGS-SPG code. The dose rate values measured by the ionization chamber and the alanine dosimeter were compared with calculated ones for the evaluation of the validity of the calculation. As a result, the difference between measurements and the calculation value was within $$pm$$ a few % except for a position very near the source for a wide board radiation source. The dose-rate distribution can be estimated using these numerical results at the beforehand planning of a board radiation source arrangement although dose-rate measurement should be done only for a position very near the radiation source, where calculated value disagreed. The dose rate distribution measurement after the radiation source arrangement enables us to save number of the dosimeter and measurement time.

Journal Articles

Operation of the electron accelerators and $$gamma$$-ray irradiation facilitis

Haruyama, Yasuyuki; Kaneko, Hirohisa; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Kanazawa, Takao; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Hirai, Toshiyuki*; et al.

JAEA-Review 2009-041, JAEA Takasaki Annual Report 2008, P. 176, 2009/12

no abstracts in English

Journal Articles

Utilization of the electron accelerator and $$gamma$$-ray irradiation facilities

Kaneko, Hirohisa; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Kanazawa, Takao; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; Takagi, Masahide*; Hirai, Toshiyuki*; et al.

JAEA-Review 2009-041, JAEA Takasaki Annual Report 2008, P. 177, 2009/12

no abstracts in English

Journal Articles

Application of clear polymethylmethacrylate dosimeter Radix W to a few MeV electron in radiation processing

Seito, Hajime; Ichikawa, Tatsuya*; Hanaya, Hiroaki; Sato, Yoshishige*; Kaneko, Hirohisa; Haruyama, Yasuyuki; Watanabe, Hiroshi*; Kojima, Takuji

Radiation Physics and Chemistry, 78(11), p.961 - 965, 2009/11

 Times Cited Count:3 Percentile:24.54(Chemistry, Physical)

no abstracts in English

JAEA Reports

Technical data on electron beam and $$gamma$$-ray irradiation facilities; Electron accelerator and $$^{60}$$Co irradiation facility

Seito, Hajime; Haruyama, Yasuyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Kanazawa, Takao; Kaneko, Hirohisa; Kojima, Takuji

JAEA-Technology 2008-071, 29 Pages, 2008/11

[This article is unavailable to download the full text due to various reasons.]This report outlines useful data for users in electron beam and $$^{60}$$Co $$gamma$$-ray irradiation facilities at JAEA, TARRI. The contents include fundamental data such as characteristics of irradiation field, mechanism of irradiator and dose measurement in irradiated materials.

Journal Articles

Operation of the electron accelerators and $$gamma$$-ray irradiation facilities

Kaneko, Hirohisa; Haruyama, Yasuyuki; Haneda, Noriyuki; Hanaya, Hiroaki; Yamagata, Ryohei; Seito, Hajime; Kanazawa, Takao; Kojima, Takuji; Yamaguchi, Toshiyuki*; Yagi, Norihiko*; et al.

JAEA-Review 2008-055, JAEA Takasaki Annual Report 2007, P. 192, 2008/11

The accelerator served mainly for graft-polymerization for new material development, radiation effect study on semiconductors and various experiments of visiting users. The annual operation time of the electron accelerator is 706.3h. The Co-60 $$gamma$$-ray irradiation facilities consist of three buildings (8 rooms) and cover a wide dose-rate range from 0.04 Gy/h to 20 kGy/h with eight irradiation cells. The annual operation time for the first, second cobalt irradiation facilities and food irradiation facility is 23,433h, 9,010h and 10,631h.

55 (Records 1-20 displayed on this page)