Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Hayashi, Kenta; Nakamura, Takahisa; Takagi, Hisatsugu; Horie, Kaoru; Nakayama, Tamotsu; Hashimoto, Kazuhiko; Hayashi, Shoichi; Nakamura, Shinji; Takenaka, Shigeki; Ishizuka, Nobuo; et al.
Proceedings of INMM 54th Annual Meeting (CD-ROM), 10 Pages, 2013/07
JAEA and USDOE (Los Alamos National Laboratory (LANL)) have been collaborating on spent fuel measurements with a PNAR/SINRD NDA instrument at Fugen, in the course of the NGSI Spent Fuel Nondestructive Assay Project. In this collaboration, LANL's role has been to design and fabricate the detector (integrated PNAR and SINRD system), while JAEA's role has been to undertake the installation of the detector at the appropriate position in the spent fuel pool and to prepare for the actual measurements. In this paper we report the rehearsal of the measurement using a mock-up detector and a dummy fuel assembly in December 2012 and the plan of actual measurements in June 2013 (at the time of submission of this paper).
Matsushima, Akira; ; ; ; ; ;
Saikuru Kiko Giho, (11), p.81 - 91, 2001/06
None
*; *; *; *; *; *; *
PNC TN964 75-02, 26 Pages, 1975/01
Among of the whole construction work of the Experimental Fast Reactor "JOYO", the construction concerning cable penetrations started at August 1971 and almost completely finished at September 1974. This report describes the out-line of the design concepts of the cable penetrations and of their construction processes.
; ; Iguchi, Yukihiro; Sana, Kazuya;
INTERNATIONAL CONFERENCE ON ADVANCES IN THE OPERATIONAL SAFETY OF NPP, ,
None
Hayashi, Shoichi; Matsushima, Akira; Kawagoe, Shinji; Soejima, Goro; Awatani, Yuto; Isomi, Kazuhiko
no journal, ,
no abstracts in English