Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Maintenance management of emergency power supply equipment (uninterruptible power supply) in Tokai reprocessing plant

Nishida, Kyosuke; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

Nihon Hozen Gakkai Dai-6-Kai Gakujutsu Koenkai Yoshishu, p.294 - 297, 2009/08

Uninterruptible power supply systems are installed in the Tokai reprocessing plant in preparation for the emergency case that the commercial power supply is stopped by an accidental or intentional interruption in the supply of electricity. The uninterruptible power supply system particularly provides a temporary power source to the important devices for the radiation control of nuclear critical monitoring in the plant. Thus, the system is potentially important and essential for nuclear plants. The paper repots the current activities such as regular inspections, replacement of parts and system update, to maintain the function of uninterruptible power supply systems.

JAEA Reports

The 4th technological meeting of Tokai Reprocessing Plant

; Maki, Akira; ; ; ; ; Fukuda, Kazuhito

JNC TN8410 2001-023, 188 Pages, 2001/11

JNC-TN8410-2001-023.pdf:30.98MB

"The 4th technological meeting of Tokai Reprocessing Plant (TRP)" was held in JNFL Rokkasyo site on octorber 11$$^{th}$$, 2001. The report contains the proceedings, transparancies and questionnaires of themeetin. This time, we reported about "Maintenance and repair results of Tokai Reprocessing Plant" based on technology and knowledge accumulated in Tokai Reprocessing Plant.

JAEA Reports

None

; Maki, Akira; Yamanouchi, Takamichi; ; Ogata, Yoshiaki; ;

PNC TN8440 97-020, 111 Pages, 1997/03

PNC-TN8440-97-020.pdf:35.99MB

None

Oral presentation

The Construction of an intensive monitoring system for power supply stations in the Tokai reprocessing plant

Aoki, Kenji; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

no journal, , 

There are plural facilities having a radiation controlled area in the Tokai reprocessing plant, and an uninterruptible power supply system which considered a blackout is necessary for the power supply to each facility from the viewpoint of radiological management and nuclear material containment. In addition, at the time of the power supplying abnormality, intelligence gathering is necessary for prompt measures and restoration. In this report, the intensive monitoring system, which aimed for the unification of the power supply monitor place and the acceleration of the intelligence gathering to detect a power supply abnormality point, is described.

4 (Records 1-4 displayed on this page)
  • 1