Refine your search:     
Report No.
 - 
Search Results: Records 1-12 displayed on this page of 12
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Optics tuning for beam collimation in the J-PARC 3-50 beam transport line

Harada, Hiroyuki; Meigo, Shinichiro; Shirakata, Masashi*; Sato, Yoichi*; Tamura, Fumihiko; Tejima, Masaki*; Hashimoto, Yoshinori*; Igarashi, Susumu*; Koseki, Tadashi

JPS Conference Proceedings (Internet), 8, p.012010_1 - 012010_6, 2015/09

The J-PARC 3-50BT line is the beam transport line from 3-GeV rapid-cycling synchrotron (RCS) to 50-GeV main ring (MR). The RCS is the high-intensity proton accelerator, where designed beam power is 1 MW, and has the complex source of space charge effect, etc. Therefore, the uncontrolled emittance growth and beam halo increase nonlinearly with the increasing the beam power. Additionally, the physical aperture of MR with 81 $$pi$$ mm mrad is smaller than that of RCS with 486 $$pi$$ mm mrad. Therefore, the 3-50BT line has the collimators in order to remove the tail or halo of the extracted beam from the RCS. The designed collimator aperture is 54 $$pi$$ mm mrad. It is required to measure and optimize the optics parameters in the collimator area for taking full advantage of the beam collimation. Especially, it is very important to make the dispersion functions free in the collimator area and optimize the beta function. This paper will introduce the method of optics measurement and report the result of the measurement and optimization based on the simulation.

Journal Articles

Beam instrumentation at the 1 MW Proton beam of J-PARC RCS

Yamamoto, Kazami; Hayashi, Naoki; Okabe, Kota; Harada, Hiroyuki; Saha, P. K.; Yoshimoto, Masahiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Hashimoto, Yoshinori*; Toyama, Takeshi*

Proceedings of 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity, High Brightness and High Power Hadron Beams (HB 2014) (Internet), p.278 - 282, 2015/03

Rapid Cycling Synchrotron (RCS) of Japan Proton Accelerator Complex (J-PARC) is providing more than 300 kW of proton beam to Material and Life science Facility (MLF) and Main Ring (MR). Last summer shutdown, a new ion source was installed to increase output power to 1 MW. In order to achieve reliable operation of 1 MW, we need to reduce beam loss as well. Beam quality of such higher output power is also important for users. Therefore we developed new monitors that can measure the halo with higher accuracy. We present beam monitor systems for these purposes.

Journal Articles

Optics tuning at the J-PARC 3-50BT line

Harada, Hiroyuki; Meigo, Shinichiro; Shirakata, Masashi*; Sato, Yoichi*; Tamura, Fumihiko; Tejima, Masaki*; Hashimoto, Yoshinori*; Igarashi, Susumu*; Koseki, Tadashi

Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.39 - 43, 2014/06

The J-PARC 3-50 BT line is the beam transport line of extracted beam from 3-GeV rapid-cycling synchrotron (RCS) to 50-GeV main ring (MR). The RCS is the high-intensity proton accelerator, which designed beam power is 1 MW, and has the complex source of space charge effect, etc. Therefore, the uncontrolled emittance growth and beam halo increase nonlinearly with the increasing the beam power. Additionally, physical aperture of MR with 81 $$pi$$ mm mrad is smaller than that of RCS with 486 $$pi$$ mm mrad. Therefore, the 3-50 BT line has the collimators in order to scrape the tail/halo of extracted beam from the RCS. The designed collimator aperture is 54 $$pi$$ mm mrad. It is required to measure and optimize the optics parameter in the collimator area for taking full advantage of beam collimation. This paper will introduce the method of optics measurement and report the result of the measurement and optimization based on the simulation.

Journal Articles

The Data acquisition system of beam position monitors in J-PARC main ring

Hatakeyama, Shuichiro; Hayashi, Naoki; Arakawa, Dai*; Hashimoto, Yoshinori*; Hiramatsu, Shigenori*; Odagiri, Junichi*; Sato, Kenichiro*; Tejima, Masaki*; Tobiyama, Makoto*; Toyama, Takeshi*; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2698 - 2700, 2010/05

The Data Acquisition System of Beam Position Monitors (BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Circuits (BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.

Journal Articles

Beam injection tuning of the J-PARC main ring

Wei, G.; Koseki, Tadashi*; Igarashi, Susumu*; Tomizawa, Masahito*; Takano, Jumpei*; Ishii, Koji*; Shirakata, Masashi*; Fan, K.*; Hatakeyama, Shuichiro; Uota, Masahiko*; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.3915 - 3917, 2010/05

Journal Articles

Shot-by-shot beam position monitor system for beam transport line from RCS to MR in J-PARC

Tejima, Masaki*; Arakawa, Dai*; Hashimoto, Yoshinori*; Sato, Kenichiro*; Toyama, Takeshi*; Yamamoto, Noboru*; Hayashi, Naoki; Hanamura, Kotoku*

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.978 - 980, 2010/05

To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.

Journal Articles

Performance of the main ring BPM during the beam commissioning at J-PARC

Toyama, Takeshi*; Arakawa, Dai*; Hiramatsu, Shigenori*; Igarashi, Susumu*; Lee, S.*; Matsumoto, Hiroshi*; Odagiri, Junichi*; Tejima, Masaki*; Tobiyama, Makoto*; Hashimoto, Yoshinori*; et al.

Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.981 - 983, 2010/05

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation ($$<$$30 micrometers with 1 sec averaging), (3) beam based alignment.

Journal Articles

The Beam diagnostics system for J-PARC synchrotrons

Hayashi, Naoki; Hiroki, Seiji; Sato, Kenichiro; Toyokawa, Ryoji; Arakawa, Dai*; Lee, S.*; Hashimoto, Yoshinori*; Miura, Takako*; Toyama, Takeshi*

KEK Proceedings 2006-15 (CD-ROM), p.128 - 130, 2007/03

The beam diagnostics system for J-PARC synchrotrons (RCS and MR) will be presented. The design of the system will be described for high current machines. Some test results will be reported.

Journal Articles

Coupling impedance of the J-PARC kicker magnets

Toyama, Takeshi*; Hashimoto, Yoshinori*; Shirakabe, Yoshihisa*; Kamiya, Junichiro; Shobuda, Yoshihiro

KEK Proceedings 2006-15 (CD-ROM), p.140 - 142, 2007/03

no abstracts in English

Journal Articles

Uncut core loaded cavity with parallel inductor to reach Q=2 for J-PARC RCS

Schnase, A.; Hasegawa, Katsushi; Nomura, Masahiro; Tamura, Fumihiko; Yamamoto, Masanobu; Anami, Shozo*; Ezura, Eiji*; Hara, Keigo*; Hashimoto, Yoshinori*; Omori, Chihiro*; et al.

Proceedings of 3rd Annual Meeting of Particle Accelerator Society of Japan and 31st Linear Accelerator Meeting in Japan (CD-ROM), p.145 - 147, 2006/00

The optimum quality factor of the acceleration cavities for the J-PARC Rapid Cycling Synchrotron is Q=2. The first approach used cut-cores, where the distance between core halves in the cavity tank defines the quality factor while keeping the shunt impedance. Problems in core manufacturing made it unlikely that such cavities can operate for long time. The next step was a Q=2 hybrid structure; 4 of the 6 cavity tanks are filled with uncut cores at Q=0.6 and only 2 tanks are loaded with cut cores at wider distance (Q=4), which is easier to manage. Issues with the cut-core manufacturing remained, so RCS day-1 operation will start with uncut core cavities. However, Q=0.6 limits the maximum beam power. We present an idea, based on the hybrid cavity to add a parallel high quality circuit of inductor and capacitor to change the resonant frequency from 1 to 1.7 MHz and the total Q-value from 0.6 to 2, thus enabling almost full beam power operation of RCS with uncut cores loaded cavities.

Journal Articles

Longitudinal beam dynamincs on 3 GeV PS in JAERI-KEK joint project

Yamamoto, Masanobu; Tamura, Fumihiko; Ezura, Eiji*; Hashimoto, Yoshinori*; Mori, Yoshiharu*; Omori, Chihiro*; Schnase, A.*; Takagi, Akira*; Uesugi, Tomonori*; Yoshii, Masahito*

Proceedings of 8th European Particle Accelerator Conference (EPAC 2002), p.1073 - 1075, 2002/00

Longitudinal beam emittance should be controlled to alleviate space charge effects by rf manipulations at 3 GeV proton synchrotrons in JAERI-KEK Joint High Intensity Proton Accelerator Project. At injection, bunching factor of 0.4 will be achived by controlled longitudinal beam painting and multiplying 2nd higher harmonics. Furthermore, heavy beam loading is a severe problem, and it should be compensated by feedforward method for stable acceleration. About these themes, the scenario will be described with particle tracking simulations.

Journal Articles

RF acceleration system for 3GeV proton synchrotron in JAERI-KEK joint project

Yamamoto, Masanobu; Ezura, Eiji*; Hashimoto, Yoshinori*; Mori, Yoshiharu*; Omori, Chihiro*; Takagi, Akira*; Yoshii, Masahito*; Joint Project Team

JAERI-Conf 2001-002, p.285 - 289, 2001/03

no abstracts in English

12 (Records 1-12 displayed on this page)
  • 1