Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Harada, Masahide; Meigo, Shinichiro; Ito, Manabu; Dantsuji, Eiji; Takagiwa, Katsunori; Takada, Hiroshi; Maekawa, Fujio; Futakawa, Masatoshi; Nakamura, Mitsutaka; Miyake, Yasuhiro*; et al.
Nuclear Instruments and Methods in Physics Research A, 600(1), p.87 - 90, 2009/02
Times Cited Count:3 Percentile:28.22(Instruments & Instrumentation)In MLF of J-PARC, since weights of a building and shields are considerably heavy as 130,000 tons and 80,000 tons, respectively, large settlement of the MLF building is expected. The 3NBT line with 300 m in length is similar. To achieve a precise alignment under the large settlement, we conducted periodical survey measurements at the MLF building and 3NBT. At the completion of construction of the MLF building in December 2005, the settlement was about 40 mm. By extrapolating this result with weights to be added in the future for neutron beam line shields, we predicted that the MLF building settled in about 68mm at the completion of all neutron instrument construction. We decided that the muon target should be installed 5 mm higher than the neutron target with expecting future uneven settlement of the MLF building. The validation in the end of 2007 indicated that the measured level difference came up to the expected value.
Sakamoto, Shinichi; Meigo, Shinichiro; Fujimori, Hiroshi*; Harada, Masahide; Konno, Chikara; Kasugai, Yoshimi; Kai, Tetsuya; Miyake, Yasuhiro*; Ikeda, Yujiro
Nuclear Instruments and Methods in Physics Research A, 562(2), p.638 - 641, 2006/06
Times Cited Count:8 Percentile:50.31(Instruments & Instrumentation)Materials and Life Science Facility of Japan Proton Accelerator Research Complex (J-PARC) is an experimental facility where neutron and muon beams are provided as powerful probes. They are generated with high-intensity proton beam supplied through a 3-GeV proton beam transport (3NBT) line. Its beam optics and components were designed to transport the proton beam of large emittance with extremely low loss rate. The 3NBT accommodates an intermediate target that causes large beam loss. The scheme of the cascade target system was carefully devised to overcome difficulties due to high radiation.
Sakamoto, Shinichi; Meigo, Shinichiro; Konno, Chikara; Harada, Masahide; Miyake, Yasuhiro*; Kasugai, Yoshimi; Muto, Suguru*; Fujimori, Satoru*; Ono, Takehiro; Ikeda, Yujiro
JAERI-Tech 2001-075, 168 Pages, 2001/12
no abstracts in English
Meigo, Shinichiro; Harada, Masahide; Konno, Chikara; Ikeda, Yujiro; Watanabe, Noboru; Sakamoto, Shinichi*; Muto, Suguru*; Miyake, Yasuhiro*; Nishiyama, Kusuo*; Shimomura, Koichiro*; et al.
JAERI-Conf 2001-002, p.314 - 324, 2001/03
no abstracts in English
Yanagisawa, Ichiro*; Fusaeda, Shigeki*; Uzawa, Masayuki*; Kasai, Masao*; Ishihara, Yoshinao*; Ikeda, Yasuhiro*; Ezaki, Masahiro*
PNC TJ1214 94-007, 92 Pages, 1994/03
no abstracts in English
Yanagisawa, Ichiro*; Fusaeda, Shigeki*; Uzawa, Masayuki*; Kasai, Masao*; Ishihara, Yoshinao*; Ikeda, Yasuhiro*; Ezaki, Masahiro*
PNC TJ1214 94-006, 542 Pages, 1994/03
None
Ikeda, Yasuhiro*; Ishihara, Yoshinao*; *; *; *; Mukai, Satoru*; *
PNC TJ1214 92-002, 1340 Pages, 1992/02
None