Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Upgrade history and present status of the general control system for the Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Haga, Katsuhiro; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

JPS Conference Proceedings (Internet), 33, p.011151_1 - 011151_6, 2021/03

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF), GCS administers operation processes and interlocks of many instruments for various operation statuses. It consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of other facilities in J-PARC. Since the first beam injection in 2008, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control. Then, significant improvements in GCS such as upgrade of ICS by changing its framework software and function enhancement of ILS were proceeded until 2015, in considering sustainable long-term operation and maintenance. In recent years, many instruments in GCS have replaced due to end of production and support of them. In this way, many modifications have been proceeded in the entire GCS after start of beam operation. Under these situation, it is important to comprehend upgrade history and present status of GCS in order to decide its upgrade plan for the coming ten years. This report will mention upgrade history, present status and future agenda of GCS.

Journal Articles

Conceptual design of an abnormality sign determination system for the general control system of the Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Teshigawara, Makoto; Naoe, Takashi; Haga, Katsuhiro; Watanabe, Akihiko*

Journal of Neutron Research, 22(2-3), p.337 - 343, 2020/10

For operating a spallation neutron source and a muon target safely and efficiently, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF). GCS administers operation and interlock processes of many instruments under various operation status. Since the first beam injection in 2008, it has operated stably without any serious troubles for more than ten years. GCS has a data storage server storing operational data on status around target stations. It has functioned well to detect and investigate unusual situations by checking data in this server. For continuing stable operation of MLF in future, however, introduction of abnormality sign determination system (ASDS) will be necessary for picking up potential abnormalities of target stations caused by radiation damages, time-related deterioration and so on. It will judge abnormalities from slight state transitions of target stations based on analysis with various operational data throughout proton beams, target stations, and secondary beams during long-term operations. This report mentions present status of GCS, conceptual design of ASDS, and installation of an integral data storage server which can deal with various data for ASDS integrally.

JAEA Reports

Development of prototype for TEF-T integral control system of J-PARC

Sakai, Kenji; Obayashi, Hironari; Saito, Shigeru; Sasa, Toshinobu; Sugawara, Takanori; Watanabe, Akihiko*

JAEA-Technology 2019-009, 18 Pages, 2019/07

JAEA-Technology-2019-009.pdf:2.34MB

Construction of Transmutation Experimental Facility (TEF) is under planning in the Japan Proton Accelerator Research Complex (J-PARC) program to promote R&D on the transmutation technology with using accelerator driven systems (ADS). ADS Target Test Facility (TEF-T) in TEF will develop spallation target technology and study on target materials with irradiating high intensity proton beams on a lead-bismuth eutectic (LBE) target. For safe and efficient beam operation, a general control system (GCS) will be constructed in TEF-T. GCS comprises several subsystems, such as a network system (LAN), an integral control system (ICS), an interlock system (ILS), and a timing distribution system (TDS) according to their roles. Especially, the ICS plays the important role that executes integral operations in the entire facility, acquires, stores and distributes operation data. We planned to develop a prototype of the ICS, to evaluate its concrete performances such as data transmission speeds, data storage capability, control functions, long-term stability of the system, and to utilize them for design of the actual ICS. This report mentions to product the prototype of ICS and to apply it to remote operations of instruments for developing LBE target technology.

JAEA Reports

Progress of general control system for Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Takada, Hiroshi; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

JAEA-Technology 2018-011, 57 Pages, 2019/01

JAEA-Technology-2018-011.pdf:4.98MB

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF). GCS administers operation processes and interlocks of many instruments. It consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of the accelerators and other facilities in J-PARC. Since the first beam injection, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control. Then, significant improvements in GCS such as upgrade of ICS by changing its framework software and function enhancement of ILS were proceeded until 2015. In this way, many modifications have been proceeded in the entire GCS during a period of approximately ten years after start of beam operation. Under these situation, it is important to comprehend upgrade history and present status of GCS in order to decide its upgrade plan. This report summarizes outline, structure, roles and functions of GCS in 2017.

Oral presentation

Progress of general control system of Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Takada, Hiroshi; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

no journal, , 

no abstracts in English

Oral presentation

Recent progress and future plan of general control system of Materials and Life Science Experimental Facility at J-PARC

Sakai, Kenji; Oi, Motoki; Haga, Katsuhiro; Takada, Hiroshi; Kai, Tetsuya; Nakatani, Takeshi; Kobayashi, Yasuo*; Watanabe, Akihiko*

no journal, , 

For safely and efficiently operating a spallation neutron source and a muon target, a general control system (GCS) operates within Materials and Life Science Experimental Facility (MLF). GCS consists of several subsystems such as an integral control system (ICS), interlock systems (ILS), shared servers, network system, and timing distribution system (TDS). Although GCS is an independent system that controls the target stations, it works closely with the control systems of the accelerators and other facilities in J-PARC. Since the first beam injection in 2008, GCS has operated stably without any serious troubles after modification based on commissioning for operation and control of MLF. Then, significant improvements in GCS were proceeded until 2015 in considering sustainable long-term operation and maintenance. In recent years, many instruments in GCS have replaced to next generation models due to end of production and support of them. This report summarizes upgrade history of GCS during a period of approximately ten years after start of beam operation, and its present status. As future plan, it will also discuss development of an abnormality sign determination system that can detects potential abnormality from slight state transitions of target stations by analyzing operation data over the entire MLF.

6 (Records 1-6 displayed on this page)
  • 1