Refine your search:     
Report No.
 - 
Search Results: Records 1-10 displayed on this page of 10
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

In-situ dismantling of the liquid waste storage tank LV-1 in the JRTF; The Dismantling work

Yokozuka, Yuta; Sunaoshi, Mizuho*; Sakai, Tatsuya; Fujikura, Toshiki; Handa, Yuichi; Muraguchi, Yoshinori; Mimura, Ryuji; Terunuma, Akihiro

JAEA-Technology 2021-037, 44 Pages, 2022/03

JAEA-Technology-2021-037.pdf:10.84MB

JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in-situ dismantling method. The dismantling work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.

JAEA Reports

In-situ dismantling of the liquid waste storage tank LV-1 in the JRTF; The Dismantling preparation work

Yokozuka, Yuta; Sunaoshi, Mizuho*; Fujikura, Toshiki; Suzuki, Shota; Muraguchi, Yoshinori; Handa, Yuichi; Mimura, Ryuji; Terunuma, Akihiro

JAEA-Technology 2020-017, 56 Pages, 2021/01

JAEA-Technology-2020-017.pdf:7.88MB

JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in situ dismantling method. The dismantling preparation work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.

JAEA Reports

Decommissioning activities and R&D of nuclear facilities in the second midterm plan

Terunuma, Akihiro; Mimura, Ryuji; Nagashima, Hisao; Aoyagi, Yoshitaka; Hirokawa, Katsunori*; Uta, Masato; Ishimori, Yuu; Kuwabara, Jun; Okamoto, Hisato; Kimura, Yasuhisa; et al.

JAEA-Review 2016-008, 98 Pages, 2016/07

JAEA-Review-2016-008.pdf:11.73MB

Japan Atomic Energy Agency formulated the plan to achieve the medium-term target in the period of April 2010 to March 2015(hereinafter referred to as "the second medium-term plan"). JAEA determined the plan for the business operations of each year (hereinafter referred to as "the year plan"). This report is that the Sector of Decommissioning and Radioactive Waste Management has summarized the results of the decommissioning technology development and decommissioning of nuclear facilities which were carried out in the second medium-term plan.

JAEA Reports

Removal of the liquid waste storage tank LV-2 in JRTF, 2; Removal works

Kanayama, Fumihiko; Hagiya, Kazuaki; Sunaoshi, Mizuho; Muraguchi, Yoshinori; Satomi, Shinichi; Nemoto, Koichi; Terunuma, Akihiro; Shiraishi, Kunio; Ito, Shinichi

JAEA-Technology 2011-011, 36 Pages, 2011/06

JAEA-Technology-2011-011.pdf:2.53MB

Dismantling activities of equipments in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. Removing out of the large liquid waste storage tank LV-2 as a whole tank without cutting in pieces from the annex building B to confirm safety and efficiency of this method started from 2006. After preparatory works, ceiling of LV-2 room was opened, and LV-2 was transferred. Useful data were collected on manpower, radiation control and waste amount through the preparatory works, and work efficiency was analyzed by use of these data.

JAEA Reports

Decommissioning five facilities in Nuclear Science Research Institute

Terunuma, Akihiro; Naito, Akira; Nemoto, Koichi; Usami, Jun; Tomii, Hiroyuki; Shiraishi, Kunio; Ito, Shinichi

JAEA-Review 2010-038, 96 Pages, 2010/09

JAEA-Review-2010-038.pdf:5.9MB

Japan Atomic Energy Agency (JAEA) has midterm plan for decommissioning the facilities being finished their role and the facilities that became unnecessary by shifting their functions to other facilities. In the first midterm plan (from the latter half of fiscal year 2005 to fiscal year 2009), decommissioning of five facilities (Ceramic Research Facility, Plutonium Research Facility No.2, Metallurgy Research Facility, Isotope Separation Research Facility and Reprocessing Test Facility) had been carried out in order to release controlled area and dismantle the facilities in Nuclear Science Research Institute (NSRI), JAEA. The decommissioning activity for each facility had been reported to the regulatory body and municipalities. On this report, we summarize the each activity for five facilities by reviewing the reports to the regulatory body and municipalities. We also added the knowledge obtained through the activity.

JAEA Reports

JRR-2 decommissioning activity, 2

Suzuki, Takeshi; Nakano, Masahiro; Okawa, Hiroshi; Terunuma, Akihiro; Kishimoto, Katsumi; Yano, Masaaki

JAERI-Tech 2005-018, 84 Pages, 2005/03

JAERI-Tech-2005-018.pdf:27.52MB

no abstracts in English

Journal Articles

Present status of JRR-2 decommissioning

Nakano, Masahiro; Okawa, Hiroshi; Suzuki, Takeshi; Kishimoto, Katsumi; Terunuma, Akihiro; Yano, Masaaki

Dekomisshoningu Giho, (30), p.11 - 24, 2004/09

Japan Research Reactor No.2(JRR-2), heavy water moderated and cooled tank type research reactor with maximum thermal power of 10MW,was operated for over 36 years, and was permanently shut down in December, 1996. In 1997, decommissioning plan was submitted to the STA, and dismantling was begun. Decommissioning program of JRR-2 is divided into 4 phases. Phase 1, 2 had already been completely finished without any trouble. Furthermore, the phase 3 was also finished in February, 2004 as planned. On exposure of worker in phase 1, 2 and 3, it was achieved to control lower than the estimate. On exposure of worker in phase 1, 2 and 3, it was achieved to control lower than the estimate. Reactor will be removed in phase 4 by one piece removal technique. The reactor building is planned to use effectively as a hot experimental facilities after decommissioning. The decommissioning plan was changed that the reactor would be kept in safety storage.

JAEA Reports

JRR-2 decommissioning activity, 1

Nakano, Masahiro; Arigane, Kenji; Okawa, Hiroshi; Suzuki, Takeshi; Kishimoto, Katsumi; Terunuma, Akihiro; Yano, Masaaki; Sakuraba, Naotoshi; Oba, Nagamitsu

JAERI-Tech 2003-072, 92 Pages, 2003/08

JAERI-Tech-2003-072.pdf:6.99MB

The decommissioning plan of the Japan Research reactor No2(JRR-2), decommissioning activities until the first half of phase-3, radioactive wastes and exposure dose of workers are described in this report. Since the first criticality in October 1960, JRR-2 had been operated about 36 years for various experiments. However, JRR-2 was permanent shutdown in December 1996 based on JAERI's long term plan, and the decommissioning of the JRR-2 was started in August 1997. Decommissioning of the JRR-2 was planed for 11 years from 1997 to 2007 and the program was divided into 4 phases. The decommissioning activities of the phase-1, phase-2 and the first half of phase-3 had already completed as planned in March 1998, February 2000, March 2002, respectively. The decommissioning activities of the later half of Phase-3 (dismantling of the reactor cooling systems) are carrying out at present time with planed 2002 and 2003 fiscal years.

Oral presentation

Technical support for planning and installation of simple ground repository; FY2011 status of support activities for promotion of decontamination in the Fukushima Environmental Safety Center, JAEA

Abe, Hironobu; Ikeda, Koki; Mikake, Shinichiro; Nagasaki, Yasushi; Niizato, Tadafumi; Asazuma, Shinichiro; Aoki, Isao; Ishikawa, Nobuyuki; Ishikawa, Hiroyasu; Ishizaki, Nobuhiro; et al.

no journal, , 

no abstracts in English

Oral presentation

JAEA's technical knowhow for environmental remediation of Fukushima, 1; Technical supports for local governments (Consistency confirmation with Decontamination-related guidelines to national forest temporary storage settings)

Sumiya, Masato; Ikeda, Koki; Sonoda, Takashi; Niizato, Tadafumi; Mikake, Shinichiro; Abe, Hironobu; Inoue, Makoto; Eguchi, Kazutoshi; Kozawa, Masachiyo; Terunuma, Akihiro; et al.

no journal, , 

no abstracts in English

10 (Records 1-10 displayed on this page)
  • 1