Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 47

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron, 2

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.

Journal Articles

Achievement of low beam loss at high-intensity operation of J-PARC 3 GeV RCS

Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Hatakeyama, Shuichiro; Moriya, Katsuhiro; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1 - 5, 2023/01

Journal Articles

Development of beam window protection unit for J-PARC Linac

Takahashi, Hiroki; Miyao, Tomoaki*; Hatakeyama, Shuichiro; Ishiyama, Tatsuya*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.300 - 304, 2023/01

At J-PARC Linac, some beam dumps (BDs) are used for beam conditioning and study. A beam window is installed in the beamlines of each BD. A beam window protection system has been installed in the Linac 0-deg BD after a trouble with the beam window in 2018. However, the current system has not proved to be fully functional for future beam upgrade plan and etc. Then, we started to develop a beam window protection unit with a new function to measure the beam in real time and to inhibit the beam even in the middle of a beam pulse. In this paper, the details and performance of the developed beam window protection unit will be described.

Journal Articles

Reducing the effect of noise generated from stepper motor for H0 collimator in J-PARC RCS

Fujiyama, Hiroki*; Takahashi, Hiroki; Okabe, Kota; Ito, Yuichi*; Hatakeyama, Shuichiro; Suzuki, Takahiro*; Otsu, Satoru*; Yamakawa, Ryuto*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.529 - 531, 2023/01

Stepper motors are used for mechanical drive in collimators and wire scanner monitors of J-PARC accelerators. Many of these drive unit hardware have been used since the beginning of J-PARC construction, and it is necessary to take measures against aging deterioration. Therefore, we started updating the motor and control system from around 2017. However, when the stepper motor was updated to the current product in the RCS H0 collimator, a malfunction occurred. This is because the drive unit control system cannot correctly recognize the state of the LS (limit switch) due to the noise generated by the motor driver, which hinders the operation. When the noise generated from the old and new stepper motors was measured in a simple test environment for confirmation, it was found that the current product was clearly larger. As a countermeasure, when the wiring of the stepper motor, which was bundled in a single multi-core cable, was separated into separate cables for the power system and LS signal system, the noise level was reduced to about 1/10 and normal operation was restored. I was able to. In this case, we report on noise countermeasures for the RCS H0 collimator drive unit.

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:3 Percentile:80.29(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

Journal Articles

Measurements of radiation fields from a ceramic break

Shobuda, Yoshihiro; Toyama, Takeshi*; Yoshimoto, Masahiro; Hatakeyama, Shuichiro

Proceedings of 13th International Particle Accelerator Conference (IPAC 22) (Internet), p.1663 - 1666, 2022/07

Ceramic breaks are used in synchrotrons for many purposes. For example, they are inserted between the Multi-Wire Profile Monitors (MWPMs) on the injection line at the rapid cycling synchrotron (RCS) in J-PARC to completely prevent the wall currents accompanying beams from affecting the MWPMs. On the other hand, from the viewpoint of suppressing beam impedances and the radiation fields from the ceramic breaks, it would be preferable that the inner surface of the ceramic break is coated with titanium nitride (TiN), or covered over capacitors. In this report, we measure the radiation fields from the ceramic break with and without capacitors as well as the beam profile and investigate the effect of the ceramic break on the measurements.

Journal Articles

Neutron measurement in the accelerator tunnel of J-PARC Rapid Cycling Synchrotron

Yamamoto, Kazami; Hatakeyama, Shuichiro; Otsu, Satoru*; Matsumoto, Tetsuro*; Yoshimoto, Masahiro

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.494 - 498, 2021/10

J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) provides more than 700 kW proton beam to the neutron target. In order to investigate the influence of the radiation, we intend to evaluate the radiations such as the neutron and gamma-rays, which are generated due to the proton beam loss. If the amount of beam loss is excessive, it becomes difficult to identify the individual neutron and gamma ray. Therefore, we investigated the signal rate of the extraction point of RCS. Preliminary result indicated that we can enough distinguish the neutron and gamma-ray by the liquid scintillator.

Journal Articles

Analysis of machine protection system events in the J-PARC Linac/RCS

Hayashi, Naoki; Hatakeyama, Shuichiro; Fukuta, Shimpei*

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.679 - 682, 2021/10

In order to achieve a high availability in a user facility accelerator complex, it is necessary to understand in detail not only the simple failure cause of the magnet or the acceleration cavity power supply, but also complex interlocked events. At J-PARC, not only the primary interlock information but also the data recorded by the beam diagnostic system before the interlocked event is used to carefully reconstruct the event and clarify the cause more accurately. This time, we proceeded with the analysis based on more detailed waveform of the RCS Beam Loss Monitor and the events during simultaneous operation of MLF and MR. We present various events of the beam destination switching problem, the influence of the ion source discharged, and the events related to the RCS extraction kicker.

Journal Articles

Dependence of charge-exchange efficiency on cooling water temperature of a beam transport line

Yamamoto, Kazami; Hatakeyama, Shuichiro; Saha, P. K.; Moriya, Katsuhiro; Okabe, Kota; Yoshimoto, Masahiro; Nakanoya, Takamitsu; Fujirai, Kosuke; Yamazaki, Yoshio; Suganuma, Kazuaki

EPJ Techniques and Instrumentation (Internet), 8(1), p.9_1 - 9_9, 2021/07

The 3 GeV Rapid Cycling Synchrotron at the Japan Proton Accelerator Research Complex supplies a high-intensity proton beam for neutron experiments. Various parameters are monitored to achieve a stable operation, and it was found that the oscillations of the charge-exchange efficiency and cooling water temperature were synchronized. We evaluated the orbit fluctuations at the injection point using a beam current of the injection dump, which is proportional to the number of particles that miss the foil and fail in the charge exchange, and profile of the injection beam. The total width of the fluctuations was approximately 0.072 mm. This value is negligible from the user operation viewpoint as our existing beam position monitors cannot detect such a small signal deviation. This displacement corresponds to a 1.63$$times$$10$$^{-5}$$ variation in the dipole magnetic field. Conversely, the magnetic field variation in the L3BT dipole magnet, which was estimated by the temperature change directly, is 4.08$$times$$10$$^{-5}$$. This result suggested that the change in the cooling water temperature is one of the major causes of the efficiency fluctuation.

Journal Articles

High intensity measurement issues at the J-PARC RCS

Hayashi, Naoki; Yoshimoto, Masahiro; Hatakeyama, Shuichiro*

JPS Conference Proceedings (Internet), 33, p.011017_1 - 011017_6, 2021/03

The J-PARC Rapid-Cycling Synchrotron (RCS) is designed as an 1-MW high intensity proton accelerator. Beam intensity diagnostics is an important device to prove the accelerator performance. The RCS has two instruments based on different principles, namely Direct-current Current Transformer (DCCT) and Slow-CT (SCT). It was realized that SCT showed strange behavior when continuous 1-MW demonstration had been performed, although there were no problem under 1-MW equivalent operation with single shot. The origin of the problem seems to be limited band width at higher frequency and asymmetric circulating beam current pattern. On the other hand, DCCT also showed output signal saturation with 1.2-MW equivalent single shot. But, SCT worked properly with this conditions. These problems have to be solved for future continuous 1-MW and higher intensity operation. On this presentation, we will show beam and test pulse data and discuss about how to measure these problems.

Journal Articles

High voltage dependence measurement of beam loss monitor in J-PARC RCS

Hatakeyama, Shuichiro; Yoshimoto, Masahiro; Yamamoto, Kazami

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.475 - 477, 2020/09

J-PARC accelerators consist of linear accelerator (LINAC), 3GeV synchrotron (RCS) and main ring synchrotron (MR). RCS is an important facility delivering the beam to Materials and Life Science Experimental Facility (MLF) and MR. In RCS 87 proportional counter type beam loss monitors (PBLM) are installed and it is protecting the equipments on the beam line from the radioactivation by alerting the machine protection system (MPS) when the integrated value of the beam loss in an accelerating cycle gets over the limit. In this presentation, -1000V to -2000V high voltage are adapted to PBLMs and output was measured. In result, some PBLMs where the beam loss is large enough, there are saturations around -1400V to -2000V about the peak value of beam loss but no saturation about integral value of beam loss. Also it is considered the new HV system which solves some issues of the on-going HV system.

Journal Articles

Results of 1-MW operation in J-PARC 3 GeV rapid cycling synchrotron

Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Yoshimoto, Masahiro; et al.

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.209 - 213, 2020/09

The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, just before the summer shutdown period, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. First trial was 1-hour continuous operation in July 2018, and second trial was 10-hours continuous in July 2019. In both cases, we achieved almost stable operation. Furthermore, in June 2020, we tried to operate continuously for over 40 hours. But in this case, some trouble occurred and the operation was frequently suspended. Through these continuous operation trials, we have identified issues for stable operation of 1 MW. In this presentation, we will report the results of 1-MW continuous operation and issues obtained from these results.

Journal Articles

First measurement and online monitoring of the stripper foil thinning and pinhole formation to achieve a longer foil lifetime in high-intensity accelerators

Saha, P. K.; Yoshimoto, Masahiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Harada, Hiroyuki; Tamura, Fumihiko; Yamamoto, Kazami; Yamazaki, Yoshio; Kinsho, Michikazu; Irie, Yoshiro*

Physical Review Accelerators and Beams (Internet), 23(8), p.082801_1 - 082801_13, 2020/08

AA2020-0279.pdf:1.92MB

 Times Cited Count:4 Percentile:46.04(Physics, Nuclear)

Journal Articles

Development of a beam window protection system for the J-PARC Linac

Takahashi, Hiroki; Hatakeyama, Shuichiro; Sawabe, Yuki; Miyao, Tomoaki*; Ishiyama, Tatsuya*; Suzuki, Takahiro*

Journal of Physics; Conference Series, 1350, p.012142_1 - 012142_5, 2019/12

 Times Cited Count:0 Percentile:0.06

At the J-PARC Linac, beam conditioning and study are performed using beam dumps (BDs). To be a partition with the high vacuum section, a beam window (material Ni, 0.38 mm thick, mirror-shape) is installed upstream of the BD along the beam line. Beams that can be accepted by the beam window are about 1/50 or less of rated beam according to thermal evaluation and experience. Therefore, when using a beam dump, it is necessary not to exceed this tolerance. In a 2018 beam study, the beam e that exceeded tolerance was incident on the 0-degree dump due to human error, and the beam window was cracked. Then, this has revealed the need for protection of the beam window by hardware. Therefore, based on the existing system for monitoring the per-hour beam amount, we began to develop a system to monitor one shot beam and one second beam amount. And, we succeeded in implementing a system that protects the beam window by monitoring the beam in a short time (one shot, and for one second). In addition, the performance tests using actual beams were performed, and it was confirmed that the developed system had sufficient performance requirements to protect the beam window.

Journal Articles

Beam monitor data analysis of interlocked events at J-PARC RCS

Hayashi, Naoki; Yoshimoto, Masahiro; Moriya, Katsuhiro; Hatakeyama, Shuichiro*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1096 - 1100, 2019/07

It is necessary to understand the reason why the accelerator has been interrupted due to beam loss or other machine mal function in order to keep high availability in long term period. At J-PARC RCS, 25 Hz rapid-cycling synchrotron, there is a system to record beam intensity and beam loss monitor signal for all pulses with 10 ms period. At this time, in addition, new system to archive data with better time resolution if interlocked events occurred has been introduced. Using these archived data, the events only RCS BLM gives MPS have been analyzed and it turns out that these events are related to the ion source discharge which makes very low intensity within less than a second. In this paper other typical events are presented and discuss how to improve the accelerator performance in future.

Journal Articles

The Fast measurement of the monitors data with the beam synchronized tag in J-PARC

Hatakeyama, Shuichiro*; Yamamoto, Kazami; Yoshimoto, Masahiro; Hayashi, Naoki

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.789 - 793, 2019/07

The J-PARC Rapid Cycling Synchrotron (RCS) accelerates 400 MeV LINAC beams up to 3 GeV, and distributes them to the Materials Life Science Experiment Facility (MLF) and the Main Ring Synchrotron (MR) in 25 Hz cycle. To prevent radiation damages from the beam loss and also to detect failures of machines an interlock mechanism called the Machine Protection System (MPS) is introduced. If the beam is stopped by the MPS we should recover it quickly for the users of experiment facilities. The MPS related to the beam dynamics is usually diagnosed by beam loss monitors (BLM), beam position monitors (BPM) and current transformers (CT). Data of these monitors should be distinguished MLF or MR since the parameters for the magnet and the RF systems are different between MLF and MR. We confirmed validity of the method to distinguish the beam destination by using the information of the beam synchronized tag from the reflective memory (RFM) when taking the monitor data in 25 Hz.

Journal Articles

Development of a beam window protection system for the J-PARC Linac

Takahashi, Hiroki; Hatakeyama, Shuichiro; Sawabe, Yuki; Miyao, Tomoaki*; Ishiyama, Tatsuya*; Suzuki, Takahiro*

Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.3886 - 3889, 2019/06

At the J-PARC Linac, beam conditioning and study are performed using beam dumps (BDs). To be a partition with the high vacuum section, a beam window (material Ni, 0.38 mm thick, mirror-shape) is installed upstream of the BD along the beam line. Beams that can be accepted by the beam window are about 1/50 or less of rated beam according to thermal evaluation and experience. Therefore, when using a beam dump, it is necessary not to exceed this tolerance. In a 2018 beam study, the beam e that exceeded tolerance was incident on the 0-degree dump due to human error, and the beam window was cracked. Then, this has revealed the need for protection of the beam window by hardware. Therefore, based on the existing system for monitoring the per-hour beam amount, we began to develop a system to monitor one shot beam and one second beam amount. And, we succeeded in implementing a system that protects the beam window by monitoring the beam in a short time (one shot, and for one second). In addition, the performance tests using actual beams were performed, and it was confirmed that the developed system had sufficient performance requirements to protect the beam window.

Journal Articles

Analysis of interlocked events based on beam instrumentation data at J-PARC Linac and RCS

Hayashi, Naoki; Hatakeyama, Shuichiro; Miura, Akihiko; Yoshimoto, Masahiro; Futatsukawa, Kenta*; Miyao, Tomoaki*

Proceedings of 7th International Beam Instrumentation Conference (IBIC 2018) (Internet), p.219 - 223, 2019/01

J-PARC is a multi-purpose facility. Accelerator stability is the one of important issues for users of this facility. To realize stable operation, we must collect data on interlocked events and analyze these data to determine the reasons for the occurrence of such events. In J-PARC Linac, data of interlocked events have been recorded using several some beam loss monitors and current monitors, and these data have been are analyzed and classified. In J-PARC RCS, new instrumentation is being introduced to obtain beam position. We discuss the present status and future plans related to this subject.

Journal Articles

Monitoring of the injected beam to the J-PARC RCS and BPM design for H0 dump line

Hayashi, Naoki; Saha, P. K.; Yoshimoto, Masahiro; Hatakeyama, Shuichiro

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1055 - 1059, 2018/08

The J-PARC Rapid-Cycling Synchrotron (RCS) is designed as an 1-MW high power accelerator. It has been operated since 2007, and its injection energy and beam current are upgraded in 2014. Its operation is very smooth and provides the high intensity beam to the Material and Life science experimental facility (MLF) and the Main Ring (MR). The beam is injected with multi-turn mode. It is possible because the negative hydrogen ion beam from the Linac, H$$^{-}$$, and the circulating proton beam H$$^{+}$$ are different state. The H$$^{-}$$ is converted to H$$^{+}$$ at the injection point, where a charge stripper foil is set. A small fraction of the injected beam, which is not fully stripped, are transferred to the injection beam dump through H0 dump line to prevent un-necessary activation. Since the limit of beam dump is only 4 kW, which is about 3% of designed injection beam power 133 kW, the beam has to be stopped immediately in case of stripper foil break up incident.

Journal Articles

Improvement of the IPM for the high-intensity beam profile measurement in the J-PARC RCS

Kato, Shinichi; Harada, Hiroyuki; Hatakeyama, Shuichiro; Kawase, Masato; Yamamoto, Kazami; Kinsho, Michikazu

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1089 - 1093, 2016/11

In the J-PARC RCS, the residual gas ionization profile monitor (IPM) is adopted for the nondestructive detection of the 1D transverse distribution of the circulating proton beam. The IPM mainly consists of the divided electrodes generating the external electric field and the detection unit. For the profile measurement, the residual gas ionized by the beam is transported to the detection unit by the external transverse electric field and amplified by the Multi-Channel Plate (MCP) as the electron. After that, these electrons are detected and the 1D distribution is reconstructed. To improve IPM performance, some updates have been performed continuously such as the optimization of the electric field potential and the introduction of the new MCP which has the gradual gain response to the applied voltage. As a result, the IPM shows intended performance in the beam commissioning with the low current condition. However, the distribution cannot be measured in the high current condition such as over 100 kW because the noise increases and hides the signal. To solve this problem, we investigated the source of this noise and examined measures. To compare the simulation and the noise measurement results, we identified the cause of the noise as the electric field from the beam. Therefore, we developed additional electrode component to shield that field based on the simulation result. This component will be installed in 2016 summer. It is expected that the noise is reduced to be 1/100 compared with present one by the new component and the distribution measurement can be performed in the high current condition.

47 (Records 1-20 displayed on this page)