Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

In-situ dismantling of the liquid waste storage tank LV-1 in the JRTF; The Dismantling work

Yokozuka, Yuta; Sunaoshi, Mizuho*; Sakai, Tatsuya; Fujikura, Toshiki; Handa, Yuichi; Muraguchi, Yoshinori; Mimura, Ryuji; Terunuma, Akihiro

JAEA-Technology 2021-037, 44 Pages, 2022/03

JAEA-Technology-2021-037.pdf:10.84MB

JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in-situ dismantling method. The dismantling work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.

JAEA Reports

In-situ dismantling of the liquid waste storage tank LV-1 in the JRTF; The Dismantling preparation work

Yokozuka, Yuta; Sunaoshi, Mizuho*; Fujikura, Toshiki; Suzuki, Shota; Muraguchi, Yoshinori; Handa, Yuichi; Mimura, Ryuji; Terunuma, Akihiro

JAEA-Technology 2020-017, 56 Pages, 2021/01

JAEA-Technology-2020-017.pdf:7.88MB

JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in situ dismantling method. The dismantling preparation work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.

JAEA Reports

Removal of the liquid waste storage tank LV-2 in JRTF, 2; Removal works

Kanayama, Fumihiko; Hagiya, Kazuaki; Sunaoshi, Mizuho; Muraguchi, Yoshinori; Satomi, Shinichi; Nemoto, Koichi; Terunuma, Akihiro; Shiraishi, Kunio; Ito, Shinichi

JAEA-Technology 2011-011, 36 Pages, 2011/06

JAEA-Technology-2011-011.pdf:2.53MB

Dismantling activities of equipments in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. Removing out of the large liquid waste storage tank LV-2 as a whole tank without cutting in pieces from the annex building B to confirm safety and efficiency of this method started from 2006. After preparatory works, ceiling of LV-2 room was opened, and LV-2 was transferred. Useful data were collected on manpower, radiation control and waste amount through the preparatory works, and work efficiency was analyzed by use of these data.

Oral presentation

Development of nondestructive measurement techniques for uranium-contaminated waste; Measurement of uranium-contaminated waste including daughter nuclides

Omori, Koji; Oki, Koichi; Ishibashi, Yuzo; Numano, Tatsuo; Sunaoshi, Mizuho*; Suzuki, Satoshi*; Sukegawa, Yasuhiro*

no journal, , 

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1