Shimizu, Akira; Ohashi, Hirofumi; Kato, Michio; Hayashi, Koji; Aita, Hideki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Morisaki, Norihiro; Sakaki, Akihiro*; et al.
JAERI-Tech 2005-031, 174 Pages, 2005/06
Connection of hydrogen production system by steam reforming of methane to the High Temperature Engineering Test Reactor (HTTR) of the Japan Atomic Energy Research Institute (JAERI) has been surveyed until now. Mock-up test facility of this steam reforming system with full-scale reaction tube was constructed in FY 2001, and a lot of operational test data on heat exchanges were obtained in these tests.In this report specifications, structures and heat transfer formulae of steam reformer, steam superheater, steam generator, condenser, helium gas cooler, feed gas heater and feed gas superheater were described. Evaluation codes were newly made to evaluate heat transfer characteristics from measured test data. Overall heat-transfer coefficient obtained from the experimental data were compared and evaluated with the prospective value calculated with heat transfer formulae. As a result, heat transfer performance and thermal efficiency of these heat exchangers were confirmed to be appropriate.
Sakaki, Akihiro*; Kato, Michio; Hayashi, Koji; Fujisaki, Katsuo*; Aita, Hideki; Ohashi, Hirofumi; Takada, Shoji; Shimizu, Akira; Morisaki, Norihiro; Maeda, Yukimasa; et al.
JAERI-Tech 2005-023, 72 Pages, 2005/04
In order to establish the system integration technology to connect a hydrogen production system to a high temperature gas cooled reactor, the mock-up test facility with a full-scale reaction tube for the steam reforming HTTR hydrogen production system was constructed in fiscal year 2001 and its functional test operation was performed in the year. Seven experimental test operations were performed from fiscal year 2001 to 2004. On a period of each test operation, there happened some troubles. For each trouble, the cause was investigated and the countermeasures and the improvement works were performed to succeed the experiments. The tests were successfully achieved according to plan.This report describes the improvement works on the test facility performed from fiscal year 2001 to 2004.