Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nemoto, Takahiro; Arakawa, Ryoki; Kawakami, Satoru; Nagasumi, Satoru; Yokoyama, Keisuke; Watanabe, Masashi; Onishi, Takashi; Kawamoto, Taiki; Furusawa, Takayuki; Inoi, Hiroyuki; et al.
JAEA-Technology 2023-005, 33 Pages, 2023/05
During shut down of the HTTR (High Temperature engineering Test Reactor) RS-14 cycle, an increasing trend of filter differential pressure for the helium gas circulator was observed. In order to investigate this phenomenon, the blower of the primary helium purification system was disassembled and inspected. As a result, it is clear that the silicon oil mist entered into the primary coolant due to the deterioration of the charcoal filter performance. The replacement and further investigation of the filter are planning to prevent the reoccurrence of the same phenomenon in the future.
Imai, Sahori*; Arakawa, Masato*; Nakanishi, Yohei*; Takenaka, Mikihito*; Aoki, Hiroyuki; Ouchi, Makoto*; Terashima, Takaya*
Macromolecules, 55(20), p.9113 - 9125, 2022/10
Times Cited Count:2 Percentile:27.19(Polymer Science)Kitazato, Kohei*; Milliken, R. E.*; Iwata, Takahiro*; Abe, Masanao*; Otake, Makiko*; Matsuura, Shuji*; Takagi, Yasuhiko*; Nakamura, Tomoki*; Hiroi, Takahiro*; Matsuoka, Moe*; et al.
Nature Astronomy (Internet), 5(3), p.246 - 250, 2021/03
Times Cited Count:43 Percentile:96.93(Astronomy & Astrophysics)Here we report observations of Ryugu's subsurface material by the Near-Infrared Spectrometer (NIRS3) on the Hayabusa2 spacecraft. Reflectance spectra of excavated material exhibit a hydroxyl (OH) absorption feature that is slightly stronger and peak-shifted compared with that observed for the surface, indicating that space weathering and/or radiative heating have caused subtle spectral changes in the uppermost surface. However, the strength and shape of the OH feature still suggests that the subsurface material experienced heating above 300 C, similar to the surface. In contrast, thermophysical modeling indicates that radiative heating does not increase the temperature above 200 C at the estimated excavation depth of 1 m, even if the semimajor axis is reduced to 0.344 au. This supports the hypothesis that primary thermal alteration occurred due to radiogenic and/or impact heating on Ryugu's parent body.
Nagae, Daisuke*; Abe, Yasushi*; Okada, Shunsuke*; Omika, Shuichiro*; Wakayama, Kiyoshi*; Hosoi, Shun*; Suzuki, Shinji*; Moriguchi, Tetsuro*; Amano, Masamichi*; Kamioka, Daiki*; et al.
Nuclear Instruments and Methods in Physics Research A, 986, p.164713_1 - 164713_7, 2021/01
Times Cited Count:5 Percentile:65.59(Instruments & Instrumentation)Numata, Naoto*; Asakawa, Tomoyuki*; Sakai, Hiroshi*; Umemori, Kensei*; Furuya, Takaaki*; Shinoe, Kenji*; Enami, Kazuhiro*; Egi, Masato*; Sakanaka, Shogo*; Michizono, Shinichiro*; et al.
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.566 - 570, 2015/09
no abstracts in English
Enami, Kazuhiro*; Furuya, Takaaki*; Sakai, Hiroshi*; Sato, Masato*; Shinoe, Kenji*; Umemori, Kensei*; Michizono, Shinichiro*; Miura, Takako*; Qiu, F.*; Arakawa, Dai*; et al.
Proceedings of 5th International Particle Accelerator Conference (IPAC '14) (Internet), p.2534 - 2536, 2014/07
We evaluated a slidejack tuner adopted as compact ERL Main Linac tuner. The tuner compensates the frequency by extending a cavity. Tuning is driven by two system, piezo and slidejack system. Slide-jack mechanism with long stroke drives coarsely piezo adjust precisely and fast. We tested performance of the tuners on operation.
Kaira, Kyoichi*; Sunose, Yutaka*; Ohshima, Yasuhiro; Ishioka, Noriko; Arakawa, Kazuhisa*; Ogawa, Tetsushi*; Sunaga, Noriaki*; Shimizu, Kimihiro*; Tominaga, Hideyuki*; Oriuchi, Noboru*; et al.
BMC Cancer, 13, p.482_1 - 482_12, 2013/10
Times Cited Count:74 Percentile:88.89(Oncology)Hayashi, Naoki; Kawase, Masato; Hatakeyama, Shuichiro; Hiroki, Seiji; Saeki, Riuji; Takahashi, Hiroki; Teruyama, Yuzo*; Toyokawa, Ryoji*; Arakawa, Dai*; Hiramatsu, Shigenori*; et al.
Nuclear Instruments and Methods in Physics Research A, 677, p.94 - 106, 2012/06
Times Cited Count:12 Percentile:66.54(Instruments & Instrumentation)A beam position monitor (BPM) system at J-PARC RCS is described. The J-PARC RCS is a rapid-cycling proton synchrotron and its designed beam power is 1 MW. A diameter of the BPM detector is larger than 250 mm, however the system has to measure the beam position very accurately. The system should work not only for the high intensity but also for lower intensity. There are 54 BPM around the ring and most of them are placed inside steering magnets because of quite limited space. The BPM detector is an electro static type and it has four electrodes, and a pair of electrode gives a good linear response with diagonal cut shape to detect the charge center precisely. The signal processing unit, which is equipped with 14-bit 40 MSPS ADC and 600 MHz DSP, has been developed. They are controlled via shared memory space and EPICS. It is capable to record full 25 Hz pulse data for averaged mode and it could also store whole waveform data for further analysis, like turn-by-turn position calculation.
Dobashi, Kunio*; Shimizu, Yasuo*; Matsuzaki, Shinichi*; Nagamine, Takeaki*; Sato, Takahiro; Okubo, Takeru; Yokoyama, Akihito; Ishii, Yasuyuki; Kamiya, Tomihiro; Arakawa, Kazuo*; et al.
JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 87, 2012/01
Hagiwara, Masayuki*; Sanami, Toshiya*; Iwamoto, Yosuke; Arakawa, Hiroyuki*; Shigyo, Nobuhiro*; Mokhov, N.*; Leveling, A.*; Boehnlein, D.*; Vaziri, K.*; Nakamura, Takashi*; et al.
Progress in Nuclear Science and Technology (Internet), 1, p.52 - 56, 2011/02
In pbar target station, the pulsed proton beam with the power of around 75 kW and the time structure of 1.6 s pulse width and 2.2 s cycle time bombards the pbar production target and produces high instantaneous intensity neutron (burst neutron) fields. The duration of the burst neutrons, which is less than s, is very severe condition to measure neutron spectra with a conventional Bonner sphere technique with pulse readout electronics because of signal pile-up problem. In this study, we have developed a current readout Bonner sphere technique to measure neutron spectra in a burst neutron field. We have measured the neutron spectra on the pbar target and graphite dump. The neutron spectra obtained with the present technique show generally good agreements with the calculation results using MARS code except difference of the thermal neutron flux due to the geometrical problem.
Hatakeyama, Shuichiro; Hayashi, Naoki; Arakawa, Dai*; Hashimoto, Yoshinori*; Hiramatsu, Shigenori*; Odagiri, Junichi*; Sato, Kenichiro*; Tejima, Masaki*; Tobiyama, Makoto*; Toyama, Takeshi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2698 - 2700, 2010/05
The Data Acquisition System of Beam Position Monitors (BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Circuits (BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.
Tejima, Masaki*; Arakawa, Dai*; Hashimoto, Yoshinori*; Sato, Kenichiro*; Toyama, Takeshi*; Yamamoto, Noboru*; Hayashi, Naoki; Hanamura, Kotoku*
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.978 - 980, 2010/05
To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.
Toyama, Takeshi*; Arakawa, Dai*; Hiramatsu, Shigenori*; Igarashi, Susumu*; Lee, S.*; Matsumoto, Hiroshi*; Odagiri, Junichi*; Tejima, Masaki*; Tobiyama, Makoto*; Hashimoto, Yoshinori*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.981 - 983, 2010/05
Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (30 micrometers with 1 sec averaging), (3) beam based alignment.
Sakanaka, Shogo*; Akemoto, Mitsuo*; Aoto, Tomohiro*; Arakawa, Dai*; Asaoka, Seiji*; Enomoto, Atsushi*; Fukuda, Shigeki*; Furukawa, Kazuro*; Furuya, Takaaki*; Haga, Kaiichi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2338 - 2340, 2010/05
Future synchrotron light source using a 5-GeV energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting R&D efforts for that. We are developing high-brightness DC photocathode guns, two types of cryomodules for both injector and main superconducting (SC) linacs, and 1.3 GHz high CW-power RF sources. We are also constructing the Compact ERL (cERL) for demonstrating the recirculation of low-emittance, high-current beams using above-mentioned critical technologies.
Matsuzaki, Shinichi*; Shimizu, Yasuo*; Dobashi, Kunio*; Nagamine, Takeaki*; Sato, Takahiro; Okubo, Takeru; Yokoyama, Akihito; Ishii, Yasuyuki; Kamiya, Tomihiro; Arakawa, Kazuo*; et al.
International Journal of Immunopathology and Pharmacology, 23(1), p.1 - 11, 2010/01
Nakashima, Hiroshi; Sakamoto, Yukio; Iwamoto, Yosuke; Matsuda, Norihiro; Kasugai, Yoshimi; Nakane, Yoshihiro; Masukawa, Fumihiro; Mokhov, N.*; Leveling, A.*; Boehnlein, D.*; et al.
Nuclear Technology, 168(2), p.482 - 486, 2009/11
Times Cited Count:7 Percentile:45.28(Nuclear Science & Technology)Experimental studies of shielding and radiation effects have been started using 120-GeV proton synchrotron at Fermi National Accelerator Laboratory (FNAL) under collaboration between FNAL and Japan. The first campaign of the experiment was carried out at the Pbar target station and Numi experimental station at FNAL, using antiproton and neutrino production targets irradiated by 120-GeV protons. The generated secondary particles passing through steel, concrete and rock were measured by activation methods as well as by other detectors such as scintillator with a veto counter, phoswich detector and a Bonner ball counter on trial. Preliminary experimental results are presented.
Hayashi, Naoki; Hiroki, Seiji; Saeki, Riuji; Toyokawa, Ryoji; Yamamoto, Kazami; Yoshimoto, Masahiro; Arakawa, Dai*; Hiramatsu, Shigenori*; Lee, S.*; Sato, Kenichiro*; et al.
Proceedings of 11th European Particle Accelerator Conference (EPAC '08) (CD-ROM), p.1125 - 1127, 2008/06
A 3-GeV Rapid-Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) has been commissioned recently. During its beam commissioning, various beam diagnostic instrumentation has been used. The multi-wire profile monitor (MWPM) is used to establish injection and H0 dump line. The electron catcher confirms that the beam hits a charge exchange carbon foil and the specified current monitor limits the beam current to the H0 dump. Single pass BPMs and ionization profile monitors (IPM) help to check the one pass orbit without circulation of the beam. The beam position monitor (BPM) can measure both COD and turn-by-turn position. Tune monitor system consists of exciter and its own BPM. The exciter shakes the beam and coherent oscillation. Dedicated BPMs, Fast CT (FCT) and Wall Current Monitor (WCM) are used for RF feedback or feedfoward control. It will describe the performance of each instruments and how they are contributed to the successful beam commissioning.
Hayashi, Naoki; Hiroki, Seiji; Saeki, Riuji; Toyokawa, Ryoji*; Yamamoto, Kazami; Arakawa, Dai*; Hiramatsu, Shigenori*; Lee, S.*; Sato, Kenichiro*; Tejima, Masaki*; et al.
Proceedings of 11th European Particle Accelerator Conference (EPAC '08) (CD-ROM), p.1128 - 1130, 2008/06
The Beam Position Monitor (BPM) system of the J-PARC RCS has been fabricated, installed and operated successfully during the beam commissioning. There are 54 BPMs around the ring and most of them are placed inside steering magnets. The BPM is electro static type and it has four electrodes. A pair of electrode gives a linear response with diagonal cut shape and they were calibrated before their installation. The signal processing unit, which is equipped with 14-bit 14MSPS ADC and 600MHz DSP, has been developed for the system. In order to measure small signal, especially during the initial phase of the commissioning, careful design also done for cabling. The paper presents the current performance of the system.
Watanabe, Takehito*; Arakawa, Hiroyuki*; Kajimoto, Tsuyoshi*; Iwamoto, Yosuke; Satoh, Daiki; Kunieda, Satoshi; Noda, Shusaku*; Shigyo, Nobuhiro*; Ishibashi, Kenji*; Nakamura, Takashi*; et al.
Nuclear Instruments and Methods in Physics Research A, 587(1), p.20 - 28, 2008/03
Times Cited Count:1 Percentile:13.75(Instruments & Instrumentation)We have developed a phoswich detector for neutron spectrometry, which adopts a reversed configuration of slow- and fast-decay-time scintillators in its inner and surrounding outer regions, respectively, in the detection of recoil protons from a hydrogenous radiator. The phoswich detector consists of an inner slow, NaI(Tl) scintillator, and an outer fast, plastic scintillator. The response functions of the phoswich detector were measured for neutron energies ranging from 100 to 350 MeV. The experiment used the recoil-proton method and pulse-shape discrimination with the two-gate integration technique using a spallation neutron source at the WNR facility of the LANSCE. To evaluate the effectiveness of the phoswich configuration, full energy deposition fraction was calculated. The calculation confirmed that the phoswich detector with a reversed configuration is useful for neutron measurements.
Hayashi, Naoki; Hiroki, Seiji; Saha, P. K.; Saeki, Riuji; Toyokawa, Ryoji*; Yamamoto, Kazami; Yoshimoto, Masahiro; Arakawa, Dai*; Hiramatsu, Shigenori*; Lee, S.*; et al.
Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.243 - 245, 2008/00
The J-PARC RCS has been beam commissioned since fall 2007. During such a short period, the following items have been established. Establishment of the injection orbit, beam circulation, acceleration up to 3GeV, optics parameters measurements and it achieved 50 kW beam power (410 ppb). The beam monitor system has an important role for smooth beam commissioning. This paper describes the status of the beam monitor system, BPM, Injection monitors, IPM, current monitor, tune meter and BLM of the RCS.