Refine your search:     
Report No.
 - 
Search Results: Records 1-7 displayed on this page of 7
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Improvement for the stable operation in the super compactor

Sudo, Tomoyuki; Mimura, Ryuji; Ishihara, Keisuke; Satomi, Shinichi; Myodo, Masato; Momma, Toshiyuki; Kozawa, Kazushige

JAEA-Technology 2011-015, 24 Pages, 2011/06

JAEA-Technology-2011-015.pdf:2.28MB

The super compactor in the Advanced Volume Reduction Facilities (AVRF) treats metal wastes mainly generated from research reactors in the Nuclear Science Research Institute of JAEA. Those wastes are compacted from one third to one fourth with maximum 2,000-ton force. In the trial operation using simulated wastes, some technical problems were found to be improve for the stable operation. One problem is the motion mechanism for carrying wastes before and after compaction. The other problem is the mechanism for treating the irregular supercompacted products. In this report, we describe the detail and the result of improvement on those problems for the stable operation in the super compactor.

JAEA Reports

Removal of the liquid waste storage tank LV-2 in JRTF, 2; Removal works

Kanayama, Fumihiko; Hagiya, Kazuaki; Sunaoshi, Mizuho; Muraguchi, Yoshinori; Satomi, Shinichi; Nemoto, Koichi; Terunuma, Akihiro; Shiraishi, Kunio; Ito, Shinichi

JAEA-Technology 2011-011, 36 Pages, 2011/06

JAEA-Technology-2011-011.pdf:2.53MB

Dismantling activities of equipments in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. Removing out of the large liquid waste storage tank LV-2 as a whole tank without cutting in pieces from the annex building B to confirm safety and efficiency of this method started from 2006. After preparatory works, ceiling of LV-2 room was opened, and LV-2 was transferred. Useful data were collected on manpower, radiation control and waste amount through the preparatory works, and work efficiency was analyzed by use of these data.

JAEA Reports

Evaluation of void ratio of the solidified wastes containing supercompacted wastes

Sudo, Tomoyuki; Nakashio, Nobuyuki; Osugi, Takeshi; Mimura, Ryuji; Ishihara, Keisuke; Satomi, Shinichi; Myodo, Masato; Momma, Toshiyuki; Kozawa, Kazushige

JAEA-Technology 2010-041, 38 Pages, 2011/01

JAEA-Technology-2010-041.pdf:4.73MB

The super compactor in the AVRF treats compactible metal wastes mainly generated from research reactors in the Nuclear Science Research Institute of JAEA. Those wastes are compacted with the maximum about 2,000-ton force. The supercompacted wastes are packed into the container and then immobilized with cementitious materials. The solidified wastes (containing supercompacted wastes) become an object for near surface disposal with artificial barrier. For disposal, the solidified wastes must be satisfied the technical criteria. One of the important indicators is the void ratio in the solidified wastes. In this report, we manufactured the supercompacted wastes with the ordinary treatment method for actual wastes treated in the AVRF and immobilized with a mortar grout. The void ratio of the solidified wastes were evaluated in consideration for concrete vault disposal. As a result, We confirmed the integrity of the solidified wastes from a point of view of void ratio.

Journal Articles

Maintenance management of emergency power supply equipment (uninterruptible power supply) in Tokai reprocessing plant

Nishida, Kyosuke; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

Nihon Hozen Gakkai Dai-6-Kai Gakujutsu Koenkai Yoshishu, p.294 - 297, 2009/08

Uninterruptible power supply systems are installed in the Tokai reprocessing plant in preparation for the emergency case that the commercial power supply is stopped by an accidental or intentional interruption in the supply of electricity. The uninterruptible power supply system particularly provides a temporary power source to the important devices for the radiation control of nuclear critical monitoring in the plant. Thus, the system is potentially important and essential for nuclear plants. The paper repots the current activities such as regular inspections, replacement of parts and system update, to maintain the function of uninterruptible power supply systems.

JAEA Reports

Removal of the liquid waste storage tank LV-2 in JRTF, 1; Preparatory works

Satomi, Shinichi; Kanayama, Fumihiko; Hagiya, Kazuaki; Myodo, Masato; Kobayashi, Tadayoshi; Tomii, Hiroyuki; Tachibana, Mitsuo

JAEA-Technology 2008-067, 53 Pages, 2008/10

JAEA-Technology-2008-067.pdf:8.66MB

Dismantling activities of equipments in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. The large liquid waste storage tank LV-2 is scheduled to remove out as a whole tank without cutting in pieces from the annex building B to confirm safety and efficiency of this method from 2006. Before removal of the LV-2 tank, some preparatory works were carried out such as opening of concrete wall (LV-2 room) for the entrance of workers and materials, removal of pipes connected to the LV-2 tank, and decontamination of radioactive sludge in the LV-2 tank. Useful data were collected on manpower, radiation control and waste amount through the preparatory works, and work efficiency was analyzed by use of these data. It was compared manpower between core boring and hand-breaker crushing activities in the concrete wall opening work. It was also confirmed that local exposure of worker could be reduced in large extent by an addition of vinyl chloride cover on worker's ventilated suit.

Oral presentation

One piece removal of liquid waste storage tank LV-2, 1; Preparation

Kanayama, Fumihiko; Satomi, Shinichi; Myodo, Masato; Tomii, Hiroyuki; Tachibana, Mitsuo

no journal, , 

no abstracts in English

Oral presentation

The Construction of an intensive monitoring system for power supply stations in the Tokai reprocessing plant

Aoki, Kenji; Hiyama, Hisao; Shibata, Satomi; Iwasaki, Shogo; Inami, Shinichi

no journal, , 

There are plural facilities having a radiation controlled area in the Tokai reprocessing plant, and an uninterruptible power supply system which considered a blackout is necessary for the power supply to each facility from the viewpoint of radiological management and nuclear material containment. In addition, at the time of the power supplying abnormality, intelligence gathering is necessary for prompt measures and restoration. In this report, the intensive monitoring system, which aimed for the unification of the power supply monitor place and the acceleration of the intelligence gathering to detect a power supply abnormality point, is described.

7 (Records 1-7 displayed on this page)
  • 1