Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Sai, Masataka; Hagiwara, Hiroki; Matsushima, Hiroyuki*; Noda, Masatoshi*; Noda, Masaru*; Ando, Kenichi*; Tanaka, Tatsuya*; Ueda, Tadashi*; Honda, Yuko*; Mizuno, Takashi
JAEA-Data/Code 2010-010, 75 Pages, 2010/09
This report compiles data set of the groundwater chemistry obtained at Mizunami Underground Research Laboratory (MIU) between the fiscal year 2004 and the fiscal year 2007. These data includes groundwater chemistry of inflow in the shafts and sampled groundwater in the boreholes, which drilled from sub-stages of MIU and from surface (MSB-2, MSB-4, and MIZ-1). Basic information (e.g. sampling location, sampling date, sampling method, analytical method) are also described in terms of quality control and traceability.
Akiyoshi, Kenji*; Mikake, Shinichiro; Kaneda, Tsutomu*; Noda, Masatoshi*
Tonneru Kogaku Hokokushu (CD-ROM), 17, p.105 - 111, 2007/11
The purpose of this study grasps the effect of the solidified shape as the auxiliary method for ground improvement of deep shaft excavation in weathered rock.
Mikake, Shinichiro; Sato, Toshinori; Yamamoto, Masaru; Akiyoshi, Kenji*; Kaneda, Tsutomu*; Noda, Masatoshi*
no journal, ,
Current Status of Mizunami Underground Research Laboratory -Construction and Research Programme-
Matsui, Hiroya; Mikake, Shinichiro; Takeuchi, Shinji; Noda, Masatoshi*
no journal, ,
Pre-excavation grouting for the shelter at 200m depth horizontal research tunnel at Mizunami Underground Research Laboratory has been carried out at Mizunami, Gifu. The results of pre-grouting and related Lugeon test with 19 boreholes, hydraulic heterogeniety of the rock mass has been understood.
Uyama, Masao*; Noda, Masatoshi*; Noda, Masaru*; Hasegawa, Hiroshi*; Matsui, Hiroya; Suzuki, Yohei*; Hamako, Tadashi*; Tanaka, Yuji*
no journal, ,
Dynamic injection method increase the penetration of grout material and apply the grouting of small and low permeable crack in rock mass. This paper report the results of in-situ dynamic injection under high water pressure condition by using of the developed system reported Part1. This test used the borehole drilled in collaboration study between JAEA and AIST and the budget is a part of contract study from NISA.