Refine your search:     
Report No.
 - 
Search Results: Records 1-7 displayed on this page of 7
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Synchronized gravitational slope deformation and active faulting; A Case study on and around the Neodani fault, central Japan

Komura, Keitaro*; Kaneda, Heitaro*; Tanaka, Tomoki*; Kojima, Satoru*; Inoue, Tsutomu*; Nishio, Tomohiro

Geomorphology, 365, p.107214_1 - 107214_22, 2020/09

 Times Cited Count:1 Percentile:9.84(Geography, Physical)

On the basis of pit excavations and sediment cores at an off-fault deep-seated gravitational slope deformation (DGSD) site and a trench excavation across the active Neodani fault at a nearby site, we examined the records of DGSD and surface-rupturing paleoearthquakes of the Neodani fault. We found the four most recent DGSD events and the four most recent surface-rupturing earthquakes, respectively and conclude that the ages of events are overlapped each other. We infer that static crustal strain from repeated seismogenic faulting plays an important role in the occurrence of DGSD events, at least in the immediate vicinity of active faults, although coseismic severe shaking would have at least some effect on them. Our case study suggests that off-fault DGSDs can be used to reconstruct or refine the paleoseismic history of a nearby active fault.

JAEA Reports

Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2014); Development of recovery and mitigation technology on excavation damage (Contract research)

Fukaya, Masaaki*; Hata, Koji*; Akiyoshi, Kenji*; Sato, Shin*; Takeda, Nobufumi*; Miura, Norihiko*; Uyama, Masao*; Kaneda, Tsutomu*; Ueda, Tadashi*; Hara, Akira*; et al.

JAEA-Technology 2016-002, 195 Pages, 2016/03

JAEA-Technology-2016-002.pdf:46.3MB
JAEA-Technology-2016-002-appendix(CD-ROM).zip:16.11MB

The researches on examination of the plug applied to the future reflood test was conducted as a part of (5) development of technologies for restoration and/on reduction of the excavation damage relating to the engineering technology in the MIU (2014), specifically focused on (1) plug examination (e.g. functions, structure and material) and the quality control methods and (2) analytical evaluation of rock mass behavior around the plug through the reflood test. As the result, specifications of the plug were determined. These specifications should be able to meet requirements for the safety structure and surrounding rock mass against predicted maximum water pressure, temperature stress and seismic force, and for controlling the groundwater inflow, ensuring the access into the reflood gallery and the penetration performance of measurement cable. Also preliminary knowledge regarding the rock mass behavior around the plug after flooding the reflood gallery by installed plug was obtained.

JAEA Reports

Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2013); Development of recovery and mitigation technology on excavation damage (Contract research)

Fukaya, Masaaki*; Hata, Koji*; Akiyoshi, Kenji*; Sato, Shin*; Takeda, Yoshinori*; Miura, Norihiko*; Uyama, Masao*; Kaneda, Tsutomu*; Ueda, Tadashi*; Toda, Akiko*; et al.

JAEA-Technology 2014-040, 199 Pages, 2015/03

JAEA-Technology-2014-040.pdf:37.2MB

The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) project consists of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security, and (5) development of technologies for restoration and/or reduction of the excavation damage. The researches on engineering technology such as verification of the initial design were being conducted by using data measured during construction as a part of the second phase of the MIU plan. Examination about the plug for reflood test in the GL-500m Access/Research Gallery-North as part of the development of technologies for restoration and/or reduction of excavation damage were carried out. Specifically, Literature survey was carried out about the plug, based on the result of literature survey, examination of the design condition, design of the plug and rock stability using numerical simulation, selection of materials for major parts, and grouting for water inflow from between rock and plug, were carried out in this study.

JAEA Reports

Study on engineering technologies in the Mizunami Underground Research Laboratory; FY2012 (Contract research)

Fukaya, Masaaki*; Noda, Masaru*; Hata, Koji*; Takeda, Yoshinori*; Akiyoshi, Kenji*; Ishizeki, Yoshikazu*; Kaneda, Tsutomu*; Sato, Shin*; Shibata, Chihoko*; Ueda, Tadashi*; et al.

JAEA-Technology 2014-019, 495 Pages, 2014/08

JAEA-Technology-2014-019.pdf:82.23MB

The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) plan consists of (1) research on engineering technology deep underground, and (2) research on engineering technology as a basis of geological disposal. The former research is mainly aimed in this study, which is categorized in (a) development of design and construction planning technologies, (b) development of construction technologies, (c) development of countermeasure technologies, and (d) development of technologies for security. In this study, the researches on engineering technology are being conducted in these four categories by using data measured during construction as a part of the second phase of the MIU plan.

Journal Articles

An Example of MIZ-1 borehole drilling at Mizunami Underground Research Laboratory; Large diameter control borehole core drilling

Kaneda, Tsutomu*

Tonneru To Chika, 40(2), p.148 - 149, 2009/02

An overview of the directional control borehole drilling applied to the MIZ-1 borehole drilling at the Mizunami Underground Research Laboratory is described as an example of the control borehole drilling reamed with outer casing.

Journal Articles

The Countermeasure against rock fall during ultra deep shift sinking an unstable ground

Akiyoshi, Kenji*; Mikake, Shinichiro; Kaneda, Tsutomu*; Noda, Masatoshi*

Tonneru Kogaku Hokokushu (CD-ROM), 17, p.105 - 111, 2007/11

The purpose of this study grasps the effect of the solidified shape as the auxiliary method for ground improvement of deep shaft excavation in weathered rock.

Oral presentation

Current status of Mizunami Underground Research Laboratory, 6; Construction and research programme

Mikake, Shinichiro; Sato, Toshinori; Yamamoto, Masaru; Akiyoshi, Kenji*; Kaneda, Tsutomu*; Noda, Masatoshi*

no journal, , 

Current Status of Mizunami Underground Research Laboratory -Construction and Research Programme-

7 (Records 1-7 displayed on this page)
  • 1