Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Suzuki, Minoru*; Takase, Yuki*; Sakai, Takaaki*; Takata, Takashi; Doda, Norihiro
no journal, ,
With an aim to establish a quantitative risk assessment of accident managements (AMs) for various external hazards, the plant dynamics analyses with Continuous Markov Chain Monte Carlo (CMMC) method were carried out to assess repeatedly occurred multi-failures by volcano ash in volcanic eruption event. AM repetition of the filter exchange to recover the cooling function of the air coolers were considered. The results showed that this method can evaluate the effectiveness of AM measures against volcanic ash fall events with respect to time progress.
Takase, Yuki; Miura, Yasushi; Nakabayashi, Hiroki
no journal, ,
Tokai Reprocessing plant (TRP), which temporarily suspended the reprocessing of spent fuel in 2007, moved to decommissioning in 2018 without restarting operations. Under the decommissioning situation, the high-level radioactive liquid waste generated in the past reprocessing operation is the highest potential risk in TRP. These high-level radioactive liquid wastes are stored in High Active Liquid Waste Storage Facility (HAW) and sequentially Vitrified in Tokai Vitrification Facility (TVF). The serious accident risk about evaporation accident of high radioactive liquid waste has been remained in both facilities. In this study, a loss of heat sink (LOHS) frequency of high radioactive liquid waste in HAW and TVF was assessed by Probability Risk Assessment (PRA). The risk information was extracted for the equipment of important of safety related system from the view point of maintaining the facility safety. Its capability to maintenance planning was evaluated.