Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

CFD analysis of natural circulation in LBE-cooled accelerator-driven system

Sugawara, Takanori; Watanabe, Nao; Ono, Ayako; Nishihara, Kenji; Ichihara, Kyoko*; Hanzawa, Kohei*

Proceedings of 19th International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-19) (Internet), 10 Pages, 2022/03

Japan Atomic Energy Agency (JAEA) has investigated an accelerator-driven system (ADS) to transmute minor actinides (MAs) included in high level wastes discharged from nuclear power plants. The ADS is a lead-bismuth cooled tank-type reactor with 800 MW thermal power. It is supposed that the ADS is safer than conventional critical reactors because it is operated in a subcritical state. The previous study performed the transient analyses for the typical ADS accidents such as unprotected loss of flow or beam overpower. It was shown that all calculation cases except loss of heat sink (LOHS) satisfied the no-damage criteria. To avoid the damage by LOHS, the ADS equips Direct Reactor Auxiliary Cooling System (DRACS) to remove the decay heat. The most important points of a DRACS operation are its reliability and to ensure the flowrate in a natural circulation state. This study aims to perform the CFD analysis of the natural circulation to clarify the flowrate in the ADS reactor vessel.

Journal Articles

Current status of the muon initial acceleration with RFQ for muon g-2/EDM experiment

Kitamura, Ryo*; Otani, Masashi*; Fukao, Yoshinori*; Kawamura, Naritoshi*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Kondo, Yasuhiro; Hasegawa, Kazuo; Ishida, Katsuhiko*; et al.

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.476 - 479, 2016/11

The muon linear accelerator for the muon g-2/EDM experiment in J-PARC is being developed. As the first step of the muon acceleration, the muon acceleration with J-PARC RFQ (Radio-Frequency Quadrupole)-II plans to be demonstrated at H-line of J-PARC MLF. The slow muon will be obtained by the deceleration using the thin metal foil target in the RFQ acceleration test. The intensity of the decelerated muon by the thin metal foil was measured. Based on this result, the beam intensity in the RFQ test at H-line is estimated to be a few /sec. The particle simulation of the RFQ and the following beam diagnostics system is conducted, and it is shown that the emittance measurement at the RFQ exit using the micro-channel plate based beam profile monitor is feasible.

Oral presentation

Current preparation status of the muon RF acceleration test with the RFQ for the precision measurement of the muon g-2/EDM

Kitamura, Ryo*; Fukao, Yoshinori*; Ishida, Katsuhiko*; Hasegawa, Kazuo; Hanzawa, Kohei*; Kawamura, Naritoshi*; Kim, B.*; Kondo, Yasuhiro; Mibe, Tsutomu*; Miyake, Yasuhiro*; et al.

no journal, , 

no abstracts in English

3 (Records 1-3 displayed on this page)
  • 1