Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 68

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation

Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.

Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09

 Times Cited Count:6 Percentile:84.97(Nuclear Science & Technology)

In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.

JAEA Reports

Tritium removal of heavy water system and helium system in FUGEN

Takiya, Hiroaki; Kadowaki, Haruhiko; Matsushima, Akira; Matsuo, Hidehiko; Ishiyama, Masahiro; Aratani, Kenta; Tezuka, Masashi

JAEA-Technology 2020-001, 76 Pages, 2020/05

JAEA-Technology-2020-001.pdf:6.06MB

Advanced Thermal Reactor (ATR) FUGEN was operated for about 25 years, and now has been proceeding decommissioning after the approval of the decommissioning plan in Feb. 2008. The reactor, heavy water system and helium system are contaminated by tritium because of neutron absorption of heavy water, which is a moderator. Before dismantling these facilities, it is necessary to remove tritium from them for not only reducing the amount of tritium released to surrounding environment and the risk of internal exposure by tritium but also ensuring the workability. In first phase of decommissioning (Heavy Water and Other system Decontamination Period), tritium decontamination of the reactor, heavy water system and helium system started in 2008 and completed in 2018. This report shows the results of tritium decontamination of the reactor, heavy water system and helium system.

Journal Articles

Characterization of the PTW 34031 ionization chamber (PMI) at RCNP with high energy neutrons ranging from 100 - 392 MeV

Theis, C.*; Carbonez, P.*; Feldbaumer, E.*; Forkel-Wirth, D.*; Jaegerhofer, L.*; Pangallo, M.*; Perrin, D.*; Urscheler, C.*; Roesler, S.*; Vincke, H.*; et al.

EPJ Web of Conferences, 153, p.08018_1 - 08018_5, 2017/09

 Times Cited Count:0 Percentile:0.03(Nuclear Science & Technology)

At CERN, gas-filled ionization chambers PTW-34031 (PMI) are commonly used in radiation fields including neutrons, protons and $$gamma$$-rays. A response function for each particle is calculated by the radiation transport code FLUKA. To validate a response function to high energy neutrons, benchmark experiments with quasi mono-energetic neutrons have been carried out at RCNP, Osaka University. For neutron irradiation with energies below 200 MeV, very good agreement was found comparing the FLUKA simulations and the measurements. In addition it was found that at proton energies of 250 and 392 MeV, results calculated with neutron sources underestimate the experimental data due to a non-negligible gamma component originating from the target $$^{7}$$Li(p,n)Be reaction.

Journal Articles

Shielding experiments of concrete and iron for the 244 MeV and 387 MeV quasi-mono energetic neutrons using a Bonner sphere spectrometer (at RCNP, Osaka Univ.)

Matsumoto, Tetsuro*; Masuda, Akihiko*; Nishiyama, Jun*; Iwase, Hiroshi*; Iwamoto, Yosuke; Satoh, Daiki; Hagiwara, Masayuki*; Yashima, Hiroshi*; Yashima, Hiroshi*; Shima, Tatsushi*; et al.

EPJ Web of Conferences, 153, p.08016_1 - 08016_3, 2017/09

 Times Cited Count:1 Percentile:61.21(Nuclear Science & Technology)

Neutron energy spectra behind concrete and iron shields were measured for quasi-monoenergetic neutrons above 200 MeV using a Bonner sphere spectrometer (BSS). Quasi-monoenergetic neutrons were produced by the $$^{7}$$Li(p,xn) reaction with 246-MeV and 389-MeV protons. The response function of BSS was also measured at neutron energies from 100 MeV to 387 MeV. In data analysis, the measured response function was used and the multiple neutron scattering effect between the BSS and the shielding material was considered. The neutron energy spectra behind the concrete and iron shields were obtained by the unfolding method using the MAXED code. Ambient dose equivalents were obtained as a function of a shield thickness successfully. For the case of the 244 MeV neutron incidence, the multiple neutron scattering effect on the effective dose is large under 50 cm thickness of the concrete shield.

Journal Articles

Applicability of the two-angle differential method to response measurement of neutron-sensitive devices at the RCNP high-energy neutron facility

Masuda, Akihiko*; Matsumoto, Tetsuro*; Iwamoto, Yosuke; Hagiwara, Masayuki*; Satoh, Daiki; Sato, Tatsuhiko; Iwase, Hiroshi*; Yashima, Hiroshi*; Nakane, Yoshihiro; Nishiyama, Jun*; et al.

Nuclear Instruments and Methods in Physics Research A, 849, p.94 - 101, 2017/03

 Times Cited Count:1 Percentile:10.62(Instruments & Instrumentation)

Quasi-monoenergetic high-energy neutron fields induced by $$^{7}$$Li(p,n) reactions are used for the response evaluation of neutron-sensitive devices. The quasi-monoenergetic high-energy field consists of high-energy monoenergetic peak neutrons and unwanted continuum neutrons down to the low-energy region. A two-angle differential method has been developed to compensate for the effect of the continuum neutrons in the response measurements. In this study, the two-angle differential method was demonstrated for Bonner sphere detectors, which are typical examples of moderator-based neutron-sensitive detectors, to investigate the method's applicability and its dependence on detector characteristics. Through this study, the adequacy of the two-angle differential method was experimentally verified, and practical suggestions were made pertaining to this method.

Journal Articles

Operator's contribution on the improvement of RII scheme against the process operation at PCDF

Nakamura, Hironobu; Shimizu, Yasuyuki; Makino, Risa; Mukai, Yasunobu; Ishiyama, Koichi; Kurita, Tsutomu; Ikeda, Atsushi*; Yamaguchi, Katsuhiro*

Proceedings of INMM 57th Annual Meeting (Internet), 9 Pages, 2016/07

Regarding the Integrated Safeguards (IS) in Japan, the implementation of IS has been started on September 2004, and the concept has been introduced to the JNC-1 facilities since August 2008. Then, random interim inspection with short notice and reducing person-days of inspection (PDI) was introduced instead of traditional scheduled IIV in order to improve deterrence of the nuclear material diversion with timeliness goal. And it was agreed that it should be evaluated and reviewed because RII was designed when inter-campaign. In JAEA, we decided to restart PCDF campaign to reduce potential safety risks of reprocessing facilities. To adopt the RII scheme to the process operation in campaign, JAEA proposed a new scheme to JSGO and IAEA without increasing PDI and reducing detection probability. As a result of the discussion, it was agreed and successfully introduced since March 2014. The new scheme for PCDF consists of scheduled inspection (fixed-day RII), reduction of estimated material for the verification, implementation of remote monitoring with data provision, improvement of operational status check list, introduction of NRTA and MC&A data declaration with timeliness. Though the operator's workloads for information provision were increased, we could manage to balance IS requirement with implementation of our operation successfully. This contribution was helped to safeguards implementation and our operation for 2 years.

Journal Articles

Development of evaluation procedure for critical current of periodically bent Nb$$_{3}$$Sn strand

Kajitani, Hideki; Ishiyama, Atsushi*; Agatsuma, Ko*; Murakami, Haruyuki; Hemmi, Tsutomu; Koizumi, Norikiyo

Teion Kogaku, 50(12), p.608 - 615, 2015/12

A cable-in-conduit (CIC) conductor using Nb$$_{3}$$Sn strand is applied to an ITER TF coil. The Nb$$_{3}$$Sn strand in the conductor is periodically bent due to electromagnetic force, which causes degradation of performance. This degradation should be evaluated to predict conductor critical current performance. In a past study, a numerical simulation model was developed to evaluate the superconductivity of a periodically bent single strand. However, this model is not suitable for application to strands in the conductor because of the extensive calculation time. The author thus developed a new analytical model with a much shorter calculation time to evaluate the performance of periodically bent strand. This new model uses the classical model concept of a high transverse resistance model (HTRM). The calculated results show good agreement with the test results of a periodically bent Nb$$_{3}$$Sn strand. This indicates that a more practical solution can be achieved when evaluating the performance of periodically bent strands. Thus, the model developed in this study can be applied to evaluate the performance of conductors incorporating many strands.

Journal Articles

Tuning of ultra-slow muon transport system

Adachi, Taihei*; Ikedo, Yutaka*; Nishiyama, Kusuo*; Yabuuchi, Atsushi*; Nagatomo, Takashi*; Strasser, P.*; Ito, Takashi; Higemoto, Wataru; Kojima, Kenji*; Makimura, Shunsuke*; et al.

JPS Conference Proceedings (Internet), 8, p.036017_1 - 036017_4, 2015/09

Journal Articles

Dismantlement of large fusion experimental device JT-60U

Ikeda, Yoshitaka; Okano, Fuminori; Sakasai, Akira; Hanada, Masaya; Akino, Noboru; Ichige, Hisashi; Kaminaga, Atsushi; Kiyono, Kimihiro; Kubo, Hirotaka; Kobayashi, Kazuhiro; et al.

Nihon Genshiryoku Gakkai Wabun Rombunshi, 13(4), p.167 - 178, 2014/12

The JT-60U torus was disassembled so as to newly install the superconducting tokamak JT-60SA torus. The JT-60U used the deuterium for 18 years, so the disassembly project of the JT-60U was the first disassembly experience of a fusion device with radioactivation in Japan. All disassembly components were stored with recording the data such as dose rate, weight and kind of material, so as to apply the clearance level regulation in future. The lessons learned from the disassembly project indicated that the cutting technologies and storage management of disassembly components were the key factors to conduct the disassembly project in an efficient way. After completing the disassembly project, efforts have been made to analyze the data for characterizing disassembly activities, so as to contribute the estimation of manpower needs and the radioactivation of the disassembly components on other fusion devices.

Journal Articles

Safe disassembly and storage of radioactive components of JT-60U torus

Ikeda, Yoshitaka; Okano, Fuminori; Hanada, Masaya; Sakasai, Akira; Kubo, Hirotaka; Akino, Noboru; Chiba, Shinichi; Ichige, Hisashi; Kaminaga, Atsushi; Kiyono, Kimihiro; et al.

Fusion Engineering and Design, 89(9-10), p.2018 - 2023, 2014/10

 Times Cited Count:2 Percentile:16.44(Nuclear Science & Technology)

Disassembly of the JT-60U torus was started in 2009 after 18-years D$$_{2}$$ operations, and was completed in October 2012. The JT-60U torus was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to D-D reactions. Since this work is the first experience of disassembling a large radioactive fusion device in Japan, careful disassembly activities have been made. About 13,000 components cut into pieces with measuring the dose rates were removed from the torus hall and stored safely in storage facilities by using a total wokers of 41,000 person-days during 3 years. The total weight of the disassembly components reached up to 5,400 tons. Most of the disassembly components will be treated as non-radioactive ones after the clearance verification under the Japanese regulation in future. The assembly of JT-60SA has started in January 2013 after this disassembly of JT-60U torus.

Journal Articles

Development status of control system for IFMIF/EVEDA prototype accelerator

Takahashi, Hiroki; Narita, Takahiro; Nishiyama, Koichi; Usami, Hiroki; Sakaki, Hironao; Kasugai, Atsushi; Kojima, Toshiyuki*

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.799 - 802, 2014/10

no abstracts in English

Journal Articles

Measurement of neutron energy spectra behind shields for quasi-monoenergetic neutrons generated by 246-MeV and 389-MeV protons using a Bonner sphere spectrometer

Matsumoto, Tetsuro*; Masuda, Akihiko*; Nishiyama, Jun*; Harano, Hideki*; Iwase, Hiroshi*; Iwamoto, Yosuke; Hagiwara, Masayuki*; Satoh, Daiki; Yashima, Hiroshi*; Nakane, Yoshihiro; et al.

Progress in Nuclear Science and Technology (Internet), 4, p.332 - 336, 2014/04

Recently, many high-energy accelerators are used for various fields. Shielding data for high-energy neutrons are therefore very important from the point of view of radiation protection in high energy accelerator facilities. However, the shielding experimental data for high energy neutrons above 100 MeV are very poor both in quality and in quantity. In this study, neutron penetration spectral fluence and ambient dose through iron and concrete shields were measured with a Bonner sphere spectrometer (BSS). Quasi-monoenergetic neutrons were produced by the $$^{7}$$Li(p,xn) reaction by bombarding a 1-cm thick Li target with 246-MeV and 389-MeV protons in the Research Center for Nuclear Physics (RCNP) of the Osaka University. Shielding materials are iron blocks with a thickness from 10 cm to 100 cm and concrete blocks with a thickness from 25 cm to 300 cm.

JAEA Reports

Storage management of disassembled and radioactive components of JT-60 tokamak device; Storage of radioactive components by containers

Nishiyama, Tomokazu; Miyo, Yasuhiko; Okano, Fuminori; Sasajima, Tadayuki; Ichige, Hisashi; Kaminaga, Atsushi; Miya, Naoyuki; Sukegawa, Atsuhiko; Ikeda, Yoshitaka; Sakasai, Akira

JAEA-Technology 2014-006, 30 Pages, 2014/03

JAEA-Technology-2014-006.pdf:4.87MB

JT-60 tokamak device and the peripheral equipment were disassembled so as to be upgraded to the superconducting tokamak JT-60SA. The disassembled components were stored into storage and airtight containers at the radioactive control area. The total weight and the total number of those components are about 1,100 tons and about 11,500 except for large components. Radiation measurements and records of the radioactive components were required one by one under the law of Act on Prevention of Radiation Disease Due to Radioisotopes, etc. for the control of transport and storage from the radioactive control area to the other area. The storage management of the radioactive components was implemented by establishing the work procedure and the component management system by barcode tags. The radioactive components as many as 11,500 were surely and effectively stored under the law. The report gives the outline of the storage of JT-60 radioactive components by the storage containers.

JAEA Reports

Disassembly of JT-60 tokamak device and ancillary facilities for JT-60 tokamak

Okano, Fuminori; Ichige, Hisashi; Miyo, Yasuhiko; Kaminaga, Atsushi; Sasajima, Tadayuki; Nishiyama, Tomokazu; Yagyu, Junichi; Ishige, Yoichi; Suzuki, Hiroaki; Komuro, Kenichi; et al.

JAEA-Technology 2014-003, 125 Pages, 2014/03

JAEA-Technology-2014-003.pdf:13.32MB

The disassembly of JT-60 tokamak device and its peripheral equipments, where the total weight was about 5400 tons, started in 2009 and accomplished in October 2012. This disassembly was required process for JT-60SA project, which is the Satellite Tokamak project under Japan-EU international corroboration to modify the JT-60 to the superconducting tokamak. This work was the first experience of disassembling a large radioactive fusion device based on Radiation Hazard Prevention Act in Japan. The cutting was one of the main problems in this disassembly, such as to cut the wielded parts together with toroidal field coils, and to cut the vacuum vessel into two. After solving these problems, the disassembly completed without disaster and accident. This report presents the outline of the JT-60 disassembly, especially tokamak device and ancillary facilities for tokamak device.

JAEA Reports

Assembly work and transport of JT-60SA cryostat base

Okano, Fuminori; Masaki, Kei; Yagyu, Junichi; Shibama, Yusuke; Sakasai, Akira; Miyo, Yasuhiko; Kaminaga, Atsushi; Nishiyama, Tomokazu; Suzuki, Sadaaki; Nakamura, Shigetoshi; et al.

JAEA-Technology 2013-032, 32 Pages, 2013/11

JAEA-Technology-2013-032.pdf:8.86MB

Japan Atomic Energy Agency started to construct a fully superconducting tokamak experiment device, JT-60SA, to support the ITER since January, 2013 at the Fusion Research and Development Directorate in Naka, Japan. The JT-60SA will be constructed with enhancing the previous JT-60 infrastructures, in the JT-60 torus hall, where the ex-JT-60 machine was disassembled. The JT-60SA Cryostat Base, for base of the entire tokamak structure, were assembly as first step of this construction. The Cryostat Base (CB, 250 tons) is consists of 7 main made of stainless steel, 12m diameter and 3m height. It was built in the Spain and transported to the Naka site with the seven major parts split, via Hitachi port. The assembly work of these steps, preliminary measurements, sole plate adjustments of its height and flatness, and assembly of the CB. Introduces the concrete result of assembly work and transport of JT-60SA cryostat base.

JAEA Reports

Disassembly of JT-60 tokamak device

Okano, Fuminori; Ikeda, Yoshitaka; Sakasai, Akira; Hanada, Masaya; Ichige, Hisashi; Miyo, Yasuhiko; Kaminaga, Atsushi; Sasajima, Tadayuki; Nishiyama, Tomokazu; Yagyu, Junichi; et al.

JAEA-Technology 2013-031, 42 Pages, 2013/11

JAEA-Technology-2013-031.pdf:18.1MB

The disassembly of JT-60 tokamak device and its peripheral equipments, where the total weight was about 6200 tons, started in 2009 and accomplished in October 2012. This disassembly was required process for JT-60SA project, which is the Satellite Tokamak project under Japan-EU international corroboration to modify the JT-60 to the superconducting tokamak. This work was the first experience of disassembling a large radioactive fusion device based on Radiation Hazard Prevention Act in Japan. The cutting was one of the main problems in this disassembly, such as to cut the wielded parts together with toroidal field coils, and to cut the vacuum vessel into two. After solving these problems, the disassembly completed without disaster and accident. This report presents the outline of the JT-60 disassembly, especially tokamak device.

Journal Articles

Operator's experience after introduction of random interim inspection at Tokai Reprocessing facilities

Makino, Risa; Ishiyama, Koichi; Kimura, Takashi; Yamazaki, Katsuyuki; Nakamura, Hironobu; Ikeda, Atsushi*; Yamaguchi, Katsuhiro*

Kaku Busshitsu Kanri Gakkai (INMM) Nihon Shibu Dai-33-Kai Nenji Taikai Rombunshu (Internet), 9 Pages, 2012/10

The Integrated Safeguards (IS) applied to JNC-1 site began from August, 2008. At that time, the inspection scheme was replaced from Interim Inventory Verification (IIV) with scheduled day to Random Interim Inspection (RII) with short notice in order to strengthen deterrent against diversion of nuclear materials. To satisfy the requirements for IS in Tokai reprocessing facilities including Tokai Reprocessing Plant and Plutonium Conversion Development Facility, we have cooperated inspectorates to establish remote monitoring systems, and to introduce RII smoothly. Though the new inspection scheme requires additional efforts which contain keeping a certain number of operators every day and declaration of interim inventory lists in a short time, the whole inspection days per year during inter-campaign could be decreased to about 60% by comparing with the conventional IIV. This paper reports the effects after introduction of RII and the future tasks to be discussed regarding RII during campaign from the operator's standpoint.

Journal Articles

Response measurement of a Bonner sphere spectrometer for high-energy neutrons

Masuda, Akihiko*; Matsumoto, Tetsuro*; Harano, Hideki*; Nishiyama, Jun*; Iwamoto, Yosuke; Hagiwara, Masayuki*; Satoh, Daiki; Iwase, Hiroshi*; Yashima, Hiroshi*; Nakamura, Takashi*; et al.

IEEE Transactions on Nuclear Science, 59(1), p.161 - 166, 2012/02

 Times Cited Count:12 Percentile:66.54(Engineering, Electrical & Electronic)

In this study, responses of Bonner sphere spectrometer (BSS) for 245 and 388 MeV neutrons was measured at RCNP, Osaka University. The neutrons are generated in the $$^{7}$$Li(p,n) reaction and its spectra consist of a high-energy peak and a continuum down to the low energy. Therefore, the observed counts of BSS caused by the continuum need to be subtracted. Adjusting a Li target angle and a collimator position, 0 deg and 30 deg component of generated neutron are available. While the 0 deg component contains both the peak and the continuum, the 30 deg component is considered to contain only the continuum. Therefore, the response of the peak is obtained. The spectra were measured using the time-of-flight (TOF) method with a NE213 scintillator.

Journal Articles

Conceptual design study for the demonstration reactor of JSFR, 6; Fuel handling system design

Chikazawa, Yoshitaka; Kato, Atsushi; Obata, Hiroyuki*; Nishiyama, Noboru; Uzawa, Masayuki*; Tozawa, Katsuhiro*; Chishiro, Ryo*

Proceedings of 19th International Conference on Nuclear Engineering (ICONE-19) (CD-ROM), 7 Pages, 2011/10

A preliminary design of the JSFR fuel handling system has been proposed. FaCT phase I results of key technology evaluations on preliminary safety assessment, a pantograph fuel handling machine, a sodium pot with two core component positions, dry spent fuel cleaning and minor actinide-bearing fresh fuel shipping cask are provided.

Journal Articles

Studies on possibility for alleviation of lifestyle diseases by low-dose irradiation or radon inhalation

Kataoka, Takahiro*; Sakoda, Akihiro*; Yoshimoto, Masaaki*; Nakagawa, Shinya*; Toyota, Teruaki*; Nishiyama, Yuichi*; Yamato, Keiko*; Ishimori, Yuu; Kawabe, Atsushi*; Hanamoto, Katsumi*; et al.

Radiation Protection Dosimetry, 146(1-3), p.360 - 363, 2011/07

 Times Cited Count:6 Percentile:44.28(Environmental Sciences)

Our previous studies showed the possibility that activation of the antioxidative function alleviates various oxidative damages, which are related to lifestyle diseases. Results showed that, low-dose X-ray irradiation activated superoxide dismutase and inhibits oedema following ischaemia-reperfusion. To alleviate ischaemia-reperfusion injury with transplantation, the changes of the antioxidative function in liver graft using low-dose X-ray irradiation immediately after exenteration were examined. Results showed that liver grafts activate the antioxidative function as a result of irradiation. In addition, radon inhalation enhances the antioxidative function in some organs, and alleviates alcohol-induced oxidative damage of mouse liver. Moreover, in order to determine the most effective condition of radon inhalation, mice inhaled radon before or after carbon tetrachloride (CCl$$_{4}$$) administration. Results showed that radon inhalation alleviates CCl$$_{4}$$-induced hepatopathy, especially prior inhalation. It is highly possible that adequate activation of antioxidative functions induced by low-dose irradiation can contribute to preventing or reducing oxidative damages, which are related to lifestyle diseases.

68 (Records 1-20 displayed on this page)