Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Development of "MOX weighing and Ball-mill blending" based on experience in operation and maintenance of MOX fuel manufacturing equipment

Kawasaki, Kohei; Ono, Takanori; Shibanuma, Kimikazu; Goto, Kenta; Aita, Takahiro; Okamoto, Naritoshi; Shinada, Kenta; Ichige, Hidekazu; Takase, Tatsuya; Osaka, Yuki; et al.

JAEA-Technology 2022-031, 91 Pages, 2023/02

JAEA-Technology-2022-031.pdf:6.57MB

The document for back-end policy opened to the public in 2018 by Japan Atomic Energy Agency (hereafter, JAEA) states the decommissioning of facilities of Nuclear Fuel Cycle Engineering Laboratories and JAEA have started gathering up nuclear fuel material of the facilities into Plutonium Fuel Production Facilities (hereafter, PFPF) in order to put it long-term, stable and safe storage. Because we planned to manufacture scrap assemblies almost same with Monju fuel assembly using unsealed plutonium-uranium mixed-oxide (hereafter, MOX) powder held in PFPF and transfer them to storage facilities as part of this "concentration" task of nuclear fuel material, we obtained permission to change the use of nuclear fuel material in response to the new regulatory Requirements in Japan for that. The amount of plutonium (which is neither sintered pellets nor in a lidded powder-transport container) that could be handled in the pellet-manufacturing process was limited to 50 kg Pu or less in order to decrease the facility risk in this manufacture. Therefore, we developed and installed the "MOX weighing and blending equipment" corresponding with small batch sizes that functioned in a starting process and the equipment would decrease handling amounts of plutonium on its downstream processes. The failure data based on our operation and maintenance experiences of MOX fuel production facilities was reflected in the design of the equipment to further improve reliability and maintainability in this development. The completed equipment started its operation using MOX powder in February 2022 and the design has been validated through this half-a-year operation. This report organizes the knowledge obtained through the development of the equipment, the evaluation of the design based on the half-a-year operation results and the issues in future equipment development.

JAEA Reports

Decommissioning of Pre-dismantling Temporary Waste Storage Facility 3 (FPG-03a,b,c) in Plutonium Fuel Production Facility

Shinozaki, Masaru; Aita, Takahiro; Iso, Takahito*; Odakura, Manabu*; Haginoya, Masahiro*; Kadowaki, Hiroyuki*; Kobayashi, Shingo*; Inagawa, Takumu*; Morimoto, Taisei*; Iso, Hidetoshi; et al.

JAEA-Technology 2021-043, 100 Pages, 2022/03

JAEA-Technology-2021-043.pdf:7.49MB

It is planned that the MOX (Mixed Oxide) from the decommissioned facilities in Nuclear Fuel Cycle Engineering Laboratories is going to be consolidated and stored stably and safely for a long term in Plutonium Fuel Production Facility of the Plutonium Fuel Development Center of Nuclear Fuel Cycle Engineering Laboratories. For this purpose, it is necessary to pelletize nuclear fuel materials in the facility and store them in the assembly storage (hereinafter referred to as "waste packaging work") to secure storage space in the plutonium material storage. As a countermeasure to reduce the facility risk in this waste packing work, it was decided to construct a new powder weighing and homogenization mixing facility to physically limit the amount (batch size) of nuclear fuel materials handled at the entrance of the process. In order to secure the installation space for the new facility in the powder preparation room (1) (FP-101), the pre-dismantling temporary waste storage facility 3 (FPG-03a, b, c) was dismantled and removed. This facility consists of a granulating and sizing facility, an additive mixing facility, and a receiving and delivering guided facility, which started to be used from January 1993, and was discontinued on February 3, 2012 and became a waste facility. Subsequently, the dismantling and removal of the interior equipment was carried out by pellet fabrication section for glove operation to reduce the amount of hold-up, and before the main dismantling and removal, there was almost no interior equipment except for large machinery. This report describes the dismantling and removal of the glove box and some interior equipment and peripherals of the facility, as well as the Green House setup method, dismantling and removal procedures, and issues specific to powder process equipment (dust, etc.).

Journal Articles

Enrichment of chalcophile elements in seawater accompanying the end-Cretaceous impact event

Maruoka, Teruyuki*; Nishio, Yoshiro*; Kogiso, Tetsu*; Suzuki, Katsuhiko*; Osawa, Takahito; Hatsukawa, Yuichi*; Terada, Yasuko*

GSA Bulletin, 132(9-10), p.2055 - 2066, 2020/09

 Times Cited Count:2 Percentile:13.16(Geosciences, Multidisciplinary)

JAEA Reports

None

Miyo, Hiroaki; Yoshida, Michihiro; *; Asami, Makoto*; Iso, Takahito*; *; *

PNC TN8440 96-010, 171 Pages, 1996/03

PNC-TN8440-96-010.pdf:9.98MB

None

4 (Records 1-4 displayed on this page)
  • 1