Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Fabrication and replacement work of beryllium frame and gamma-ray shield

Watahiki, Shunsuke; Hanawa, Yoshio; Asano, Norikazu; Hiyama, Kazuhisa; Ito, Sachito; Tsuboi, Kazuaki; Fukasaku, Akitomi

JAEA-Review 2012-013, 92 Pages, 2012/03

JAEA-Review-2012-013.pdf:6.74MB

This replacement work was carried out under refurbishment plan of JMTR for beryllium distortion draw to acceptable limit. And gamma-ray shield refurbishment was carried out the view point of prevention maintenance in consideration of operation plan. Fabrication of beryllium frame and gamma-ray shield was spent for two years it was finished in February, 2010. It took five months to replacement work from January 2010. In this report is presented fabrication and replacement work of beryllium frame and gamma-ray shield.

Journal Articles

Technology development for the manufacture of Nb$$_{3}$$Sn conductors for ITER Toroidal Field coils

Takahashi, Yoshikazu; Isono, Takaaki; Hamada, Kazuya; Nunoya, Yoshihiko; Nabara, Yoshihiro; Matsui, Kunihiro; Hemmi, Tsutomu; Kawano, Katsumi; Koizumi, Norikiyo; Oshikiri, Masayuki; et al.

Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 8 Pages, 2011/03

Japan Atomic Energy Agency is procuring the Nb$$_{3}$$Sn superconductors for Toroidal Field (TF) coils under the ITER project. Because manufacturing amount of Nb$$_{3}$$Sn strands is quite large compared with the past experience and required superconducting performance is higher than that of the model coils which have been fabricated and tested in the ITER-EDA, quality control technique is very important for the manufacture of the strands. Sophisticated control technique is also required for the jacketing, in order to fabricate the conductors with the precise outer diameter and without leakage at welding part. Cu dummy conductor with full length (760 m) has been fabricated successfully and all jacketing technology was confirmed through this fabrication. The fabrication of the Nb$$_{3}$$Sn conductor for TF coils will start in March 2010.

Journal Articles

Procurement of Nb$$_3$$Sn superconducting conductors in ITER

Nabara, Yoshihiro; Isono, Takaaki; Nunoya, Yoshihiko; Koizumi, Norikiyo; Hamada, Kazuya; Matsui, Kunihiro; Hemmi, Tsutomu; Kawano, Katsumi; Uno, Yasuhiro*; Seki, Shuichi*; et al.

Journal of Plasma and Fusion Research SERIES, Vol.9, p.270 - 275, 2010/08

Oral presentation

Quality control of Nb$$_3$$Sn superconducting strand for ITER TF coil

Nabara, Yoshihiro; Isono, Takaaki; Nunoya, Yoshihiko; Koizumi, Norikiyo; Hamada, Kazuya; Matsui, Kunihiro; Hemmi, Tsutomu; Oshikiri, Masayuki; Uno, Yasuhiro*; Seki, Shuichi*; et al.

no journal, , 

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1